Home / Browse projects / Mumbai Suburban, Maharashtra / Sheetal Sahyog
Sheetal Sahyog
By D G S TOWNSHIP PRIVATE LIMITED
RG-MH-07554 · RERA P51800054809 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sheetal Sahyog is a Others project by D G S TOWNSHIP PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054809 on 12 Feb 2024. Possession is promised by 30 Jun 2027. 64 of the 211 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameSheetal Sahyog
- TypeOthers
- Location
- P-N Ward Kranti Nagar
- Opposite Police Chowki
- Kurar Malad (E)
- Kurar
- Borivali
- Mumbai Suburban
- 400097
- Pincode400097
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800054809
- ReraGenie IDRG-MH-07554
Builder
- NameD G S TOWNSHIP PRIVATE LIMITED
- Entity typeCompany
- CINU74120MH2014PTC254452
- GSTIN27AAECD9891R1ZJ
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsISHWARDEV DUDHNATH SHUKLA, SURAJDEV DUDHNATH SHUKLA, INDRADEV DUDHNATH SHUKLA, ROHIT SURAJDEV SHUKLA
- Other registrations5 more →
- Completed1 of 6
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Feb 2024
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings2 building records
- Documents filed117 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sheetal Sahyog A Wing | NA | 26 | 26 | 101 | 0 | 101 |
| Sheetal Sahyog B Wing | NA | 7 | 7 | 110 | 0 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 18%.
Sheetal Sahyog A Wing29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 18% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Sheetal Sahyog B Wing29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 18% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Sheetal Sahyog A Wing | 23 | 23 |
| Sheetal Sahyog B Wing | 23 | 23 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sahyog S R A Co Operative Housing Society | Kurar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sheetal Sahyog A Wing | NA | Rs 51.19 cr | Rs 34.76 cr |
| Sheetal Sahyog B Wing | NA | Rs 51.19 cr | Rs 34.76 cr |
| - | NA | Rs 51.19 cr | Rs 34.76 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Arch View Associates |
| Engineer | Saroj Vishwakarma vishwakarma |
| Chartered Accountant | SDBA & Company |
| Partner | Role in project |
|---|---|
| D G S TOWNSHIP PRIVATE LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1623/2023/2023 | SUPREME COURT OF INDIA | ONGOING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Aug 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Aug 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 SAHAYOG MARCH 2026 DT 05-05-2026 (1).pdf | 27 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Sahyog March 26.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: SAHYOG_FORM 3_MARCH 2026.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM 1 SAHAYOG DEC 2025 DT 07-01-2026 (1).pdf | 9 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Sahyog - Dec 25.pdf | 9 May 2026 |
| Withdrawal Update Form 3File: Form-3 DEC-25.pdf | 9 May 2026 |
| Form 5 (FY 2024-2025)File: Sheetal sahyog form 5 F Y-24-25_0001 (2).pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 sep.pdf | 18 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1 sep.pdf | 18 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 Sep.pdf | 18 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 Sep.pdf | 18 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 sep.pdf | 18 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 sep.pdf | 18 Nov 2025 |
| Withdrawal Update Form 1File: Sahyog Form 1 June 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: Sahyog Form 1 June 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 -March-24.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 -March-24.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: DGS_SAHYOG_FORM 3_JUN 25_0001.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: DGS_SAHYOG_FORM 3_JUN 25_0001.pdf | 13 Nov 2025 |
| Layout approvalFile: plan - 01.pdf | 23 Aug 2025 |
| Layout approvalFile: plan - 02.pdf | 23 Aug 2025 |
| Layout approvalFile: plan - 03.pdf | 23 Aug 2025 |
| Layout approvalFile: plan - 04.pdf | 23 Aug 2025 |
| Layout approvalFile: Plan - 05.pdf | 23 Aug 2025 |
| Layout approvalFile: Plan - 06.pdf | 23 Aug 2025 |
| Layout approvalFile: Plan - 07.pdf | 23 Aug 2025 |
| Layout approvalFile: Plan - 08.pdf | 23 Aug 2025 |
| Building plan approvalFile: plan - 01.pdf | 23 Aug 2025 |
| Building plan approvalFile: plan - 02.pdf | 23 Aug 2025 |
| Building plan approvalFile: plan - 03.pdf | 23 Aug 2025 |
| Building plan approvalFile: plan - 04.pdf | 23 Aug 2025 |
| Building plan approvalFile: Plan - 05.pdf | 23 Aug 2025 |
