Home / Browse projects / Satara, Maharashtra / SHREE DATTA SANKUL
SHREE DATTA SANKUL
RG-MH-27601 · RERA P52700033848 · Last updated on MahaRERA portal: 2 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE DATTA SANKUL is a Others project by KIRAN SHANKARRAO KADAM in Satara, Maharashtra, registered with MahaRERA as P52700033848 on 14 Mar 2022. Possession is promised by 31 Jan 2027. The completion date has moved by 24 months from the original filing. 23 of the 60 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE DATTA SANKUL
- TypeOthers
- Location
- JAKATWADI ROAD
- JAKATWADI
- Satara
- 415002
- Pincode415002
- RERA no.P52700033848
- ReraGenie IDRG-MH-27601
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Mar 2022
- Promised completion31 Jan 2027
- Revised completionRevised to 31 Jan 2027 (originally 31 Jan 2025)
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 2 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE DATTA SANKUL | NA | 9 | 0 | 40 | 20 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
SHREE DATTA SANKUL: 59% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership10
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mangesh Bharat Shinde | Jakatwadi | Satara |
| Shivaji Ganpat Jadhav | Jakatwadi | Satara |
| Govind Sakharam Kadam | Satara | Satara |
| SUjata Jiwandhar Chavan | Satara | Satara |
| Mahesh Kiran Pagade | Satara | Satara |
| Dipak Shivaji Devkar | Jakatwadi | Satara |
| Yashwant Mugutrao Sanas | Jakatwadi | Satara |
| Jaysing Genu Shelar | Padali | Satara |
| Hindurao Dyanu Ombase | Vadgaon | Satara |
| Madhuri Rohan Rajeshirke | Jakatwadi | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE DATTA SANKUL | NA | Rs 5.09 cr | Rs 3.86 cr |
| - | NA | Rs 36.39 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Chandrashekhar V Pawar VINAYAK PAWAR |
| Engineer | Vidya M Khole |
| Engineer | VIDYA ARJUN MIRAJKAR |
| Chartered Accountant | Rupali Kawar |
| Chartered Accountant | VITTHAL SHRIPATI JADHAV |
| Chartered Accountant | SAMADHAN RAMDAS KADAM |
| Partner | Role in project |
|---|---|
| KIRAN SHANKARRAO KADAM | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/01/2027 to complete the project
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jan 2027
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form No 1 - Shree Datta Sankul - Jun 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: Form No 2 - Shree Datta Sankul - Jun 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form No 3 - Shree Datta Sankul - Jun 26.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: ARCH CERT Form 1 Shree Datta Sankul Mar 26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: ENGG CERT Form 2 Shree Datta Sankul Mar 26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: Form no 3 Shree Datta Sankul March 26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: Form No 1 - Shree Datta Sankul - Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Form No 2 - Shree Datta Sankul - Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: Form No 3 - Shree Datta Sankul - Dec 2025.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Form No 1 - Shree Datta Sankul - Sep 2025.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Form No 2 - Shree Datta Sankul - Sep 2025.pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Form No 3 - Shree Datta Sankul - Sep 2025.pdf | 4 Oct 2025 |
| Withdrawal Update Form 1File: Form No 1 - Shree Datta Sankul - Jun 2025.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Form No 2 - Shree Datta Sankul - Jun 2025.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Form No 3 - Shree Datta Sankul - Jun 2025.pdf | 2 Aug 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Shridatta Sankul - Form No 05 Mar 2025.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 - Shree Datta Sankul - Mar 2025.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Mar 2025.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 - Shree Datta Sankul - Mar 2025.pdf | 16 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: format a.pdf | 26 Mar 2025 |
| Declaration in FORM BFile: P52700033848_FileName_0-1.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30032023.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30062023.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30092023.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30122023.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30032024.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30062024.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30092024.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 30122024.pdf | 18 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 - Shree Datta Sankul - Dec 2024.pdf | 14 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Dec 2024.pdf | 14 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Dec 2024.pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Dec 2024.pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Dec 2024.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 - Shree Datta Sankul - Dec 2024.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Dec 2024.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 - Shree Datta Sankul - Dec 2024.pdf | 25 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 Shri Datta Sankul MAR 24.pdf | 25 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 Shri Datta Sankul MAR 24.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 - Shree Datta Sankul - Jun 2024.pdf | 16 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 - Shree Datta Sankul - Sep 2024.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Jun 2024.pdf | 16 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - Shree Datta Sankul - Sep 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 - Shree Datta Sankul - Jun 2024.pdf | 16 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 - Shree Datta Sankul - Sep 2024.pdf | 16 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Shri Datta Sankul.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Shri Datta Sankul.pdf | 6 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shri Datta Sankul.pdf | 6 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Shri Datta Sankul.pdf | 6 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 Shri Datta Sankul MAR 24.pdf | 6 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_001_compressed.pdf | 14 Mar 2022 |
| Declaration in FORM BFile: B Form Dev.pdf | 9 Mar 2022 |
| Building plan approvalFile: layout (2).pdf | 7 Mar 2022 |
| Building plan approvalFile: layout.pdf | 7 Mar 2022 |
| Building plan approvalFile: NA.pdf | 7 Mar 2022 |
| Layout approvalFile: layout.pdf | 7 Mar 2022 |
| PAN CardFile: Pan kadam.pdf | 7 Mar 2022 |
| Copy of the legal title reportFile: Title Report.pdf | 7 Mar 2022 |
| Details of encumbrancesFile: Encum.pdf | 7 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: layout.pdf | 7 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: layout (2).pdf | 7 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: layout.pdf | 7 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NA.pdf | 7 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: BP 1.pdf | 7 Mar 2022 |
| Declaration about Commencement CertificateFile: Decl.pdf | 7 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 7 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf | 7 Mar 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200231338754_For_Asset_Based_Search_28_02_2022_19_08_40_859.pdf | 7 Mar 2022 |
| Proforma of Allotment letterFile: Shri Datta Draft.pdf | 7 Mar 2022 |
| Proforma of Allotment letterFile: Allotment shri datta.pdf | 7 Mar 2022 |
| OtherFile: consolidation.pdf | 7 Mar 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| RAJLAXMI HEIGHTSP52700027568 | Jakatwadi, Satara | - | Dec 2020 | Certificate Signed | Jul 2023 | Not delivered |
| Rajlaxmi Heights | AT JAKATWADI TAL DIST SATARA | 20 | - | Completed | Jan 2023 | Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE DATTA SANKUL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JAKATWADI1,100+ in Satara
Sukhodayam Villas
M/s Ultra Urban Greene Realty LLP
YASHWANT ELITE
RAHULDEV PROMOTERS SATARA
KRISHNAKUNJ VIHAR PHASE-3
Pooja Shridhar Kangralkar
SHATAKSHI TOWER
VISHAL DILIP PAWAR
SHREE VIHAR
M/s SHREE SAIDARSHAN DEVELOPERS
SHIVSAMARTH RESIDENCY
MS BHOSALE AND NALAWADE
See every Satara project, with the district possession charts
Builder: KIRAN SHANKARRAO KADAM
Kiran Shankarrao Kadam has 2 registrations on MahaRERA, including ShreeKurneshwarDarshan and SHREE DATTA SANKUL. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if SHREE DATTA SANKUL is delayed beyond 31 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE DATTA SANKUL?
The registered promoter entity is KIRAN SHANKARRAO KADAM, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE DATTA SANKUL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE DATTA SANKUL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE DATTA SANKUL?
The professionals named in the filing: Architect: Chandrashekhar V Pawar VINAYAK PAWAR; Engineer: Vidya M Khole; Engineer: VIDYA ARJUN MIRAJKAR; Chartered Accountant: Rupali Kawar; Chartered Accountant: VITTHAL SHRIPATI JADHAV; Chartered Accountant: SAMADHAN RAMDAS KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE DATTA SANKUL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback