Home / Browse projects / Thane, Maharashtra / Shree Datta Narhari Apartment

Registration lapsed No litigation declared Residential / Group Housing project

Shree Datta Narhari Apartment

By OMKAR ENTERPRISES

RG-MH-41731 · RERA P51700049472 · Last updated on MahaRERA portal: 6 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 10%
4 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Shree Datta Narhari Apartment is a Residential / Group Housing project by OMKAR ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700049472 on 15 Feb 2023. Possession was promised by 1 Dec 2025 and is now 10 months past that date. 16 of the 20 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameShree Datta Narhari Apartment
  • TypeResidential / Group Housing
  • Location
    • Badlapur
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049472
  • ReraGenie IDRG-MH-41731

Builder

  • NameOMKAR ENTERPRISES
  • Entity typePartnership
  • PartnersKESARINATH NARAHARI WADNERE, SHAILESH KESARINATH WADNERE
  • Other registrations14 more →
  • Completed3 of 15
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

10 months past promisethis monthRegisteredFeb 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Feb 2023
  • Promised completion1 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Current status

80%16 of 20 units booked
100.0%Work done, per cost certificate

Figures as on 6 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree Datta Narhari ApartmentNA5520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 10%.

Shree Datta Narhari Apartment: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Open Space22

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area500 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025
LandownerVillageDistrict
Manisha SherikarBadlapur (M Cl)Thane
Aalhad SherikarBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgoan Badlapur Municipal Council
Permissible FSI872.72
Proposed, not sanctioned873 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBadlapur
Estimated costRs 2.67 cr
Cost incurredRs 2.67 cr
Work done100.0%
BuildingWingEstimatedIncurred
Shree Datta Narhari ApartmentNARs 2.40 crRs 2.40 cr
-NARs 26.70 lakhRs 26.70 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Rahul Shrikhande & Associates
EngineerAtul Kudtarkar & Associates
EngineerAtul Kudtarkar and Associates Pvt Ltd
Chartered AccountantA S K A & CO
PartnerRole in project
OMKAR ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sept 25.pdf6 Jan 2026
Withdrawal Update Form 2File: Form 2 sept 25.pdf6 Jan 2026
Withdrawal Update Form 3File: Form 3 Shree Datta Nar Hari Sept 25.pdf6 Jan 2026
Form 1File: Form 1 mar 24 SDN.pdf25 Dec 2025
Form 2File: Form 2 Mar 24 SDN.pdf25 Dec 2025
Form 3File: Form 3 SDN Mar 2024 .pdf25 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Mar 24.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1 Sept 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2 sept 25.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 Shree Datta Nar Hari Sept 25.pdf24 Dec 2025
Form 1File: Form 1 june 24.pdf11 Nov 2025
Form 2File: Form 2 june 24.pdf11 Nov 2025
Form 3File: Form 3 june 24.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold june 24.pdf11 Nov 2025
Form 1File: Form 1 sep 24.pdf11 Nov 2025
Form 2File: Form 2 sep 24.pdf11 Nov 2025
Form 3File: Form 3 sep 24.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold sep 24.pdf11 Nov 2025
Form 1File: Form 1 dec 24.pdf11 Nov 2025
Form 2File: Form 2 dec 24.pdf11 Nov 2025
Form 3File: Form 3 dec 24.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold dec 24.pdf11 Nov 2025
Form 1File: Form 1 mar 23.pdf10 Nov 2025
Form 2File: Form 2 mar 23.pdf10 Nov 2025
Form 3File: Form 3 mar 23.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold mar 23.pdf10 Nov 2025
Form 1File: Form 1 june 23.pdf10 Nov 2025
Form 3File: Form 3 june 23.pdf10 Nov 2025
Form 2File: Form 2 june 23.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold Unsold june 23.pdf10 Nov 2025
Form 1File: Form 1 Sep 23.pdf10 Nov 2025
Form 2File: Form 2 sep 23.pdf10 Nov 2025
Form 3File: Form 3 sep 23.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold Unsold sep 23.pdf10 Nov 2025
Form 1File: Form 1 dec 23.pdf10 Nov 2025
Form 2File: Form 2 dec 23.pdf10 Nov 2025
Form 3File: Form 3 dec 23.pdf10 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold Unsold dec 23.pdf10 Nov 2025
Withdrawal Update Form 1File: Form-1 - Shree Datta Narhari Apartment.pdf18 Aug 2025
Withdrawal Update Form 2File: Form-2 Shree datta narhari apartment.pdf18 Aug 2025
Withdrawal Update Form 3File: signed Final Form 3 - Upload.pdf18 Aug 2025
Withdrawal Update Form 1File: Q4 Form 1 Shree Datta Narhari.pdf27 Jun 2025
Withdrawal Update Form 2File: Form 2 Q 4.pdf27 Jun 2025
Withdrawal Update Form 3File: Signed Form 3 of Shree Datta Narhari Aprt.pdf27 Jun 2025
Form 1File: Q4 Form 1 Shree Datta Narhari.pdf26 Jun 2025
Form 2File: Form 2 Q 4.pdf26 Jun 2025
Form 3File: Signed Form 3 of Shree Datta Narhari Aprt.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold unsold Inventory Q4.pdf26 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration - Datta Narhari Apartment.pdf26 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-Q1.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-Q2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory - Q3.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-Q2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory - Q3.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 SHREE DATTA NARHARI- FORM 1 F Y 24-25.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 SHREE DATTA NARHARI - FORM 1 FY 24-25.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 SHREE DATA NARHARI - FORM 1 F Y 24-25.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1-Shree Datta Narhari.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2-Shree Datta Narhari.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3-Shree Datta Narhari.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 SHREE DATTA NARHARI - FORM 2 FY 24-25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 SHREE DATTA NARHARI - FORM 2 F Y 24-25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 SHREE DATTA NARHARI Form 2 FY 24-25.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q 4 Shree Datta Narhari.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q4 Shree Datta Narhari.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Datta Narhari Apartment Mar 2024 Signed.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q3.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archirect Certificate Form 1 Q3 SDN.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 SDN Q3.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Form 2 Q3 SDN.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SDN Q3.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Datta - CA signed_.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate March 23.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate March 23.pdf19 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory March 23.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 March 23.pdf19 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Shri Datta narhari Apartment.pdf19 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate June 23.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Sept 23.pdf13 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate June 23.pdf13 Dec 2023

How this compares with Thane

80%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Datta Narhari Apartment on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Badlapur7,600+ in Thane

2 kmShree Datta Narhari AparCompleted 213Lapsed / revoked 78Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 427 registered projects within 2 km.

Builder: OMKAR ENTERPRISES

OMKAR ENTERPRISES has 15 registrations on MahaRERA, including OMKAR ENCLAVE and EKNATH TOWER. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Shree Datta Narhari Apartment shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Shree Datta Narhari Apartment is delayed beyond 1 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Datta Narhari Apartment?

The registered promoter entity is OMKAR ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Datta Narhari Apartment?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Datta Narhari Apartment?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Datta Narhari Apartment?

The professionals named in the filing: Architect: Architect Rahul Shrikhande & Associates; Engineer: Atul Kudtarkar & Associates; Engineer: Atul Kudtarkar and Associates Pvt Ltd; Chartered Accountant: A S K A & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Datta Narhari Apartment?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Datta Narhari Apartment. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Datta Narhari Apartment to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.