ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SHREE ANANDI IMPERIAL

Registered No litigation declared Others project

SHREE ANANDI IMPERIAL

By JAI MALHAR BUILDERS & DEVELOPERS

RG-MH-52932 · RERA P51700048585 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
23 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
22 of 158Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

SHREE ANANDI IMPERIAL is a Others project by JAI MALHAR BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700048585 on 10 Jan 2023. Possession is promised by 31 Dec 2026. 136 of the 158 units on this registration are recorded sold or booked, and 23 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHREE ANANDI IMPERIAL
  • TypeOthers
  • Location
    • Dombivli East
    • nandivli tarfe panchnand
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048585
  • ReraGenie IDRG-MH-52932

Builder

  • NameJAI MALHAR BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnerSONAWANE VASANT PRAVIN
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed100 files

Current status

86%136 of 158 units booked
88.0%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA8838038
B WingNA8861061
C WINGNA88491059

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

A WING87%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
B Wing90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING78%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed186

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots186
Closed/Covered73
Open Space113
BuildingClosed/CoveredOpen SpaceTotal
A WING243761
B Wing243761
C WING253964

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,550 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
Declared on13 May 2025
LandownerVillageDistrict
Deepak Pandurag MejariDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI9027.82
Proposed, not sanctioned9,028 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJARAM APARTMENT, PISAVALI, MALANG ROAD, KALYAN EAST 421306
Estimated costRs 24.15 cr
Cost incurredRs 21.27 cr
Work done88.05%
BuildingWingEstimatedIncurred
B WingNARs 12.00 crRs 11.64 cr
A WINGNARs 6.60 crRs 6.40 cr
C WINGNARs 5.38 crRs 3.23 cr
-NARs 17.75 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDILIP TAMBDAY
EngineerAARNA STRUCTURAL CONSULTANTS
Chartered AccountantMAYUR K JAIN AND CO
Chartered AccountantMOHIT PRAKASH JAIN AND ASSOCIATES
PartnerRole in project
JAI MALHAR BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: form 5 signed.pdf29 Jun 2026
Withdrawal Update Form 1File: Form-1 31-03-2026.pdf11 Jun 2026
Withdrawal Update Form 2File: Form-2 31-03-2026.pdf11 Jun 2026
Withdrawal Update Form 3File: form 3 signed.pdf11 Jun 2026
Withdrawal Update Form 1File: Form-1 31-12-2025.pdf22 Apr 2026
Withdrawal Update Form 2File: Form-2 31-12-2025.pdf22 Apr 2026
Withdrawal Update Form 3File: Form-3 31-12-2025 Final.pdf22 Apr 2026
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf16 Dec 2025
Withdrawal Update Form 1File: Form-1 30-09-2025.pdf16 Dec 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf16 Dec 2025
Withdrawal Update Form 2File: Form-2 30-09-2025.pdf16 Dec 2025
Withdrawal Update Form 3File: Form-3 30-06-2025.pdf16 Dec 2025
Withdrawal Update Form 3File: Form-3 30-09-2025.pdf16 Dec 2025
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf15 Dec 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf15 Dec 2025
Withdrawal Update Form 3File: Form-3 30-06-2025.pdf15 Dec 2025
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf11 Dec 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf11 Dec 2025
Withdrawal Update Form 3File: Form-3 30-06-2025.pdf11 Dec 2025
Form 5 (FY 2024-2025)File: Form-5 FY 24-25 Signed.pdf3 Oct 2025
Layout approvalFile: Plan.pdf2 Jul 2025
Building plan approvalFile: Plan.pdf2 Jul 2025
Withdrawal Update Form 1File: Form-1 31-03-2025.pdf30 Jun 2025
Withdrawal Update Form 2File: Form-2 31-03-2025.pdf30 Jun 2025
Withdrawal Update Form 3File: FINAL Withdrawal Application Form3.pdf30 Jun 2025
Form 1File: Form-1 31-03-2025.pdf15 May 2025
Form 2File: Form-1 31-12-2024.pdf15 May 2025
Form 3File: Form-2 31-12-2024.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: form 3 311224 (1)_compressed.pdf15 May 2025
Layout approvalFile: Plan.pdf13 May 2025
Building plan approvalFile: Plan.pdf13 May 2025
Form 1File: Form-1 31-03-2025.pdf13 May 2025
Layout approvalFile: Plan.pdf8 May 2025
Building plan approvalFile: Plan.pdf8 May 2025
Copy of Layout Approval (in case of layout)File: Plan.pdf8 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-03-2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-03-2025.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 311224 (1)_compressed.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: sold unsold sep 24.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: sold unsold dec24.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2024.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (2)_compressed.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-09-2024.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-09-2024.pdf6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24 SIGN.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 march 2024_compressed.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 june 2024_compressed.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 imperial 30-06-2024.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-06-2024.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2023 Sign.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31-03-2024.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-03-2024.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31-12-2023.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-12-2023.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 IMPERIAL.pdf19 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2023.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sep Form 2023.pdf9 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 imperial 51023.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 imperial 51023.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 09082023 imperial.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2205023.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 2405023.pdf17 Aug 2023
Disclosure of sold/ booked inventoryFile: Document 421.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed (1).pdf20 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed (1).pdf1 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Document 341.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Document 340 (1).pdf4 Jan 2023
Layout approvalFile: Revised Copy of Plan 1.pdf23 Dec 2022
Copy of Layout Approval (in case of layout)File: Revised Copy of Plan 1.pdf23 Dec 2022
Layout approvalFile: Revised Copy of Plan.pdf13 Dec 2022
Layout approvalFile: Blure print - 2.pdf13 Dec 2022
Building plan approvalFile: Blue print - 1.pdf13 Dec 2022
Building plan approvalFile: Blure print - 2.pdf13 Dec 2022
PAN CardFile: 1 PAN Card.pdf13 Dec 2022

How this compares with Thane

86%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE ANANDI IMPERIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli East7,600+ in Thane

Builder: JAI MALHAR BUILDERS & DEVELOPERS

JAI MALHAR BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including SHREE ANANDI HERITAGE and SHREE ANANDI IMPERIAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE ANANDI IMPERIAL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE ANANDI IMPERIAL?

The registered promoter entity is JAI MALHAR BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE ANANDI IMPERIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE ANANDI IMPERIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE ANANDI IMPERIAL?

The professionals named in the filing: Architect: DILIP TAMBDAY; Engineer: AARNA STRUCTURAL CONSULTANTS; Chartered Accountant: MAYUR K JAIN AND CO; Chartered Accountant: MOHIT PRAKASH JAIN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE ANANDI IMPERIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE ANANDI IMPERIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE ANANDI IMPERIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.