| Building plan approvalFile: Plan - 06.pdf | 23 Aug 2025 |
| Building plan approvalFile: Plan - 07.pdf | 23 Aug 2025 |
| Building plan approvalFile: Plan - 08.pdf | 23 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sheetal sahyog-form- 3.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- Dec-24.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHEETAL SAHYOG ENGINEER CERTIFICATE_0001.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHEETAL SAHYOG ENGINEER CERTIFICATE_0001.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHEETAL SAHYOG ENGINEER CERTIFICATE_0001.pdf | 1 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahyog Form 2 Sept 24.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahyog Form 2 Sept 24.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sahyog Form 2 Sept 24.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sheetal sahyog-24_compressed.pdf | 19 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sheetal sahyog-24_compressed.pdf | 19 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sheetal sahyog-24_compressed.pdf | 19 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sheetal sahyog-24_compressed.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Architect cert).pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Architect cert).pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Architect cert).pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf | 14 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1(Architect)-QPR-2.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1(Architect)-QPR-2.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1(Architect)-QPR-2.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(Architect)-QPR-2.pdf | 18 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A -fy-23-24.pdf | 12 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DGS Township form 5 S Sahyog.pdf | 4 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shayog -QPR-1.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -March-24.pdf | 18 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sahyog Form 1-QPR-1.pdf | 6 Jun 2024 |
| Declaration about Commencement CertificateFile: declaration about comm cert.pdf | 2 Feb 2024 |
| Other - TechnicalFile: DOC (1).pdf | 30 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations (7)_1 (4 files merged.pdf | 27 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No encumbrances legal.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to LegalFile: No encumbrances legal.pdf | 23 Jan 2024 |
| Other - TechnicalFile: amanity.pdf | 23 Jan 2024 |
| Other - TechnicalFile: sahyog plan area.pdf | 23 Jan 2024 |
| Other - TechnicalFile: sheetal mail sc.pdf | 23 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_1.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_2.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_3.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_4.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_5.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_6.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_7.pdf | 13 Jan 2024 |
| Layout approvalFile: Sale IOA 26 Floor_8.pdf | 13 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sheetal Sahyog on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kurar Malad (E)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 218 registered projects within 2 km.
Alta Monte and Signet
ERA REALTORS PRIVATE LIMITED
MAULI OMKAR
MAULI SAI DEVELOPERS PVT LTD
HIVE 97
AMITY CONSTRUCTIONS
MAULI PRIDE
MAULI SAI DEVELOPERS PVT LTD
Aarambh Phase III by group Satellite
Satellite Developers Private Limited
Sethia Imperial Avenue
Sai Enterprises
See every Mumbai Suburban project, with the district possession charts
Builder: D G S TOWNSHIP PRIVATE LIMITED
D.G.S TOWNSHIP PRIVATE LIMITED has 6 registrations on MahaRERA, including SHEETAL VAIBHAV and SHEETAL SONA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Sheetal Sahyog is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sheetal Sahyog?
The registered promoter entity is D G S TOWNSHIP PRIVATE LIMITED, a company as per the filing. Its CIN U74120MH2014PTC254452 and GSTIN 27AAECD9891R1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sheetal Sahyog?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sheetal Sahyog?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sheetal Sahyog?
The professionals named in the filing: Architect: Arch View Associates; Engineer: Saroj Vishwakarma vishwakarma; Chartered Accountant: SDBA & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sheetal Sahyog?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback