ReraGenieLog inGet a buyer report

Home / Browse projects / SHIVANSH RESIDENCY

Registered No litigation declared Residential / Group Housing project

SHIVANSH RESIDENCY

By NEW LAXMI BUILDCON

RG-MH-71451 · RERA P51600076723 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2026Possession promisedmoved 9 months from the original
8 of 11Construction stages donefurthest along: Internal walls, 96%
26 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

SHIVANSH RESIDENCY is a Residential / Group Housing project by NEW LAXMI BUILDCON in Survey No 923/1/2/7/8 (1160), 422103, registered with MahaRERA as P51600076723 on 21 Jun 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 3 of the 29 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHIVANSH RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Plot No 17
    • Survey No 923/1/2/7/8 (1160)
    • 422103
  • Pincode422103
  • RERA no.P51600076723
  • ReraGenie IDRG-MH-71451

Builder

  • NameNEW LAXMI BUILDCON
  • Entity typePartnership
  • PartnersBALASAHEB SHANKAR SANAP, MAHESHKUMAR PRABHAKAR SHELKE, SUDHIR JAGANNATH SANAP

Key dates

this monthRegisteredJun 2024First promiseMar 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jun 2024
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed73 files

Current status

10%3 of 29 units booked
24.8%Work done, per cost certificate

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIVANSH RESIDENCYNA5525429

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 96%.

SHIVANSH RESIDENCY: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area608 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2026

Approvals and building plan

Sanctioning authoritySINNAR MUNICIPAL COUNCIL
Permissible FSI1738.29
Proposed, not sanctioned1,738 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMurli Mamta Jakdi Galli, Tanaji Chowk Sinnar Dist Nasik Maharashtra 422103
Estimated costRs 5.00 cr
Cost incurredRs 1.24 cr
Work done24.78%
BuildingWingEstimatedIncurred
SHIVANSH RESIDENCYNARs 5.00 crRs 1.24 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN WAGH
EngineerBALASAHEB SANAP
Chartered AccountantV S V H & CO
Chartered AccountantDNYANESHWAR HASE
PartnerRole in project
NEW LAXMI BUILDCON-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30032620460Mar 2026 → Dec 2026

Reason as filed by the promoterThe project has experienced construction delays arising from circumstances beyond the control of the promoter, which have materially impacted the originally committed timelines. The delay is attributable to factors such as: - 1. Shortage of skilled labour and technical workers; 2. Delayed delivery of construction materials due to supply-chain disruptions; 3. Slowdown in work progress caused by contractor-related issues;

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A.pdf7 Aug 2026
Withdrawal Update Form 1File: FORM 1 JUNE 2026.pdf15 Jul 2026
Withdrawal Update Form 2File: FORM 2 JUNE 2026.pdf15 Jul 2026
Withdrawal Update Form 3File: FORM 3 JUNE 2026.pdf15 Jul 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf6 May 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf6 May 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf6 May 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf24 Apr 2026
Form 1File: FORM 1 DEC 2025.pdf28 Mar 2026
Form 2File: FORM 2 DEC 2025.pdf28 Mar 2026
Form 3File: FORM 3 DEC 2025.pdf28 Mar 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND BOOKED INVENTORY.pdf28 Mar 2026
Form 1File: FORM 1 SEPT 2025.pdf11 Nov 2025
Form 2File: FORM 2 SEPT 2025.pdf11 Nov 2025
Form 3File: FORM 3 SEPT 2025.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf11 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 MARCH 2025.pdf11 Nov 2025
Form 1File: FORM 1 MARCH 25.pdf18 Jul 2025
Form 2File: FORM 2 MARCH 2025.pdf18 Jul 2025
Form 3File: FORM 3 MARCH.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf18 Jul 2025
Form 1File: FORM 1 JUNE 2025.pdf18 Jul 2025
Form 2File: FORM 2 JUNE 2025.pdf18 Jul 2025
Form 3File: FORM 3 JUNE 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf18 Jul 2025
Form 1File: FORM 1 DEC 2024.pdf17 Jul 2025
Form 2File: FORM 2 DEC 2024.pdf17 Jul 2025
Form 3File: FORM 3 DEC 2024.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD & BOOKED INVENTORY.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2024.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2024.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024.pdf8 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MARCH 2024.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MARCH 2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 2024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 2024.pdf23 Oct 2024
Copy of the legal title reportFile: Title Report.pdf11 Jun 2024
Declaration about Commencement CertificateFile: Form D.pdf11 Jun 2024
Declaration about Commencement CertificateFile: Form D.pdf11 Jun 2024
CERSAI detailsFile: CERSAI.pdf11 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizatio_page-0002.pdf11 Jun 2024
Proforma of Agreement for saleFile: AGREEMENT TO SALE.pdf11 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank.pdf11 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS.pdf11 Jun 2024
Other - LegalFile: One Plot One Re.pdf11 Jun 2024
Other - LegalFile: 2899-2022 New Laxmi Buildcon purchase deed-1-12.pdf11 Jun 2024
Other - LegalFile: 2899-2022 New Laxmi Buildcon purchase deed-13-24.pdf11 Jun 2024
Other - LegalFile: 2899-2022 New Laxmi Buildcon purchase deed-25-35.pdf11 Jun 2024
Other - TechnicalFile: One Plot One Re.pdf11 Jun 2024
Layout approvalFile: PLOT LAYOUT.pdf12 Mar 2024
Building plan approvalFile: BUILDING PLAN.pdf12 Mar 2024
PAN CardFile: PAN.pdf12 Mar 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES FINANCE.pdf12 Mar 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES LEGAL.pdf12 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES FINANCE.pdf12 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LEGAL.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: PLOT LAYOUT.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf12 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf12 Mar 2024
Declaration in FORM BFile: FORM B.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf12 Mar 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf12 Mar 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf12 Mar 2024

Keep SHIVANSH RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Survey No 923/1/2/7/8 (1160)

Builder: NEW LAXMI BUILDCON

NEW LAXMI BUILDCON has 1 registration on MahaRERA, including SHIVANSH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if SHIVANSH RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIVANSH RESIDENCY?

The registered promoter entity is NEW LAXMI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIVANSH RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIVANSH RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIVANSH RESIDENCY?

The professionals named in the filing: Architect: SACHIN WAGH; Engineer: BALASAHEB SANAP; Chartered Accountant: V S V H & CO; Chartered Accountant: DNYANESHWAR HASE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIVANSH RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIVANSH RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIVANSH RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.