ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SHIV SOLITAIRE

Registered No litigation declared Residential / Group Housing project

SHIV SOLITAIRE

By OM SHIVAM BUILDCON PRIVATE LIMITED

RG-MH-89655 · RERA PR1190002601981 · Last updated on MahaRERA portal: 29 Aug 2026

Source: official MahaRERA filing

Red flags

  • Rs 18.00 crore secured on the land, in favour of UCO BANK
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • All 10 completed earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Aug 2031Possession promisedno revision filed
6 of 54Construction stages doneacross 6 buildings; furthest along: Plinth, 0%
329 of 329Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

SHIV SOLITAIRE is a Residential / Group Housing project by OM SHIVAM BUILDCON PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as PR1190002601981 on 21 Sep 2026. Possession is promised by 31 Aug 2031. 0 of the 329 units on this registration are recorded sold or booked, and 6 of 54 construction stages are filed complete.

At a glance

Project

  • NameSHIV SOLITAIRE
  • TypeResidential / Group Housing
  • Location
    • Mouza - Khapri Railway
    • MIHAN
    • Butibori
    • Nagpur (Rural)
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1190002601981
  • ReraGenie IDRG-MH-89655

Builder

  • NameOM SHIVAM BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2004PTC149476
  • GSTIN27AAACO7165P1ZT
  • DirectorsCHANDRASHEKHAR KISANRAO KAPSE, RAVINDRA KISANRAO KAPSE, PRAMOD KISANRAO KAPSE, CHAITANYA RAVINDRA KAPSE
  • Director And Authorized SignatoryOM RAVINDRA KAPSE
  • Other registrations11 more →
  • Completed10 of 12
  • Declared earlier projects21 →

Key dates

this monthRegisteredSep 2026PromisedAug 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Sep 2026
  • Promised completion31 Aug 2031
  • Revised completionNone
  • Buildings6 building records
  • Documents filed15 files

Current status

0%0 of 329 units booked

Figures as on 29 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA10954054
WING BNA10954054
WING CNA10954054
WING DNA10954054
WING ENA10954054
WING FNA111059059

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 54 construction stages are filed complete across 6 buildings. The stage furthest along is Plinth, at 0%.

WING A11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING E11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING F11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed565

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots565
Stilt / Ground565
BuildingStilt / GroundTotal
WING A9292
WING B9292
WING C9292
WING D9292
WING E9292
WING F105105

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area15,975 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofUCO BANK
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on15 Sep 2026

Approvals and building plan

Permissible FSI33228.22
Proposed, not sanctioned32,415 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDIAN BUREAU OF MINES H.O. ,INDIRA BHAWAN,CIVIL LINES,NAGPUR ,NAGPUR ,MAHARASHTRA PIN 440001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEKVEERA ARCHITECTS
EngineerANIL DESHMUKH
Chartered AccountantGAD AND ASSOCIATES
PartnerRole in project
OM SHIVAM BUILDCON PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2031

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: SANCTIONED PLAN-1_.pdf29 Aug 2026
Layout approvalFile: SANCTIONED PLAN-1_.pdf29 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-2.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-3.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-4.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-5.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-6.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-7.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-8.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-9.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-10.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-11.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-12.pdf27 Aug 2026
Building plan approvalFile: SANCTIONED PLAN-13.pdf27 Aug 2026
Declaration and undertaking (Annexure A)File: ANNEXURE A.pdf26 Aug 2026

Promoter's earlier projects11

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Shiv Kailasa Phase IIP50500029945Opp. AIIMS, MIHAN, Nagpur, Nagpur1,471Jul 2021OngoingDec 2026Not due yet
Shiv Kailasa Phase IP50500018424Mouza - Sondapar (Rithi), Ph. No. 77, Tah. - Hingna, Distt - Nagpur, Nagpur-Oct 2018CompletedOct 2024Oct 2024
Shiv Brighton Phase IVP50500024193Mouza - Panjri (BZ), Wardha Road, Nagpur, Nagpur-Jan 2020CompletedJan 2024Jan 2024
Shiv Brighton Phase IIIP50500024271Wardha Road, Nagpur, Nagpur-Jan 2020CompletedJan 2024Jan 2024
Shiv Elite Phase IV GeraniumP50500017835Shankarpur Wardha Road Nagpur, Nagpur-Sep 2018CompletedAug 2022Aug 2022
Shiv Brighton Phase IIP50500006295Panjari farm, Nagpur-Aug 2017CompletedJan 2021Jan 2021
Shiv Brighton Phase IP50500006203Panjari farm, Nagpur-Aug 2017CompletedJan 2021Jan 2021
Shiv Elite Phase IVP50500009553Shankarpur, Nagpur-Aug 2017CompletedJan 2021Jan 2021
Shiv Elite Phase IIIP50500005732Shankarpur, Nagpur-Aug 2017CompletedJul 2019Jul 2019
Shiv Elite Phase IIP50500007132Shankarpur, Nagpur-Aug 2017CompletedJul 2018Jul 2018
Shiv Elite Phase IP50500009639Shankarpur, Nagpur-Aug 2017CompletedJul 2018Jul 2018

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV SOLITAIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIHAN2,800+ in Nagpur

2 kmSHIV SOLITAIRECompleted 10Lapsed / revoked 2Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: OM SHIVAM BUILDCON PRIVATE LIMITED

Om Shivam Buildcon Private Limited has 12 registrations on MahaRERA, including Shiv Elite Phase I and Shiv Elite Phase II. Its filings disclose 21 earlier MahaRERA projects: declares 19 of 20 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SHIV SOLITAIRE is delayed beyond 31 Aug 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV SOLITAIRE?

The registered promoter entity is OM SHIVAM BUILDCON PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2004PTC149476 and GSTIN 27AAACO7165P1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV SOLITAIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV SOLITAIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV SOLITAIRE?

The professionals named in the filing: Architect: EKVEERA ARCHITECTS; Engineer: ANIL DESHMUKH; Chartered Accountant: GAD AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV SOLITAIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV SOLITAIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV SOLITAIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.