Home / Browse projects / Pune, Maharashtra / EMINENCE PROJECT 1
EMINENCE PROJECT 1
By NAIKNAVARE DEVELOPERS PVT LTD
RG-MH-10495 · RERA P52100001061 · Last updated on MahaRERA portal: 6 Nov 2024
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
EMINENCE PROJECT 1 is a Residential / Group Housing project by NAIKNAVARE DEVELOPERS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100001061 on 25 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. The completion date has moved by 36 months from the original filing. 4 complaints are on record with the regulator.
At a glance
Project
- NameEMINENCE PROJECT 1
- TypeResidential / Group Housing
- Location
- VIMAN NAGAR
- LOHGAON
- Haveli
- Pune
- 411047
- Pincode411047
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100001061
- ReraGenie IDRG-MH-10495
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Jul 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 31 Dec 2019)
- Buildings2 building records
- Documents filed106 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLDG A | NA | 9 | 0 | 0 | 0 | 0 |
| CLUB HOUSE | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
BLDG A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
CLUB HOUSE91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 95% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 95% |
Parking filed84
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI NAIKNAVARE |
| Engineer | KRUPALI KADAM |
| Partner | Role in project |
|---|---|
| NAIKNAVARE DEVELOPERS PVT LTD | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOur project “Eminence” is registered with regulatory authority vide project registration certificate bearing No P52100001061. During the implementation of the project, the Pune Municipal Corporation required the NOC from for construction of building for a height of 36 M AGL or 606 M AMSL from the concern authority. Accordingly, the Promoter has applied to Survey of India on 16.04.2018 for its report on Aerial distance and AMSL heights of site for the purpose of Airport NOC. Upon receipt of report of Survey of India on 08.10.2018, the Promoter has applied to SATCO Airforce Station Lohagaon on 2
Reason as filed by the promoterWe have registered our Project EMINENCE No. P521000001061 under RERA. The completion date for the project is 30 TH JUNE 2021. But considering the COVID-19 situation, we are unable to complete our Project due to various reasons mentioned as under. As you are aware, due to lockdown announced by the Government of Maharashtra, the labours moved from site to their native places. Mostly the labours are from other States like UP, Bihar Orissa, Assam, Rajasthan etc. The labour strength on site reduced drastically. Here we have attached the previous labour strength and the labours available as of now f
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 583/2013 | CIVIL JUDGE JUNIOR DIVISION PUNE | PENDING |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000023015 | Virendra Paul Naronha | Naiknavare Developers Pvt. Ltd | 11/05/2019 |
| CC005000000033556 | Mrs Saramma George | Naik Navare Developer Pvt Ltd | 16/01/2020 |
| CC005000000177935 | Naiknavare Developers Pvt Ltd Thr its Authorized Signatory Anand Hemant Naiknavare | Mr. Madhav Samarth Gawai | 19/12/2022 |
| CC005000000279730 | Naiknavare Group | Ms. Kaushalyadevi Omprakash Agrawal | 27/11/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Jan 2023
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 5)File: Certificate EM1.pdf | 6 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Eminence Project-1-Form-5.pdf | 20 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence.pdf | 4 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Eminence-A.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 EMINENCE A BLDG.pdf | 7 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence Pro 1 - Form 2 Jan To March 2023.pdf | 12 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Eminence A_compressed.pdf | 10 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: 4 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for | 7 Apr 2023 |
| Certificates of CA (Form 3)File: Eminence 1 rera form 3 Oct Dec 22 (2).pdf | 8 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: EMINENCE PRO 1 SOLD UNSOLD DEC 22.pdf | 9 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence.pdf | 19 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EMINENCE RERA PART COMPLITION BALANC FLATS.pdf | 13 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EMINENCE A Form 4 RERA.pdf | 13 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Eminence Sept 22.pdf | 27 Dec 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE EMC BLDG A.pdf | 7 Dec 2022 |
| Certificates of CA (Form 5)File: Eminance Pro1 Form 5.pdf | 6 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EMINENCE PRO 1 PART COMPLETION OC.pdf | 7 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE PRO 1 FORM 2 JUN SEPT 22.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Eminence A building Sold Unsold.pdf | 10 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE A RERA PRO 1 JULY SEPTEMBER 061022.pdf | 7 Oct 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Emience PRO 1 PART COMPLETION Bldg A.pdf | 7 Oct 2022 |
| OtherFile: RERA EMINENCE BUILDING A _ FINAL AREA STATEMENT (1).pdf | 29 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE PRO 2 FORM 2 JUN 22.pdf | 6 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE A FORM 2 JUN 22.pdf | 6 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE A RERA ARCH CERTI APR TO JUN.pdf | 1 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Eminence P1 Arch Certi.pdf | 4 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE P1 ENGR CERT.pdf | 19 Apr 2022 |
| Certificates of CA (Form 5)File: 6 Certificates of CA (Form 5).pdf | 9 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH EMINENCE.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGR EMINENCE.pdf | 7 Jan 2022 |
| OtherFile: QUALITY CERTIFICATE A BLDG.pdf | 8 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT A BLDG 30 9 21.pdf | 4 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERT A BLDG 30 9 21.pdf | 4 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 eminence PROJECT 1 A BUILDING 30 6 21.pdf | 16 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE A ARCH CERT 27 07 2021.pdf | 31 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE A ENGR CERT 27 07 2021.pdf | 31 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Eminence Project 1 2018 TO 2019.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Eminence Project 1 2019 TO 2020.pdf | 5 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NDPL Rera Certificate.pdf | 5 Jul 2021 |
| Declaration about Commencement CertificateFile: cc declration emience a bldg.pdf | 3 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: inventory book 2362021.pdf | 23 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: quality letter eminence 1.pdf | 22 Jun 2021 |
| Certificates of CA (Form 5)File: Eminence Project 1.pdf | 22 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A ARCH CERT 27 04 21.pdf | 27 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A ENGR CERT 27 04 21.pdf | 27 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE ARCH CERT 19 01 21.pdf | 20 Jan 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE ENGR CERT 19 01 21.pdf | 20 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH A BLDG 28 09 2020.pdf | 7 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR A BLDG 28 09 2020.pdf | 7 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH CERT 20 06 2020.pdf | 22 Jun 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERT 20 6 20.pdf | 22 Jun 2020 |
| Certificates of CA (Form 5)File: Form 5 Eminence P1.pdf | 22 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH A BLDG 20 01 2020.pdf | 20 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR A BLDG 20 01 2020.pdf | 20 Jan 2020 |
| Certificates of CA (Form 5)File: NDPL - Project Eminence.pdf | 2 Jan 2020 |
| Certificates of CA (Form 5)File: Form 5 Eminence P1.pdf | 14 Nov 2019 |
| OtherFile: CREDAINDPL MEM CERT 2020.pdf | 4 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH A BLDG 21 10 19.pdf | 21 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR A BLDG 21 10 19.pdf | 21 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH CERT 22 7 2019.pdf | 22 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGR CERT 22 7 2019.pdf | 22 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate A 24 4 2019.pdf | 26 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERTIFICATE 24042019.pdf | 25 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE 24 01 2019.pdf | 24 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERTIFICATE 24 01 2019.pdf | 24 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch cert 25 10 18.pdf | 25 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engr cert 25 10 18.pdf | 25 Oct 2018 |
| Certificates of CA (Form 5)File: NDPL - Project Eminence.pdf | 29 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT 25072018.pdf | 25 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGRCERT25072018.pdf | 25 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT.pdf | 25 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGR CERT.pdf | 25 Apr 2018 |
| Details of encumbrancesFile: Altico Mortgage deed Index II.pdf | 20 Mar 2018 |
| Proforma of Allotment letterFile: ALLOTTMENT LETTER.pdf | 20 Mar 2018 |
| Proforma of Allotment letterFile: Agreement to sell2032018.pdf | 20 Mar 2018 |
| Status of ConveyanceFile: Deed of Conveyance.pdf | 20 Mar 2018 |
| OtherFile: EMINENCE_ALL FLOOR PLANS WITH LAYOUT (ANNEXURE C2).pdf | 20 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 arch cert 25-1-18.pdf | 25 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engr cert 25-1-18.pdf | 25 Jan 2018 |
| OtherFile: Eminence CA certificate251017.PDF | 25 Oct 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MYSTQUE MOOD B BLDG | S NO 230A -3- 1 AND 231 -1 -1 LOHGAON PUNE | 32 | Completed | Mar 2015 | Late, Apr 2015 |
| SYLVAN HEIGHTS E BLDG | AUNDH PUNE | 37 | Completed | Sep 2013 | Sep 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
Keep EMINENCE PROJECT 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIMAN NAGAR13,700+ in Pune
Filed coordinates, straight-line distance. 32 registered projects within 2 km.
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Builder: NAIKNAVARE DEVELOPERS PVT LTD
NAIKNAVARE DEVELOPERS PVT LTD has 3 registrations on MahaRERA, including EMINENCE PROJECT 1 and SHIVATMAN. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if EMINENCE PROJECT 1 is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of EMINENCE PROJECT 1?
The registered promoter entity is NAIKNAVARE DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in EMINENCE PROJECT 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against EMINENCE PROJECT 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for EMINENCE PROJECT 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at EMINENCE PROJECT 1?
The professionals named in the filing: Architect: GAURI NAIKNAVARE; Engineer: KRUPALI KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in EMINENCE PROJECT 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback