SHETH AVALON - PHASE 1

By Sheth Developers Private Limited

RG-MH-09157 · RERA P51700001729 · Last updated on MahaRERA portal: 30 Jan 2023

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
49 of 55Construction stages doneacross 5 buildings; furthest along: Installation of Lifts, 99%
10Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

SHETH AVALON - PHASE 1 is a Residential / Group Housing project by Sheth Developers Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700001729 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 10 complaints are on record with the regulator.

At a glance

Project

  • NameSHETH AVALON - PHASE 1
  • TypeResidential / Group Housing
  • Location
    • W E HIGHWAY POKKHARAN RD NO 2
    • MAJIWADA
    • Thane (M Corp.)
    • Thane
    • 400601
  • Pincode400601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001729
  • ReraGenie IDRG-MH-09157

Builder

  • NameSheth Developers Private Limited
  • Entity typeCompany
  • CINU45200MH1993PTC070335
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorAshwin Sheth
  • Other registrations9 more →
  • Completed3 of 10
  • Declared earlier projects11 →

Key dates

this monthRegisteredJul 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • Buildings5 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER DNA330000
TOWER ENA330000
TOWER FNA330000
TOWER GNA310000
TOWER HNA310000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 30 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

49 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Installation of Lifts, at 99%.

TOWER D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%
TOWER E100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
TOWER F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
TOWER G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER H99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 30 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes98%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes98%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceYes95%
Open ParkingYes90%
GYMNASIUM SWIMMING POOL CLUB HOUSE AND OTHER RECREATION FACILITIESYes0%

Parking filed892

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots892
Closed/Covered892
BuildingClosed/CoveredTotal
TOWER D110110
TOWER E110110
TOWER F110110
TOWER G281281
TOWER H281281

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,025 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI36099.04
Proposed, not sanctioned25,710 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR D B HOUSE YASHODHAM GEN A K VAIDYA MARG GOREGAON EAST MUMBAI 400063

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL JAGWANI
EngineerRAMBOLL INDIA PRIVATE LIMITED
PartnerRole in project
Sheth Developers Private Limited-

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC006000000079317VIJAY SHARMASHETH DEVELOPERS PRIVATE LIMITED17/05/2019
CC006000000089882ACHAL ANANDSHETH DEVELOPERS PVT LTD27/06/2019
CC006000000193401Savita SarafSheth Developers Private Limited08/07/2020
CC006000000195295Jaychandran Ramavarma NairSheth Developers pvt ltd, through director Maulik Ashwin Sheth19/12/2020
CC006000000196225Sheth Developers Private LimitedMr. Rahul Sirkhe and Mrs Pomy Nandy02/03/2021
CC006000000197009Sheth Developers Pvt LtdVijay Sharma14/05/2021
CC006000000199317Purvi ShahSeth Developers Pvt Ltd Co08/12/2021
CC006000000303758Mugdha Nilesh DesaiSheth Developers Pvt Ltd26/12/2022
CC006000000396947SHETH DEVELOPERS PVT LTDAchal Anand04/08/2023
CC006000000396952SHETH DEVELOPERS PVT LTDACHAL ANAND04/08/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Mar 2021

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Avalon Ph 1 Form 4.pdf30 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: WING D_compressed.pdf8 Mar 2022
Architect’s Certificate on Completion of Project (Form 4)File: WING E_F 1_compressed.pdf8 Mar 2022
Architect’s Certificate on Completion of Project (Form 4)File: WING H 1_compressed.pdf8 Mar 2022
Certificates of CA (Form 3)File: Sheth Avalon Ph 1 09-11-2021 Form 3.pdf12 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form_-_5_-_Sheth_Avalon_D_To_H.pdf22 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Avalon_G_Wing_Society_Register.pdf19 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Avalon Ph 1.pdf3 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Avalon D- O C copy.pdf24 Mar 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVALON E and F OC Copy.pdf24 Mar 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc avalon H.pdf24 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FROM 5 - AVALON D TO H.pdf18 Jan 2020
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Avalon Ph 1 Type G.pdf18 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: AVALON PH1 AND PH2-2.pdf30 Oct 2019
Certificates of CA (Form 5)File: FROM 5 - AVALON D TO H.pdf30 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: avalon g.pdf30 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Avalon D E - 28 floors.pdf19 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: AvalonHCC30thslab.pdf19 Oct 2019
Details of encumbrancesFile: encumberrance update _ Avalon_1.pdf25 Apr 2019
Certificates of CA (Form 5)File: Montana Phase-1.pdf22 Oct 2018
Certificates of CA (Form 5)File: Sheth Avalon1.pdf22 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: AVALON CC 1.pdf23 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: AVALON CC 2.pdf23 Mar 2018
Building plan approvalFile: 004 - LOI AVALON.PDF25 Jul 2017
Layout approvalFile: APPROVED PLAN - LAYOUT.pdf25 Jul 2017
Copy of the legal title reportFile: Final Report on Title of Avalon 2.PDF25 Jul 2017
Copy of the legal title reportFile: Final Report on Title for Avalon.pdf25 Jul 2017
Details of encumbrancesFile: 003 Details of Encurmbrances - 201 avalon.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: APPROVED PLAN - LAYOUT.pdf25 Jul 2017
Building Plan Approval (IOD)File: 004 - LOI AVALON.PDF25 Jul 2017
Declaration in FORM BFile: Form B - Avalon.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch cert - avalon.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng cert avalon.pdf25 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE AVALONOP.pdf25 Jul 2017
Proforma of Allotment letterFile: RERA Agreement avalon.pdf25 Jul 2017
Proforma of Allotment letterFile: RERA Allotment letter-avalon.pdf25 Jul 2017
PAN CardFile: pan SDPL PAN CARD_NEW.pdf10 Jul 2017

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise7 delivered late1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHETH BLUE IVYP51800001407DINDOSHI MALAD, Mumbai Suburban66Jul 2017OngoingNov 2027Registered original: Jun 2023Not due yet
SIGMAZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI - 25260-CompletedJul 2014Late, Dec 2014
VIVIANA MALLViviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601240-CompletedMay 2013May 2013
Vasant LawnsVasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601465-CompletedMar 2012Late, Nov 2013
VASANT MARVELWESTRN EXPRESS HIGHWAY BORIWALI EAST MUMBAI - 66641-CompletedOct 2011Late, Jul 2012
CNERGYAPPASAHEB MARATHE MARG PRABHADEVI MUMBAI 2533-CompletedSep 2011Sep 2011
BEAUMONDEAPPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25196-CompletedJul 2011Late, Jan 2012
VASANT GALAXYJUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI803-CompletedOct 2010Late, Mar 2011
VASANT VALLEYMALAD EAST MUMBAI 96127-CompletedJun 2010Late, Dec 2010
VASANT GARDENSWAPNA NAGARI OFF LBS MARG MULUND WEST MUMBAI 801,825-CompletedMar 2007Late, Dec 2007

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHETH AVALON - PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAJIWADA7,600+ in Thane

2 kmSHETH AVALON - PHASE 1Completed 160Lapsed / revoked 72Other 184Dot size: filed unitsN

Filed coordinates, straight-line distance. 416 registered projects within 2 km.

Builder: Sheth Developers Private Limited

Sheth Developers Private Limited has 10 registrations on MahaRERA, including VASANT FIONA and CLARION. Its filings disclose 11 earlier MahaRERA projects: declares 2 of 9 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHETH AVALON - PHASE 1 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHETH AVALON - PHASE 1?

The registered promoter entity is Sheth Developers Private Limited, a company as per the filing. Its CIN U45200MH1993PTC070335 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHETH AVALON - PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHETH AVALON - PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHETH AVALON - PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHETH AVALON - PHASE 1?

The professionals named in the filing: Architect: ANIL JAGWANI; Engineer: RAMBOLL INDIA PRIVATE LIMITED. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHETH AVALON - PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHETH AVALON - PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHETH AVALON - PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.