Home / Browse projects / Nashik, Maharashtra / Ramtek Ayodhya

Registered No litigation declared Others project

Ramtek Ayodhya

By Shinde Construction

RG-MH-31615 · RERA P51600079950 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Plinth, 20%
65 of 65Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

Ramtek Ayodhya is a Others project by Shinde Construction in Nashik, Maharashtra, registered with MahaRERA as P51600079950 on 7 Apr 2025. Possession is promised by 31 Dec 2032. 0 of the 65 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameRamtek Ayodhya
  • TypeOthers
  • Location
    • Saradwadi
    • Shivaji Nagar
    • Sinnar(M Cl)
    • Sinnar
    • Nashik
    • 422103
  • Pincode422103
  • RERA no.P51600079950
  • ReraGenie IDRG-MH-31615

Builder

  • NameShinde Construction
  • Entity typePartnership
  • PartnersSuhas Raosaheb Shinde, Santosh Raosaheb Shinde

Key dates

this monthRegisteredApr 2025PromisedDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Apr 2025
  • Promised completion31 Dec 2032
  • Revised completionNone
  • Buildings2 building records
  • Documents filed43 files

Current status

0%0 of 65 units booked
5.4%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA6624428
Wing BNA7728937

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Plinth, at 20%.

Wing A15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth20%
Stilt Floor10%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B15%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth20%
Stilt Floor10%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered10
Open Space80
BuildingClosed/CoveredOpen SpaceTotal
Wing A45963
Wing B62127

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,064 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2025

Approvals and building plan

Sanctioning authoritySinnar Municipal Council
Permissible FSI9650.41
Proposed, not sanctioned4,650 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-I &2 'PRATHAMESH APARTMENT, THATTENAGAR, GANGAPUR ROAD, NASIK
Estimated costRs 8.00 cr
Cost incurredRs 42.87 lakh
Work done5.36%
BuildingWingEstimatedIncurred
Wing ANARs 4.00 crRs 21.44 lakh
Wing BNARs 4.00 crRs 21.44 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAriyant Associate and Consulting Services
EngineerAriyant Associate and Consulting Services
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
Shinde Construction-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2032

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26.pdf7 May 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf7 May 2026
Withdrawal Update Form 3File: Form 3_Mar 26.pdf7 May 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf18 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf18 Feb 2026
Withdrawal Update Form 3File: CA Certificate Dec 25.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 Sep 25.pdf26 Dec 2025
Withdrawal Update Form 2File: Form 2 Sep 25.pdf26 Dec 2025
Withdrawal Update Form 3File: Form 3_Sep 25.pdf26 Dec 2025
Withdrawal Update Form 1File: Form 1 June 25.pdf4 Sep 2025
Withdrawal Update Form 2File: Form 2 June 25.pdf4 Sep 2025
Withdrawal Update Form 3File: Form 03.pdf4 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 01_CA 02_merged.pdf2 Apr 2025
Other - LegalFile: Sale Deed 02.pdf2 Apr 2025
Other - LegalFile: Declaration.pdf2 Apr 2025
Other - LegalFile: Sale Deed 03.pdf2 Apr 2025
Other - LegalFile: Sale Deed 01.pdf2 Apr 2025
Other - LegalFile: Partnership Deed_compressed.pdf2 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Ramtek Ayodhya.pdf2 Apr 2025
Copy of the legal title reportFile: Legal title report - Ramtek Ayodhya.pdf5 Mar 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance - Ramtek Ayodhya.pdf5 Mar 2025
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal - Ramtek Ayodhya.pdf5 Mar 2025
Proforma of Allotment letterFile: Allotment Letter - Ramtek Ayodhya.pdf5 Mar 2025
Declaration in FORM BFile: Developers Form B - Ramtek Ayodhya.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02.pdf5 Mar 2025
Declaration about Commencement CertificateFile: Form D - Ramtek Ayodhya.pdf5 Mar 2025
CERSAI detailsFile: Declaration-Nil-CERSAI Report - Ramtek Ayodhya.pdf5 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Ramtek Ayodhya.pdf5 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter - Ramtek Ayodhya.pdf5 Mar 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance - Ramtek Ayodhya.pdf5 Mar 2025
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal - Ramtek Ayodhya.pdf5 Mar 2025
Other - TechnicalFile: Declaration of One Plot One Registration - Ramtek Ayodhya.pdf5 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS - Ramtek Ayodhya.pdf5 Mar 2025
Proforma of Agreement for saleFile: Draft Agreement For Sale_Final.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations- Ramtek Ayodhya.pdf5 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for securedunsecured - Ramtek Ayodhya.pdf5 Mar 2025
Layout approvalFile: Building Plan.pdf8 Feb 2025
Building plan approvalFile: Building Plan.pdf8 Feb 2025
PAN CardFile: Firm PAN Card.pdf8 Feb 2025
Copy of Layout Approval (in case of layout)File: Building Plan.pdf8 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: RENEWAL CC.pdf8 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf8 Feb 2025

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ramtek Ayodhya on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Nagar4,100+ in Nashik

Builder: Shinde Construction

Shinde Construction has 1 registration on MahaRERA, including Ramtek Ayodhya. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Ramtek Ayodhya is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ramtek Ayodhya?

The registered promoter entity is Shinde Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ramtek Ayodhya?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ramtek Ayodhya?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ramtek Ayodhya?

The professionals named in the filing: Architect: Ariyant Associate and Consulting Services; Engineer: Ariyant Associate and Consulting Services; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ramtek Ayodhya?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ramtek Ayodhya. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ramtek Ayodhya to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.