SHERA GREEN RESIDENCY
RG-MH-03348 · RERA P52900021009 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 69 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHERA GREEN RESIDENCY is a Residential / Group Housing project by M/S GS BUILDCON in Sindhudurg, Maharashtra, registered with MahaRERA as P52900021009 on 27 May 2019. Possession is promised by 31 Dec 2028. The completion date has moved by 69 months from the original filing. 0 of the 54 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.
At a glance
Project
- NameSHERA GREEN RESIDENCY
- TypeResidential / Group Housing
- Location
- MATHEWADA
- MASTAN MARG ZIRANG
- Bhom
- Sawantwadi
- Sindhudurg
- 416510
- Pincode416510
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900021009
- ReraGenie IDRG-MH-03348
Builder
- NameM/S GS BUILDCON
- Entity typePartnership
- GSTIN30ABVFM3968P1ZC
- PartnersSayed Zaheer Abbas, Gaurav Sadanand Pal Dukle
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 May 2019
- Promised completion31 Dec 2028
- Revised completionRevised to 31 Dec 2028 (originally 30 Mar 2023)
- Buildings2 building records
- Documents filed68 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHERA GREEN RESIDENCY BUILDING A | NA | 5 | 4 | 24 | 0 | 24 |
| SHERA GREEN RESIDENCY BUILDING B | NA | 5 | 4 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 80%.
SHERA GREEN RESIDENCY BUILDING A36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 12% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SHERA GREEN RESIDENCY BUILDING B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SHERA GREEN RESIDENCY BUILDING A | 1 | 1 | 2 |
| SHERA GREEN RESIDENCY BUILDING B | 0 | 3 | 3 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHERA GREEN RESIDENCY BUILDING A | NA | Rs 5.82 cr | Rs 2.53 cr |
| SHERA GREEN RESIDENCY BUILDING B | NA | Rs 4.65 cr | - |
| - | NA | Rs 60.00 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIJAY NEPOLIAN KAMAT |
| Engineer | VIJAY NEPOLIAN KAMAT |
| Chartered Accountant | SANJAY PATEL |
| Chartered Accountant | Sachin K Mishra |
| Chartered Accountant | R H Pothiwal & Associates |
| Partner | Role in project |
|---|---|
| M/S GS BUILDCON | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid and Labour shortage
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate_Mar 26.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Mar 26.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: CA Certificate_Mar 26.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form-3.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form-3.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form-3.pdf | 19 Mar 2026 |
| Certificates of CA (Form 3)File: F Y 2019-20.pdf | 9 May 2023 |
| Certificates of CA (Form 3)File: F Y 2020-21.pdf | 9 May 2023 |
| Certificates of CA (Form 3)File: F Y 2021-22 Final.pdf | 9 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate 5.pdf | 9 May 2023 |
| Certificates of CA (Form 3)File: F Y 2019-20.pdf | 4 May 2023 |
| Certificates of CA (Form 3)File: F Y 2020-21.pdf | 4 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: F Y 2019-20.pdf | 4 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: F Y 2020-21.pdf | 4 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 15.pdf | 3 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 (11).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (1).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (2).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (3).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (4).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (5).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (6).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (7).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (8).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (9).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (10).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (11).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (12).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (13).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (14).pdf | 3 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 (15).pdf | 3 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Shera QAC 2019-20_compressed.pdf | 3 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shera QAC 2020-21_compressed.pdf | 3 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Shera QAC 2021-22_compressed.pdf | 3 May 2023 |
| Building plan approvalFile: Layout.pdf | 16 May 2019 |
| Layout approvalFile: site plan.pdf | 16 May 2019 |
| PAN CardFile: pancard.pdf | 16 May 2019 |
| Copy of the legal title reportFile: zppd_land_title_search_report.pdf | 16 May 2019 |
| Details of encumbrancesFile: NIL ENCUMBRANCE.pdf | 16 May 2019 |
| Copy of Layout Approval (in case of layout)File: site plan.pdf | 16 May 2019 |
| Building Plan Approval (IOD)File: Layout.pdf | 16 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: zppd_commencement_cerificates.pdf | 16 May 2019 |
| Declaration in FORM BFile: zppd_FORM_B.pdf | 16 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: zppd_Architects_certificates.pdf | 16 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: zppd_Engineer_certificates.pdf | 16 May 2019 |
| Certificates of CA (Form 3)File: zppd_CA_certificates.pdf | 16 May 2019 |
| Proforma of Allotment letterFile: ATS AND Allotment.pdf | 16 May 2019 |
| OtherFile: Partnership Deed.pdf | 16 May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHERA GREEN RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MASTAN MARG ZIRANG530+ in Sindhudurg
Filed coordinates, straight-line distance. 51 registered projects within 2 km.
perto de goa phase R 1
ANKIT VASTU CREATIONS PRIVATE LIMITED
ASHTVINAYAK GRUHSANKUL
MR PANKAJ ROHIDAS NARVEKAR
SAWANTWADI ENCLAVE
LANDKRAFT SPACES PRIVATE LIMITED
APNA GHAR
VYANKATESH VASANT DESHPANDE
Riviera Suites
Home and Soul Developers Private Limited
HERITAGE HOMES
HERITAGE REALTORS
See every Sindhudurg project, with the district possession charts
Builder: M/S GS BUILDCON
M/S GS BUILDCON has 1 registration on MahaRERA, including SHERA GREEN RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if SHERA GREEN RESIDENCY is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHERA GREEN RESIDENCY?
The registered promoter entity is M/S GS BUILDCON, a partnership as per the filing. Its GSTIN 30ABVFM3968P1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHERA GREEN RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHERA GREEN RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHERA GREEN RESIDENCY?
The professionals named in the filing: Architect: VIJAY NEPOLIAN KAMAT; Engineer: VIJAY NEPOLIAN KAMAT; Chartered Accountant: SANJAY PATEL; Chartered Accountant: Sachin K Mishra; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHERA GREEN RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback