ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SHIVATMAN

Completed No litigation declared Residential / Group Housing project

SHIVATMAN

By NAIKNAVARE DEVELOPERS PVT LTD

RG-MH-81005 · RERA P52100047570 · Last updated on MahaRERA portal: 17 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 90%
10 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

SHIVATMAN is a Residential / Group Housing project by NAIKNAVARE DEVELOPERS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100047570 on 9 Nov 2022. The registration is recorded completed; possession was promised by 30 Dec 2025. The completion date has moved by 12 months from the original filing. 7 of the 17 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIVATMAN
  • TypeResidential / Group Housing
  • Location
    • GHOLE ROAD
    • SHIVAJI NAGAR
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411004
  • Pincode411004
  • RERA no.P52100047570
  • ReraGenie IDRG-MH-81005

Builder

  • NameNAIKNAVARE DEVELOPERS PVT LTD
  • Entity typeCompany
  • CINU45200PN2007PTC131033
  • GSTIN27AACCN6706F1ZK
  • DirectorsRANJIT DATTAJI NAIKNAVARE, HEMANT DATTAJI NAIKNAVARE
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects5 →

Key dates

this monthRegisteredNov 2022First promiseDec 2024Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Nov 2022
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed98 files

Current status

41%7 of 17 units booked
89.2%Work done, per cost certificate

Figures as on 17 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVATMANNA6617017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

SHIVATMAN: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area514 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
NAIKNAVARE DEVELOPERS PVT LTDPune (M Corp.)Pune
Deepak Ravindra MorePune (M Corp.)Pune
Saudamini Deepak MorePune (M Corp.)Pune
Umesh Ravindra MorePune (M Corp.)Pune
Aishwarya Deepak MorePune (M Corp.)Pune
Ujwala Deepak MorePune (M Corp.)Pune
Varsha Umesh MorePune (M Corp.)Pune
Harshnil Umesh MorePune (M Corp.)Pune
Hemant Dattaji NaiknavarePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI1644.8
Proposed, not sanctioned1,645 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1264/1, WRANGLER PARANJAPE ROAD, JM ROAD, DECCAN GYMKHANA, PUNE 411004
Estimated costRs 7.67 cr
Cost incurredRs 6.84 cr
Work done89.17%
BuildingWingEstimatedIncurred
SHIVATMANNARs 6.61 crRs 5.95 cr
-NARs 1.06 crRs 89.04 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURI NAIKNAVARE
EngineerSUNIL MULIK
Chartered AccountantSHRISHRIMAL AND ASSOCIATES
Chartered AccountantKKSS AND ASSOCIATES
PartnerRole in project
NAIKNAVARE DEVELOPERS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024956Dec 2024 → Dec 2025

Reason as filed by the promoterSubject: Application for Extension of Project "Shivatman" Dear Sir/Madam, We, Naiknavare Developers Pvt. Ltd., the promoters of the project "Shivatman," registered with MahaRERA under registration number P52100047570, hereby submit our application for an extension of the project completion timeline. Over the past year, the Shivajinagar area, where the project is located, experienced unusually heavy rainfall, which significantly affected construction activities. The prolonged monsoon disrupted our construction schedule and caused delays in key project milestones. Additionally, the ongoing const

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SHIVATMAN PROJECT FORM 1.pdf17 Jan 2026
Withdrawal Update Form 2File: SHIVATMAN FORM 2.pdf17 Jan 2026
Withdrawal Update Form 3File: SHIVATMAN FORM 3.pdf17 Jan 2026
Form 5 (FY 2024-2025)File: certificate_shivatman (2).pdf10 Dec 2025
Form 1File: SHIVATMAN FORM 1.pdf15 Oct 2025
Form 2File: SHIVATMAN FORM 2.pdf15 Oct 2025
Form 3File: shivatman FORM 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: SHIVATMAN SOLD UNSOLD.pdf15 Oct 2025
Form 1File: SHIVATMAN FORM 1.pdf19 Jul 2025
Form 2File: SHIVATMAN FORM 2.pdf19 Jul 2025
Form 3File: Shivatman FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: shivatman sold unsold.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: SHIVATMAN SELF DECLARATION.pdf19 Jul 2025
Disclosure of sold/ booked inventoryFile: Shivatman - Disclosure Sold Booked Inventory.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivatman.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivatman.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Shivatman.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shivatman.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIVATMAN MERGED FILE_compressed (1).pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SHIVATMAN.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN-.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHIVATMAN.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: SHIVATMAN.pdf8 Jan 2025
Declaration in FORM BFile: FORM B SHIVATMAN.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate shivatman.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shivatman1-8_merged_compressed.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHIVATMAN.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivatman Form 3 _Sept 24.pdf24 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Shivatman.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shivatman.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: SHIVATMAN.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivatman Merged_compressed.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shivatman-form -3-.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1st Quarter 2024-25 Shivtman.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: SHIVATMAN.pdf10 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: SHIVATMAN.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Shivatman.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shivatman.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 3 shivatman.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shivatman.pdf9 Apr 2024
Disclosure of sold/ booked inventoryFile: SHIVATMAN.pdf6 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shivatman.pdf4 Apr 2024
Other - TechnicalFile: Shivatman.pdf4 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shivatman Form 5.pdf5 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shivatman Form 5.pdf5 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Shivatman Commencement Certificate.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIVATMAN-FINAL_compressed.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 nd Quatar.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 rd Quarter.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shivatman.pdf6 Jan 2024
Foreclosure of the ProjectFile: Shivatman.pdf6 Jan 2024
Other - TechnicalFile: Shivatman.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: shivatman.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shivatman Form-3-Final-June-23_compressed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shivatman Form 2A.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: SHIVATMAN SOLD UNSOLD JUL SEP 23.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN.pdf3 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN FORM 1 ARCH CERT APR JUNE 23.pdf4 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN-RERA CERT JAN TO MAR 2023.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHIVATMAN RERA FORM 1 UPDATE DEC 22.pdf15 Feb 2023
Building plan approvalFile: SHIVATMAN SANCTION 10112022.pdf11 Nov 2022
Building plan approvalFile: SHIVATMAN SANCTION 10112022.pdf11 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: SHIVATMAN SANCTION 10112022.pdf11 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: SHIVATMAN SANCTION 10112022.pdf11 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: SHIVATMAN SANCTION CC 10112022.pdf11 Nov 2022
Other - LegalFile: Deviation AFS SHIVATMAN.pdf3 Nov 2022
Proforma of Allotment letterFile: Allotment Letter.pdf2 Nov 2022
Proforma of Agreement for saleFile: Shvatman ATS Final.pdf2 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation in Allotment Letter.pdf2 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation in Agreement for Sale.pdf2 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SHIVATMAN NO ENCUMBRANCE ACCOUNT.pdf19 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SHIVATMAN RERA FORMAT A BANK DECLARATION.pdf16 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIVATMAN FORM 3 RERA WITH PROMO SIGN.PDF8 Sep 2022
Other - FinanceFile: SHIVATMAN RERA BANK DETAILS WITH PROMO SIGN.pdf8 Sep 2022
PAN CardFile: RDN PAN.pdf18 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHIVATMAN FORM 3 17082022.PDF17 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
EMINENCE PROJECT 1P52100001061VIMAN NAGAR, PuneJul 2017CompletedDec 2022Registered original: Dec 2019Dec 2022

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIVATMAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI NAGAR13,700+ in Pune

Builder: NAIKNAVARE DEVELOPERS PVT LTD

NAIKNAVARE DEVELOPERS PVT LTD has 3 registrations on MahaRERA, including EMINENCE PROJECT 1 and SHIVATMAN. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHIVATMAN is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVATMAN?

The registered promoter entity is NAIKNAVARE DEVELOPERS PVT LTD, a company as per the filing. Its CIN U45200PN2007PTC131033 and GSTIN 27AACCN6706F1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVATMAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVATMAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVATMAN?

The professionals named in the filing: Architect: GAURI NAIKNAVARE; Engineer: SUNIL MULIK; Chartered Accountant: SHRISHRIMAL AND ASSOCIATES; Chartered Accountant: KKSS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVATMAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVATMAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVATMAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.