SHIV KRUPA COMPLEX

By SHREE RADHE CONSTRUCTION

RG-MH-12792 · RERA P99000022459 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
9 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 75%
187 of 197Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

SHIV KRUPA COMPLEX is a Others project by SHREE RADHE CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000022459 on 24 Sep 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 10 of the 197 units on this registration are recorded sold or booked, and 9 of 55 construction stages are filed complete.

At a glance

Project

  • NameSHIV KRUPA COMPLEX
  • TypeOthers
  • Location
    • ACHOLE ROAD
    • ACHOLE
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000022459
  • ReraGenie IDRG-MH-12792

Builder

  • NameSHREE RADHE CONSTRUCTION
  • Entity typePartnership
  • PartnersASHWIN SAMPATHRAJ JAIN, RAJ HARISHCHANDRA THAKUR
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredSep 2019First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings5 building records
  • Documents filed36 files

Current status

5%10 of 197 units booked
67.8%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIV HEIGHTS WING ANA1919821092
SHIV HEIGHTS WING BNA19181050105
SHIV HEIGHTS WING CNA00000
SHIV HEIGHTS WING aNA00000
SHIV HEIGHTS WING cNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 75%.

SHIV HEIGHTS WING A51%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises67%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIV HEIGHTS WING B61%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises36%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.57%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIV HEIGHTS WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIV HEIGHTS WING a0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIV HEIGHTS WING c0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes5%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Open Space81
BuildingOpen SpaceTotal
SHIV HEIGHTS WING A4141
SHIV HEIGHTS WING B4040

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,680 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Apr 2026
LandownerVillageDistrict
SHIV KRUPA COMPLEX CO OP HOUSING SOCIETYVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI12094.25
Proposed, not sanctioned12,094 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr and 1 Floor, Esperanca Poly CHSL IC Colony Borivali West Mumbai 400 103
Estimated costRs 43.02 cr
Cost incurredRs 29.19 cr
Work done67.84%
BuildingWingEstimatedIncurred
SHIV HEIGHTS WING ANARs 19.39 crRs 14.16 cr
SHIV HEIGHTS WING BNARs 17.17 crRs 14.77 cr
-NARs 6.45 crRs 25.81 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUMESH KEKRE
ArchitectMUFADDAL MERCHANT
EngineerJAY SHREE KRISHNA
EngineerMUKESH KUMAR
EngineerATUL J SAWANT
EngineerSURENDRA TIWARI
Chartered AccountantASHWIN NAIR
Chartered AccountantA RAJGARIA AND CO.
Chartered AccountantRASM AND ASSOCIATES LLP
PartnerRole in project
SHREE RADHE CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000027659Dec 2023 → Dec 2027

Reason as filed by the promoterImpact of Pandemic and Rising Construction Material Costs:The COVID-19 pandemic has had a profound and far-reaching impact on the construction industry, both locally and globally. As a direct consequence of the pandemic, there has been a significant and sustained increase in the prices of essential construction materials, including but not limited to cement, steel, copper, electrical components, plumbing materials, and paints. This escalation in material costs has resulted in severe financial strain, disrupting the supply chain and leading to delays in procurement and delivery of these materia

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ SHIV KRUPA COMPLEX.pdf22 Apr 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ SHIV KRUPA COMPLEX.pdf22 Apr 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ SHIV KRUPA COMPLEX_compressed.pdf22 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A_MARCH 2026_SHIV KRUPA COMPLEX.pdf22 Apr 2026
Form 5 (FY 2024-2025)File: FORM 5_MARCH 2025_SHIV KRUPA COMPLEX.pdf22 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf13 Apr 2026
Form 1File: F-I OCT-DEC 2025.pdf21 Jan 2026
Form 2File: FORM II SHIV KRUPA OCT DEC 25.pdf21 Jan 2026
Form 3File: FORM 3_Dec 2025.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 2025.pdf21 Jan 2026
Form 1File: FORM -1 SHIVKRUPA COMPLEX(APR-JUN 2025).pdf25 Oct 2025
Form 2File: FORM II SHIV KRUPA JUL-SEP 2025 (1).pdf25 Oct 2025
Form 3File: Form 3 Sept 2025 (1).pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: flat sold unsold Sept 2025.pdf25 Oct 2025
Form 2File: Form II shivkrupa June 2025.pdf20 Jul 2025
Form 1File: Adobe Scan 21 Feb 2025.pdf20 Jul 2025
Form 3File: Form 3_RERA_SRC_June2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: flat sold unsold june 2025.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 24.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 24.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_compressed.pdf17 Sep 2019
Building plan approvalFile: BLUE PRINT.pdf16 Sep 2019
Layout approvalFile: LAYOUT.pdf16 Sep 2019
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf16 Sep 2019
Details of encumbrancesFile: encumberance_compressed.pdf16 Sep 2019
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf16 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT.pdf16 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: C Cilovepdf_merged_compressed.pdf16 Sep 2019
Declaration in FORM BFile: FORM B_compressed.pdf16 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1ilovepdf_merged_compressed.pdf16 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2, RCC Certificate_compressed.pdf16 Sep 2019
Proforma of Allotment letterFile: performa.pdf16 Sep 2019

How this compares with Palghar

5%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 48 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV KRUPA COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ACHOLE3,200+ in Palghar

2 kmSHIV KRUPA COMPLEXCompleted 43Lapsed / revoked 32Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 149 registered projects within 2 km.

Builder: SHREE RADHE CONSTRUCTION

SHREE RADHE CONSTRUCTION has 3 registrations on MahaRERA, including VRAJ BHUMI and SHIV KRUPA COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHIV KRUPA COMPLEX is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV KRUPA COMPLEX?

The registered promoter entity is SHREE RADHE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV KRUPA COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV KRUPA COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV KRUPA COMPLEX?

The professionals named in the filing: Architect: UMESH KEKRE; Architect: MUFADDAL MERCHANT; Engineer: JAY SHREE KRISHNA; Engineer: MUKESH KUMAR; Engineer: ATUL J SAWANT; Engineer: SURENDRA TIWARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV KRUPA COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV KRUPA COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV KRUPA COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.