Home / Browse projects / Pune, Maharashtra / SHREE BALAJI HEIGHTS
SHREE BALAJI HEIGHTS
RG-MH-39973 · RERA P52100050055 · Last updated on MahaRERA portal: 5 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE BALAJI HEIGHTS is a Residential / Group Housing project by SHREE BALAJI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100050055 on 6 Mar 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 42 of the 42 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE BALAJI HEIGHTS
- TypeResidential / Group Housing
- Location
- MAUJE-CHIKHALI ROAD
- CHIKHALI
- Haveli
- Pune
- 411062
- Pincode411062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050055
- ReraGenie IDRG-MH-39973
Builder
- NameSHREE BALAJI DEVELOPERS
- Entity typePartnership
- PartnersCHETAN CHHABU LANDGE, DHARAMVEER ISHWARCHAND AGARWAL, SADASHIV TANAJIRAO DHUMALE, SATYAWAN DNYANESHWAR SAKORE
- Other registrations21 more →
- Completed6 of 22
- No longer live12 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Mar 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 24 Dec 2025)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 5 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILGING | NA | 9 | 9 | 42 | 0 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.
A BUILGING: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 99% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A BUILGING | NA | Rs 7.41 cr | Rs 7.41 cr |
| - | NA | Rs 44.50 lakh | Rs 44.50 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vipul Vilaskumar Pagariya |
| Engineer | MAHESH PARMESHWAR PAWAR |
| Chartered Accountant | VAISHALI R GOLE |
| Chartered Accountant | NEHA CHANGEDIA |
| Partner | Role in project |
|---|---|
| SHREE BALAJI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to the revised plan approval, heavy rainfall, and shortage of labour, we were unable to complete the project within the stipulated time. Therefore, we request an extension of 6 months.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Jun 2026
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form no 1 26-27 q1.pdf | 5 Aug 2026 |
| Withdrawal Update Form 2File: FORM NO 2 26-27 q1.pdf | 5 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 26-27 q1.pdf | 5 Aug 2026 |
| Form 5 (FY 2025-2026)File: form no 5.pdf | 5 Aug 2026 |
| Commencement certificateFile: Completion Certificate 1.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: form No 1 Shree Balaji fy 25-26 Q4.pdf | 12 Jun 2026 |
| Withdrawal Update Form 2File: form No 2 Shree Balaji fy 25-26 Q4.pdf | 12 Jun 2026 |
| Withdrawal Update Form 3File: Form No 3 Shree Balaji fy 25-26 Q4.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: FORM NO 1 SHREE BALAJI 25-26 Q3.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: FORM NO 2 Shree Balaji developers 25-26 Q3.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form no 3 Shree Balaji Q3 fy 25-26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: For No 1 25-26 q1.pdf | 23 Dec 2025 |
| Withdrawal Update Form 1File: Form No 1 25-26 Q2.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: Form No 2 25-26 Q1.pdf | 23 Dec 2025 |
| Withdrawal Update Form 2File: Form No 2 25-26 Q2.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: Form No 3 25-26 Q1.pdf | 23 Dec 2025 |
| Withdrawal Update Form 3File: Form No 3 25-26 Q2.pdf | 23 Dec 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form no B New Bank account update.pdf | 3 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form no A New Bank account update.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH 1.pdf | 2 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf | 2 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 2.pdf | 2 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE-Q1.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE Q2.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q1 (1).pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Q2.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE Q1.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE Q2.pdf | 12 Nov 2024 |
| Layout approvalFile: PLAN LAYOUT.pdf | 10 Nov 2024 |
| Building plan approvalFile: ELEVATION.pdf | 10 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT.pdf | 10 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_08112024.pdf | 10 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ELEVATION.pdf | 10 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE(Q1) JUN-2024 Signed.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE(Q3) DEC-2023 Signed.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE(Q4) MAR-2024 Signed.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SHREE BALAJI DEVELOPERS 23-24 Q3.pdf | 24 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG Q3.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG Q4.pdf | 24 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: shree balaji developers_page-0001.pdf | 30 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFIACTE.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 Q2_compressed.pdf | 1 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 6 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng CERTIFICATE_05072023.pdf | 6 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_05072023_compressed.pdf | 6 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf | 22 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION IN AGREEMENT FOR SALE_compressed.pdf | 22 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations_compressed.pdf | 20 Feb 2023 |
| Proforma of Agreement for saleFile: DRAFT SHREE BALAJI HEIGHTS_NEW(1).pdf | 20 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE FOR BD.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE.pdf | 16 Feb 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE.pdf | 16 Feb 2023 |
| Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE_compressed.pdf | 14 Feb 2023 |
| Copy of the legal title reportFile: SEARCH TITLE REPORT_1-28MB.pdf | 10 Feb 2023 |
| Declaration in FORM BFile: FORM B_608KB.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_23012023.pdf | 10 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_08022023.pdf | 10 Feb 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER_763KB.pdf | 10 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION_446KB.pdf | 10 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION IN ALLOTMENT LETTER.pdf | 10 Feb 2023 |
| Building plan approvalFile: NA.pdf | 25 Jan 2023 |
| Layout approvalFile: IMG_0001.pdf | 25 Jan 2023 |
| Layout approvalFile: IMG_0002.pdf | 25 Jan 2023 |
| PAN CardFile: FIRM PAN CARD.pdf | 25 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: IMG_0001.pdf | 25 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: IMG_0002.pdf | 25 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA.pdf | 25 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 25 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 21 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE BALAJI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHIKHALI13,700+ in Pune
Filed coordinates, straight-line distance. 176 registered projects within 2 km.
SHAKUNTAL COMMERCIA
SHAKUNTAL GROUP
Santiago Skyarc
Anjani Promoters
DWARKA BLUE WATER
SHAKUNTAL BUILDCON
24 SUNSHINE TOWERS
SHIV ASSOCIATES
Ganesh Paradise Phase I
EKDANTA NEST LLP
GANESH SIDDHI PHASE 3
S B PATIL SPACES AND INFRA PVT LTD
Builder: SHREE BALAJI DEVELOPERS
SHREE BALAJI DEVELOPERS has 22 registrations on MahaRERA, including SHREE RESIDENCY and PNT SQUARE. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SHREE BALAJI HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREE BALAJI HEIGHTS is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE BALAJI HEIGHTS?
The registered promoter entity is SHREE BALAJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE BALAJI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE BALAJI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE BALAJI HEIGHTS?
The professionals named in the filing: Architect: Vipul Vilaskumar Pagariya; Engineer: MAHESH PARMESHWAR PAWAR; Chartered Accountant: VAISHALI R GOLE; Chartered Accountant: NEHA CHANGEDIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE BALAJI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback