Home / Browse projects / Nashik, Maharashtra / VEDANT AANANDVAN
VEDANT AANANDVAN
By GORAKSHNATH DASHRATH MHASKE
RG-MH-77417 · RERA P51600055491 · Last updated on MahaRERA portal: 18 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VEDANT AANANDVAN is a Others project by GORAKSHNATH DASHRATH MHASKE in Nashik, Maharashtra, registered with MahaRERA as P51600055491 on 2 Apr 2024. Possession is promised by 31 Dec 2029. 1 of the 143 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.
At a glance
Project
- NameVEDANT AANANDVAN
- TypeOthers
- Location
- NASHIK PUNE ROAD
- PRAKASH NAGAR
- Sinnar(M Cl)
- Sinnar
- Nashik
- 422103
- Pincode422103
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600055491
- ReraGenie IDRG-MH-77417
Builder
- NameGORAKSHNATH DASHRATH MHASKE
- Entity typeIndividual
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Apr 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings4 building records
- Documents filed46 files
Current status
Figures as on 18 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VEDANT AANANDVAN WING A | NA | 8 | 8 | 42 | 4 | 46 |
| VEDANT AANANDVAN WING B | NA | 7 | 7 | 36 | 0 | 36 |
| VEDANT AANANDVAN WING C | NA | 8 | 8 | 42 | 11 | 53 |
| VEDANT AANANDVAN WING D | NA | 1 | 1 | 0 | 8 | 8 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 18 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 80%.
VEDANT AANANDVAN WING A32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VEDANT AANANDVAN WING B35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 60% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VEDANT AANANDVAN WING C33%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
VEDANT AANANDVAN WING D23%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed154
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| VEDANT AANANDVAN WING A | 1 | 19 | 20 |
| VEDANT AANANDVAN WING B | 1 | 76 | 77 |
| VEDANT AANANDVAN WING C | 1 | 56 | 57 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VEDANT AANANDVAN WING A | NA | Rs 11.60 cr | Rs 5.84 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SACHIN WAGH & ASSOCIATES |
| Architect | SACHIN M WAGH |
| Engineer | SACHIN WAGH & ASSOCIATES |
| Engineer | SACHIN M WAGH |
| Chartered Accountant | BAJIRAO GOVIND JADHAV |
| Chartered Accountant | MAYUR WAGH & ASSOCIATES |
| Chartered Accountant | HARSHAD B. JADHAV & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GORAKSHNATH DASHRATH MHASKE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed46
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Commencement certificateFile: Vedant Aanandvan Comencement Certificate Original Scan 28022024.pdf | 18 Jul 2025 |
| Declaration and undertaking (Annexure A)File: Vedant Aanadvan Declaration Undertaking 01032024.pdf | 18 Jul 2025 |
| Form 1File: Vedant Aanandvan Form 1 Q1 05_07_2024.pdf | 3 Jun 2025 |
| Form 2File: Vedant Aanandvan Form 2 Q1 10_07_2024.pdf | 3 Jun 2025 |
| Form 3File: Vedant Aanandvan Form 3 Q1 15_07_2024.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 05_07_2024.pdf | 3 Jun 2025 |
| Form 1File: Vedant Aanandvan Form 1 Q2 05_10_2024.pdf | 3 Jun 2025 |
| Form 2File: Vedant Aanandvan Form 2 Q2 08_10_2024.pdf | 3 Jun 2025 |
| Form 3File: Vedant Aanandvan Form 3 Q2 25_10_2024.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 10_10_2024.pdf | 3 Jun 2025 |
| Form 1File: Vedant Aanandvan Form 1 Q3 07_01_2025.pdf | 3 Jun 2025 |
| Form 2File: Vedant Aanandvan Form 2 Q3 10_01_2025.pdf | 3 Jun 2025 |
| Form 3File: Vedant Aanandvan Form 3 Q3 18_01_2025.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 11_01_2025.pdf | 3 Jun 2025 |
| Form 1File: Vedant Aanandvan Form 1 Q4 17_04_2025.pdf | 3 Jun 2025 |
| Form 2File: Vedant Aanandvan Form 2 Q4 21_04_2025.pdf | 3 Jun 2025 |
| Form 3File: Vedant Aanandvan Form 3 Q4 05_05_2025.pdf | 3 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 26_05_2025.pdf | 3 Jun 2025 |
| Form 2A (FY 2024-2025) | 3 Jun 2025 |
| Form 5 (FY 2024-2025)File: Vedant Aanandvan Form 5 FY 24-25 13_05_2025.pdf | 3 Jun 2025 |
| Building plan approvalFile: Vedant Anandvan IOD Plan 21032024.pdf | 26 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Vedant Anandvan IOD Plan 21032024.pdf | 26 Mar 2024 |
| Layout approvalFile: Vedant Aandvan Layout 22022024.pdf | 1 Mar 2024 |
| Building plan approvalFile: Vedant Aanandvan IOD 1.pdf | 1 Mar 2024 |
| Building plan approvalFile: Vedant Aanandvan IOD 2.pdf | 1 Mar 2024 |
| PAN CardFile: Gorakshnath Mhaske PAN Card original.pdf | 1 Mar 2024 |
| Copy of the legal title reportFile: Vedant Aandvan Title Report 27022024 Final.pdf | 1 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Vedant Aanadvan No Encumbrance Finance 16022024.pdf | 1 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Vedant Aanadvan Encumbrance Legal 27022024.pdf | 1 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Vedant Aanadvan No Encumbrance Finance 16022024.pdf | 1 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Vedant Aanadvan Encumbrance Legal 27022024.pdf | 1 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Vedant Aandvan Layout 22022024.pdf | 1 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Vedant Aanandvan IOD 1.pdf | 1 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Vedant Aanandvan IOD 2.pdf | 1 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Vedant Aanandvan Comencement Certificate Original Scan 28022024.pdf | 1 Mar 2024 |
| Declaration about Commencement CertificateFile: Vedant Aanadvan Format D 27022024.pdf | 1 Mar 2024 |
| Declaration in FORM BFile: Vedant Aandvan Form B 27022024.pdf | 1 Mar 2024 |
| CERSAI detailsFile: Vedant Aanandvan CERSAI_Search_Report_200298066587_For_Asset_Based_Search_24_02_2024_18_04 | 1 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vedant Aanadvan Form 3 Final 05022024.pdf | 1 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Vedant Aanadvan Disclosure Other 24022024.pdf | 1 Mar 2024 |
| Proforma of Allotment letterFile: Vedant Aanadvan Allotment Letter 27022024_Final.pdf | 1 Mar 2024 |
| Proforma of Agreement for saleFile: Vedant Aanandvan Agreement Draft.pdf | 1 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Vedant Aanadvan Format A Bank 23022024.pdf | 1 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: Vedant Aanadvan Deviation Allotment 27022024.pdf | 1 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: Vedant Aanadvan Deviation Agreement 23022024.pdf | 1 Mar 2024 |
| Other - TechnicalFile: Vedant Aanadvan Declaration Undertaking 01032024.pdf | 1 Mar 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| VEDANT PRASAD APARTMENT | DWARKA NAGAR SINNAR | 25 | Ongoing | Dec 2028 | Dec 2028 |
| VEDANT PARK | MAUJE SINNAR | 56 | Completed | Jun 2021 | Mar 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 46 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep VEDANT AANANDVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PRAKASH NAGAR4,100+ in Nashik
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
SAI ANAND PRIDE-B
DEEPAK KALYANJI CHANDE
AVADHOOT HIGH CITY PHASE 1
Avadhoot Developers
Ramtek Ayodhya
Shinde Construction
SHREE SHANKAR ENCLAVE
Akash Anilkumar Bumb
SHREE GANESH EMPIRE
SHREE GANESH CONSTRUCTION
ALANKAPURI
D S DEVELOPERS
See every Nashik project, with the district possession charts
Builder: GORAKSHNATH DASHRATH MHASKE
GORAKSHNATH DASHRATH MHASKE has 1 registration on MahaRERA, including VEDANT AANANDVAN. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if VEDANT AANANDVAN is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VEDANT AANANDVAN?
The registered promoter entity is GORAKSHNATH DASHRATH MHASKE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VEDANT AANANDVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VEDANT AANANDVAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VEDANT AANANDVAN?
The professionals named in the filing: Architect: SACHIN WAGH & ASSOCIATES; Architect: SACHIN M WAGH; Engineer: SACHIN WAGH & ASSOCIATES; Engineer: SACHIN M WAGH; Chartered Accountant: BAJIRAO GOVIND JADHAV; Chartered Accountant: MAYUR WAGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VEDANT AANANDVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback