SHREE GANESH EMPIRE
RG-MH-42083 · RERA P51600056157 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GANESH EMPIRE is a Residential / Group Housing project by SHREE GANESH CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600056157 on 16 May 2024. Possession is promised by 31 Dec 2032. 0 of the 56 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE GANESH EMPIRE
- TypeResidential / Group Housing
- Location
- Devi Road
- Near Hutama Smark
- Sinnar(M Cl)
- Sinnar
- Nashik
- 422103
- Pincode422103
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600056157
- ReraGenie IDRG-MH-42083
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2024
- Promised completion31 Dec 2032
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE GANESH EMPIRE | NA | 7 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 5%.
SHREE GANESH EMPIRE: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed42
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership9
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Bharati Ashok Shinde | Nashik (M Corp.) | Nashik |
| Suchita Bhimrao Arote | Thane (M Corp.) | Thane |
| Sunil Bhaguji Arote | Chas | Nashik |
| Vaishali Sachin Malode | Thane (M Corp.) | Thane |
| Rupali Shashikant Bhor | Thane (M Corp.) | Thane |
| Swati Sandip Pote | Sinnar(M Cl) | Nashik |
| Priya Kisan Arote | Thane (M Corp.) | Thane |
| Balkrushna Rajaram Sarode | Pune (M Corp.) | Pune |
| Swara Kiran Arote | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE GANESH EMPIRE | NA | Rs 8.27 cr | Rs 38.00 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GaneshBhanudas Handore |
| Engineer | Ganesh Bhanudas Handore |
| Chartered Accountant | Amol Mahajan & Associates |
| Partner | Role in project |
|---|---|
| SHREE GANESH CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2032
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Empire Form 1 Dec 25.pdf | 30 May 2026 |
| Withdrawal Update Form 1File: Empire Form 1 Mar 26.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: Empire Form 2 Dec 25.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: Empire Form 2 Mar 26.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: Form 3 Dec Empire.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: Form 3_Mar 26.pdf | 30 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate - Jun 25.pdf | 14 Nov 2025 |
| Withdrawal Update Form 1File: Architect Certificate - Sep 25.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate - June 25 (1).pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate - Sep 25 1.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate - June 25 (1).pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate - Sep 25 (1).pdf | 14 Nov 2025 |
| Form 1File: Form 01 - Jun 2024.pdf | 28 Jun 2025 |
| Form 2File: Form 02 - Jun 2024.pdf | 28 Jun 2025 |
| Form 3File: Form 03 - Jun 2024.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Jun 24.pdf | 28 Jun 2025 |
| Form 1File: Form 01 - Sep 2024.pdf | 28 Jun 2025 |
| Form 2File: Form 02 - Sep 2024.pdf | 28 Jun 2025 |
| Form 3File: Form 03 - Sep 2024.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Sep 24.pdf | 28 Jun 2025 |
| Form 1File: Form 01 - Dec 2024.pdf | 28 Jun 2025 |
| Form 2File: Form 02 - Dec 2024.pdf | 28 Jun 2025 |
| Form 3File: Form 03 - Dec 2024.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Dec 24.pdf | 28 Jun 2025 |
| Form 1File: Form 01 - Mar 2025.pdf | 28 Jun 2025 |
| Form 2File: Form 02 - Mar 2025.pdf | 28 Jun 2025 |
| Form 3File: Form 03 - Mar 2025.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Mar 25.pdf | 28 Jun 2025 |
| Withdrawal Update Form 1File: Form 01 - Mar 2025.pdf | 28 Jun 2025 |
| Withdrawal Update Form 2File: Form 02 - Mar 2025.pdf | 28 Jun 2025 |
| Withdrawal Update Form 3File: Form 03 - Mar 2025.pdf | 28 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Empire C A certificate Rera Final.pdf | 17 Apr 2024 |
| Copy of the legal title reportFile: Empire Search Report_compressed-1-13.pdf | 12 Mar 2024 |
| Copy of the legal title reportFile: Empire Search Report_compressed-14-15.pdf | 12 Mar 2024 |
| Layout approvalFile: LAY OUT FINAL VERIFIED.pdf | 1 Dec 2023 |
| Layout approvalFile: Ramnagari Layout.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrances.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: encumbrances.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to LegalFile: encumbrances.pdf | 1 Dec 2023 |
| Details of encumbrances concerned to LegalFile: encumbrances.pdf | 1 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: LAY OUT FINAL VERIFIED.pdf | 1 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Ramnagari Layout.pdf | 1 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of sold_ booked inventory.pdf | 1 Dec 2023 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 1 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank.pdf | 1 Dec 2023 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 8 Nov 2023 |
| PAN CardFile: 1 PAN Card.pdf | 8 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 8 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf | 8 Nov 2023 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 8 Nov 2023 |
| Declaration in FORM BFile: 1 Declaration in FORM B (1).pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 8 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 8 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf | 8 Nov 2023 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 8 Nov 2023 |
| Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf | 8 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf | 8 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf | 8 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE GANESH EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Hutama Smark4,100+ in Nashik
Filed coordinates, straight-line distance. 29 registered projects within 2 km.
SAI ANAND PRIDE-B
DEEPAK KALYANJI CHANDE
VEDANT AANANDVAN
GORAKSHNATH DASHRATH MHASKE
AVADHOOT HIGH CITY PHASE 1
Avadhoot Developers
Ramtek Ayodhya
Shinde Construction
SHREE SHANKAR ENCLAVE
Akash Anilkumar Bumb
ALANKAPURI
D S DEVELOPERS
See every Nashik project, with the district possession charts
Builder: SHREE GANESH CONSTRUCTION
SHREE GANESH CONSTRUCTION has 10 registrations on MahaRERA, including ANAND VIHAR and GANESH SHRUSHTI. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE GANESH EMPIRE is delayed beyond 31 Dec 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GANESH EMPIRE?
The registered promoter entity is SHREE GANESH CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GANESH EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GANESH EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GANESH EMPIRE?
The professionals named in the filing: Architect: GaneshBhanudas Handore; Engineer: Ganesh Bhanudas Handore; Chartered Accountant: Amol Mahajan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GANESH EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback