SHREE DATTA MANGAL APARTMENT D AND E
RG-MH-14828 · RERA P51600032962 · Last updated on MahaRERA portal: 11 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE DATTA MANGAL APARTMENT D AND E is a Residential / Group Housing project by TARACHAND DEVISAHAY GUPTA in Nashik, Maharashtra, registered with MahaRERA as P51600032962 on 2 Feb 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 24 months from the original filing. 2 of the 48 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREE DATTA MANGAL APARTMENT D AND E
- TypeResidential / Group Housing
- Location
- AANANDWALI
- VILLAGE AANANDWALI
- Nashik
- 422005
- Pincode422005
- RERA no.P51600032962
- ReraGenie IDRG-MH-14828
Builder
- NameTARACHAND DEVISAHAY GUPTA
- Entity typeIndividual
- Other registrations2 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Feb 2022
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed101 files
Current status
Figures as on 11 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE DATTA MANGAL APARTMENT D | NA | 7 | 7 | 24 | 0 | 24 |
| SHREE DATTA MANGAL APPARTMENT E | NA | 7 | 7 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.
SHREE DATTA MANGAL APARTMENT D54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
SHREE DATTA MANGAL APPARTMENT E54%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SHREE DATTA MANGAL APARTMENT D | 12 | 12 |
| SHREE DATTA MANGAL APPARTMENT E | 11 | 11 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE DATTA MANGAL APARTMENT D | NA | Rs 2.50 cr | Rs 1.50 cr |
| SHREE DATTA MANGAL APPARTMENT E | NA | Rs 2.50 cr | Rs 1.50 cr |
| - | NA | Rs 26.32 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAIKWAD ASSOCIATES |
| Architect | SATISH GAIKWAD |
| Engineer | MILIND RATHI |
| Chartered Accountant | CA NANDKISHOR PATIL |
| Chartered Accountant | PIYUSH LALIT VERMA |
| Chartered Accountant | SANVY & ASSOCIATES |
| Partner | Role in project |
|---|---|
| TARACHAND DEVISAHAY GUPTA | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera. Workforce and Material Issues: • Labor Shortages: Availability of skilled manpower, especially in structural and MEP (Mechanical, Electrical & Plumbing) areas, was restricted due to migration and contractual disruptions, slowing down project execution. • Supply Chain Disruptions: Escalation in raw material costs and delays in delivery of essential materials further extended the project timeline. b. Financial Constraints: • Due to market slowdown, the project faced liquidity constraints, delaying scheduled construction activities. c. Design Changes and Legal Issues: • Minor design alteration
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 200333/2013/2013 | Joint civil Judge SD and Additional CJM | Evidence part heard |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 June 26.pdf | 11 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 June 26.pdf | 11 Aug 2026 |
| Withdrawal Update Form 3File: MARCH 2026.pdf | 11 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Sept 25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Mar 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Sept 25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Mar 26.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: JUNE 2025.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: SEPTEMBER 2025.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: DECEMBER 2025.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: MARCH 2026.pdf | 18 Jul 2026 |
| Form 1File: 1 Architects certificate 31032022.pdf | 3 Jul 2025 |
| Form 2File: 1 Form 2 31032022.pdf | 3 Jul 2025 |
| Form 3File: 1 Datta mangal form 3 31032022.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing March 2022.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing March 2023.pdf | 3 Jul 2025 |
| Form 1File: 2 Architects certificate 31032023.pdf | 3 Jul 2025 |
| Form 2File: 2 Form 2 31032023.pdf | 3 Jul 2025 |
| Form 3File: 2 Datta mangal Form 3 31032023.pdf | 3 Jul 2025 |
| Form 1File: 3 Architects certificate 30062023.pdf | 3 Jul 2025 |
| Form 2File: 3 Form 2 30062023.pdf | 3 Jul 2025 |
| Form 3File: 3 Datta mangal form 3 30062023.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 6 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing June 2023.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 7 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing Sept 2023.pdf | 3 Jul 2025 |
| Form 1File: 4 Architects certificate 30092023.pdf | 3 Jul 2025 |
| Form 2File: 4 Form 2 30092023.pdf | 3 Jul 2025 |
| Form 3File: 4 Datta mangal form 3 30092023.pdf | 3 Jul 2025 |
| Form 1File: 5 Architects certificate 31122023.pdf | 3 Jul 2025 |
| Form 2File: 5 Form 2 31122023.pdf | 3 Jul 2025 |
| Form 3File: 5 Datta Mangal Form 3 31122023.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 8 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing Dec 2023.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 9 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing Mar 2024.pdf | 3 Jul 2025 |
| Form 1File: 6 Form 1 March 24.pdf | 3 Jul 2025 |
| Form 2File: 6 Form 2 March 24.pdf | 3 Jul 2025 |
| Form 3File: 6 Form 3 March 24.pdf | 3 Jul 2025 |
| Form 1File: 7 Form 1 June 24.pdf | 3 Jul 2025 |
| Form 2File: 7 Form 2 June 24.pdf | 3 Jul 2025 |
| Form 3File: 7 Form 3 June 24.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 10 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing June 2024.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 11 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing Sept 2024s.pdf | 3 Jul 2025 |
| Form 1File: 8 Form 1 Sept 24.pdf | 3 Jul 2025 |
| Form 2File: 8 Form 2 Sept 24.pdf | 3 Jul 2025 |
| Form 3File: 8 Form 3 Sept 24.pdf | 3 Jul 2025 |
| Form 1File: 9 Form 1 Dec 24.pdf | 3 Jul 2025 |
| Form 2File: 9 Form 2 Dec 24.pdf | 3 Jul 2025 |
| Form 3File: 9 Form 3 Dec 24.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 12 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing Dec 2024.pdf | 3 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 13 Sold Booked Inventory Shree Datta Mangal Apartment D and E Wing March 2025.pdf | 3 Jul 2025 |
| Form 1File: 10 Form 1 Mar 25.pdf | 3 Jul 2025 |
| Form 2File: 10 Form 2 March 25.pdf | 3 Jul 2025 |
| Form 3File: 10 Form 3 March 2025.pdf | 3 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 24.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf | 25 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24.pdf | 25 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SMB RERA DATTA MANGAL 23-24.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SMB RERA DATTA MANGAL 23-24.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANUUAL REPORT DATTA MANGAL.pdf | 15 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 31032022.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 31032023.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 30062023.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 30092023.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 31122023.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032022.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032023.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30062023.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092023.pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31122023.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Datta mangal form 3 31032022.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Datta mangal Form 3 31032023.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Datta mangal form 3 30062023.pdf | 15 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Datta mangal form 3 30092023.pdf | 15 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE DATTA MANGAL APARTMENT D AND E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLAGE AANANDWALI4,100+ in Nashik
SHREEJI EXCELENCIA
SHREEJI DEVELOPERS
HARI VASANT
Hari Vasant Association of Allottees
NATHSEETA YEOLEKAR COMPLEX
DEEPAK INFRA AND HOMES PRIVATE LIMITED
Aaradhya Nakshatra
SHREYASH BUILDCON
Shri Ram Kunj
shree balaji developers
SAI COURT
JAY WIN DEVELOPERS
See every Nashik project, with the district possession charts
Builder: TARACHAND DEVISAHAY GUPTA
TARACHAND DEVISAHAY GUPTA has 3 registrations on MahaRERA, including PROFIT CENTER and SHREE DATTA MANGAL APARTMENT D AND E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE DATTA MANGAL APARTMENT D AND E is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE DATTA MANGAL APARTMENT D AND E?
The registered promoter entity is TARACHAND DEVISAHAY GUPTA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE DATTA MANGAL APARTMENT D AND E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE DATTA MANGAL APARTMENT D AND E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE DATTA MANGAL APARTMENT D AND E?
The professionals named in the filing: Architect: GAIKWAD ASSOCIATES; Architect: SATISH GAIKWAD; Engineer: MILIND RATHI; Chartered Accountant: CA NANDKISHOR PATIL; Chartered Accountant: PIYUSH LALIT VERMA; Chartered Accountant: SANVY & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE DATTA MANGAL APARTMENT D AND E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback