Home / Browse projects / Nashik, Maharashtra / VEDANT AANANDVAN

Registered No litigation declared Others project

VEDANT AANANDVAN

By GORAKSHNATH DASHRATH MHASKE

RG-MH-77417 · RERA P51600055491 · Last updated on MahaRERA portal: 18 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
8 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 80%
142 of 143Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

VEDANT AANANDVAN is a Others project by GORAKSHNATH DASHRATH MHASKE in Nashik, Maharashtra, registered with MahaRERA as P51600055491 on 2 Apr 2024. Possession is promised by 31 Dec 2029. 1 of the 143 units on this registration are recorded sold or booked, and 8 of 44 construction stages are filed complete.

At a glance

Project

  • NameVEDANT AANANDVAN
  • TypeOthers
  • Location
    • NASHIK PUNE ROAD
    • PRAKASH NAGAR
    • Sinnar(M Cl)
    • Sinnar
    • Nashik
    • 422103
  • Pincode422103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600055491
  • ReraGenie IDRG-MH-77417

Builder

  • NameGORAKSHNATH DASHRATH MHASKE
  • Entity typeIndividual
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed46 files

Current status

1%1 of 143 units booked
50.3%Work done, per cost certificate

Figures as on 18 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VEDANT AANANDVAN WING ANA8842446
VEDANT AANANDVAN WING BNA7736036
VEDANT AANANDVAN WING CNA88421153
VEDANT AANANDVAN WING DNA11088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

VEDANT AANANDVAN WING A32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VEDANT AANANDVAN WING B35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VEDANT AANANDVAN WING C33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
VEDANT AANANDVAN WING D23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed154

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots154
Closed/Covered3
Open Space151
BuildingClosed/CoveredOpen SpaceTotal
VEDANT AANANDVAN WING A11920
VEDANT AANANDVAN WING B17677
VEDANT AANANDVAN WING C15657

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,668 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025

Approvals and building plan

Sanctioning authoritySINNAR MUNICIPAL COUNCIL
Permissible FSI11003.17
Proposed, not sanctioned8,538 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSBI NASHIK HIGHWAY OPP S T STAND SINNAR NASHIK 422103
Estimated costRs 11.60 cr
Cost incurredRs 5.84 cr
Work done50.32%
BuildingWingEstimatedIncurred
VEDANT AANANDVAN WING ANARs 11.60 crRs 5.84 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN WAGH & ASSOCIATES
ArchitectSACHIN M WAGH
EngineerSACHIN WAGH & ASSOCIATES
EngineerSACHIN M WAGH
Chartered AccountantBAJIRAO GOVIND JADHAV
Chartered AccountantMAYUR WAGH & ASSOCIATES
Chartered AccountantHARSHAD B. JADHAV & ASSOCIATES
PartnerRole in project
GORAKSHNATH DASHRATH MHASKE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Vedant Aanandvan Comencement Certificate Original Scan 28022024.pdf18 Jul 2025
Declaration and undertaking (Annexure A)File: Vedant Aanadvan Declaration Undertaking 01032024.pdf18 Jul 2025
Form 1File: Vedant Aanandvan Form 1 Q1 05_07_2024.pdf3 Jun 2025
Form 2File: Vedant Aanandvan Form 2 Q1 10_07_2024.pdf3 Jun 2025
Form 3File: Vedant Aanandvan Form 3 Q1 15_07_2024.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 05_07_2024.pdf3 Jun 2025
Form 1File: Vedant Aanandvan Form 1 Q2 05_10_2024.pdf3 Jun 2025
Form 2File: Vedant Aanandvan Form 2 Q2 08_10_2024.pdf3 Jun 2025
Form 3File: Vedant Aanandvan Form 3 Q2 25_10_2024.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 10_10_2024.pdf3 Jun 2025
Form 1File: Vedant Aanandvan Form 1 Q3 07_01_2025.pdf3 Jun 2025
Form 2File: Vedant Aanandvan Form 2 Q3 10_01_2025.pdf3 Jun 2025
Form 3File: Vedant Aanandvan Form 3 Q3 18_01_2025.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 11_01_2025.pdf3 Jun 2025
Form 1File: Vedant Aanandvan Form 1 Q4 17_04_2025.pdf3 Jun 2025
Form 2File: Vedant Aanandvan Form 2 Q4 21_04_2025.pdf3 Jun 2025
Form 3File: Vedant Aanandvan Form 3 Q4 05_05_2025.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Vedant Aanandvan Discloser Sold_Unsold 26_05_2025.pdf3 Jun 2025
Form 2A (FY 2024-2025)3 Jun 2025
Form 5 (FY 2024-2025)File: Vedant Aanandvan Form 5 FY 24-25 13_05_2025.pdf3 Jun 2025
Building plan approvalFile: Vedant Anandvan IOD Plan 21032024.pdf26 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Vedant Anandvan IOD Plan 21032024.pdf26 Mar 2024
Layout approvalFile: Vedant Aandvan Layout 22022024.pdf1 Mar 2024
Building plan approvalFile: Vedant Aanandvan IOD 1.pdf1 Mar 2024
Building plan approvalFile: Vedant Aanandvan IOD 2.pdf1 Mar 2024
PAN CardFile: Gorakshnath Mhaske PAN Card original.pdf1 Mar 2024
Copy of the legal title reportFile: Vedant Aandvan Title Report 27022024 Final.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: Vedant Aanadvan No Encumbrance Finance 16022024.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: Vedant Aanadvan Encumbrance Legal 27022024.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: Vedant Aanadvan No Encumbrance Finance 16022024.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: Vedant Aanadvan Encumbrance Legal 27022024.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: Vedant Aandvan Layout 22022024.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Vedant Aanandvan IOD 1.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Vedant Aanandvan IOD 2.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Vedant Aanandvan Comencement Certificate Original Scan 28022024.pdf1 Mar 2024
Declaration about Commencement CertificateFile: Vedant Aanadvan Format D 27022024.pdf1 Mar 2024
Declaration in FORM BFile: Vedant Aandvan Form B 27022024.pdf1 Mar 2024
CERSAI detailsFile: Vedant Aanandvan CERSAI_Search_Report_200298066587_For_Asset_Based_Search_24_02_2024_18_041 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vedant Aanadvan Form 3 Final 05022024.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Vedant Aanadvan Disclosure Other 24022024.pdf1 Mar 2024
Proforma of Allotment letterFile: Vedant Aanadvan Allotment Letter 27022024_Final.pdf1 Mar 2024
Proforma of Agreement for saleFile: Vedant Aanandvan Agreement Draft.pdf1 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Vedant Aanadvan Format A Bank 23022024.pdf1 Mar 2024
Deviation Report with respect to Allotment letterFile: Vedant Aanadvan Deviation Allotment 27022024.pdf1 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Vedant Aanadvan Deviation Agreement 23022024.pdf1 Mar 2024
Other - TechnicalFile: Vedant Aanadvan Declaration Undertaking 01032024.pdf1 Mar 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
VEDANT PRASAD APARTMENTDWARKA NAGAR SINNAR25OngoingDec 2028Dec 2028
VEDANT PARKMAUJE SINNAR56CompletedJun 2021Mar 2021

How this compares with Nashik

1%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VEDANT AANANDVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PRAKASH NAGAR4,100+ in Nashik

2 kmVEDANT AANANDVANCompleted 8Lapsed / revoked 9Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: GORAKSHNATH DASHRATH MHASKE

GORAKSHNATH DASHRATH MHASKE has 1 registration on MahaRERA, including VEDANT AANANDVAN. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if VEDANT AANANDVAN is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VEDANT AANANDVAN?

The registered promoter entity is GORAKSHNATH DASHRATH MHASKE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VEDANT AANANDVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VEDANT AANANDVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VEDANT AANANDVAN?

The professionals named in the filing: Architect: SACHIN WAGH & ASSOCIATES; Architect: SACHIN M WAGH; Engineer: SACHIN WAGH & ASSOCIATES; Engineer: SACHIN M WAGH; Chartered Accountant: BAJIRAO GOVIND JADHAV; Chartered Accountant: MAYUR WAGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VEDANT AANANDVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VEDANT AANANDVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VEDANT AANANDVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.