Home / Browse projects / Thane, Maharashtra / SHIV JIVDANI SADAN

Completed No litigation declared Residential / Group Housing project

SHIV JIVDANI SADAN

By SHUBHAM BUILDERS & DEVELOPERS

RG-MH-04115 · RERA P51700021173 · Last updated on MahaRERA portal: 29 Aug 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2023Possession promisedregistration recorded completed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 20%
0Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

SHIV JIVDANI SADAN is a Residential / Group Housing project by SHUBHAM BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700021173 on 14 Jun 2019. The registration is recorded completed; possession was promised by 31 Aug 2023. The completion date has moved by 15 months from the original filing.

At a glance

Project

  • NameSHIV JIVDANI SADAN
  • TypeResidential / Group Housing
  • Location
    • MAHATMA PHULE ROAD
    • GARIBACHA WADA
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700021173
  • ReraGenie IDRG-MH-04115

Builder

  • NameSHUBHAM BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersSANTOSH ANANT BHOIR, VIJAY BABU MHATRE, SHARMILA VIJAY MHATRE, VAIBHAV VIJAY MHATRE, POORNIMA SANTOSH BHOIR, SUNANDA RAMESH MHATRE
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJun 2019First promiseMay 2022Revised toAug 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Jun 2019
  • Promised completion31 Aug 2023
  • Revised completionRevised to 31 Aug 2023 (originally 30 May 2022)
  • Buildings2 building records
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 2, C WingNA180000
Building No 3,E WingNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 20%.

Building No 2, C Wing38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 3,E Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered11
BuildingClosed/CoveredTotal
Building No 2, C Wing99
Building No 3,E Wing22

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
ASHISH BALU BHOIRDOMBIVLIThane
KIRAN ANANT BHOIRDOMBIVLIThane
SANTOSH ANANT BHOIRDOMBIVLIThane
NITESH ANANT BHOIRDOMBIVLIThane
BABU CHANDRAKANT BHOIRDOMBIVLIThane
SUDHAKAR TUKARAM BHOIRDOMBIVLIThane
PRALHAD TUKARAM BHOIRDOMBIVLIThane

Approvals and building plan

Permissible FSI3426.0
Proposed, not sanctioned3,162 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchISHAAN, GROUND FLOOR, MAHATMA PHULE ROAD, DOMBIVLI WEST - 421202

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTIBIN TONSON THOMAS
ArchitectVARGHESE JOHN
EngineerMANOHAR VISHNU PATIL
Chartered AccountantSonali Sunil Mhare
Chartered AccountantSwapnil Suresh Vardam
PartnerRole in project
SHUBHAM BUILDERS & DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700012532May 2022 → Aug 2023

Reason as filed by the promoterProject could not be completed in stipulated time due to COVID 19 pandemic situation, Market conditions, delay from the contractor's side and scarcity of certain raw materials needed for civil work on site, which further delayed the construction process. Due to aforementioned circumstances, we are request to you goodself to grant Extension for date of completion upto 31.08.2023

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Aug 2023

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shubham Oc Certificate 29082023.pdf29 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form No 5FY 201920Shubham.pdf21 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form No 5FY 2021 Shubham.pdf21 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf10 Aug 2022
Disclosure of sold/ booked inventoryFile: Inventory as on 31052022.pdf23 Jun 2022
Building plan approvalFile: scan0640_11zon.pdf4 Mar 2022
Layout approvalFile: scan0641_11zon.pdf4 Mar 2022
Copy of Layout Approval (in case of layout)File: scan0641_11zon.pdf4 Mar 2022
Building Plan Approval (IOD)File: scan0640_11zon.pdf4 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: rEVISED cc_compressed.pdf4 Mar 2022
Declaration about Commencement CertificateFile: Declaration for CC.pdf4 Mar 2022
Building plan approvalFile: Plan 0001.pdf1 Jun 2019
Layout approvalFile: Plan 0002.pdf1 Jun 2019
PAN CardFile: Pan Card Copy.pdf1 Jun 2019
Copy of the legal title reportFile: Title Certificate.pdf1 Jun 2019
Details of encumbrancesFile: No Encumbrances Certificate.pdf1 Jun 2019
Copy of Layout Approval (in case of layout)File: Plan 0002.pdf1 Jun 2019
Building Plan Approval (IOD)File: Plan 0001.pdf1 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_reduce.pdf1 Jun 2019
Declaration in FORM BFile: Vijay Babu Mhatre Form B_reduce.pdf1 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_reduce.pdf1 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_reduce.pdf1 Jun 2019
Certificates of CA (Form 3)File: CA Certificate_Sonali Mhatre_reduce.pdf1 Jun 2019
Proforma of Allotment letterFile: SALE AGREEMENT-SHIV JIVDANI SADAN as per RERA.pdf1 Jun 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 15 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV JIVDANI SADAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GARIBACHA WADA7,600+ in Thane

2 kmSHIV JIVDANI SADANCompleted 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: SHUBHAM BUILDERS & DEVELOPERS

SHUBHAM BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including JIJAI COMPLEX and SHIV JIVDANI SADAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHIV JIVDANI SADAN is delayed beyond 31 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV JIVDANI SADAN?

The registered promoter entity is SHUBHAM BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV JIVDANI SADAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV JIVDANI SADAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV JIVDANI SADAN?

The professionals named in the filing: Architect: TIBIN TONSON THOMAS; Architect: VARGHESE JOHN; Engineer: MANOHAR VISHNU PATIL; Chartered Accountant: Sonali Sunil Mhare; Chartered Accountant: Swapnil Suresh Vardam. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV JIVDANI SADAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV JIVDANI SADAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV JIVDANI SADAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.