Home / Browse projects / Pune, Maharashtra / SHAVIRA RESIDENCY
SHAVIRA RESIDENCY
RG-MH-48119 · RERA P52100046402 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHAVIRA RESIDENCY is a Residential / Group Housing project by SHAVIRA DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100046402 on 22 Jun 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 56 of the 72 units on this registration are recorded sold or booked, and 26 of 44 construction stages are filed complete.
At a glance
Project
- NameSHAVIRA RESIDENCY
- TypeResidential / Group Housing
- Location
- S NO 62/1/2
- PLOT NO 3
- 4
- 5
- 6
- 9 AND 10 TALUKA HAVELI
- PIMPLE NILAKH
- Pune (M Corp.)
- Pune City
- Pune
- 411027
- Pincode411027
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046402
- ReraGenie IDRG-MH-48119
Builder
- NameSHAVIRA DEVELOPERS LLP
- Entity typePartnership
- PartnerKRISHNA RAJESH MEHTA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on22 Jun 2022
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
- Buildings4 building records
- Documents filed95 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 0 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 7 | 6 | 24 | 0 | 24 |
| BUILDING C | NA | 7 | 6 | 24 | 0 | 24 |
| BUILDING D | NA | 6 | 6 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
26 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 85%.
BUILDING A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 65% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING B | 32 | 32 |
| BUILDING C | 18 | 18 |
| BUILDING D | 18 | 18 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING C | NA | Rs 4.59 cr | Rs 4.59 cr |
| BUILDING D | NA | Rs 4.59 cr | Rs 4.59 cr |
| BUILDING B | NA | Rs 4.31 cr | Rs 3.81 cr |
| - | NA | Rs 1.42 cr | Rs 85.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHAILENDRA GHORPADE AND ASSOCIATES |
| Engineer | PRAKASH BADWE |
| Chartered Accountant | ANIRUDDHA SURESH RATHI |
| Chartered Accountant | SAIDEEP SHANKARRAO DHOBLEPATIL |
| Partner | Role in project |
|---|---|
| SHAVIRA DEVELOPERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe had received a revised sanction of the project. In Earlier Plan we have total 4 buildings. And now as per revised plan total number of buildings are 3 buildings. In Revised Plan Building A has been cancelled and 3 floors are added in Building B. Thus we are applying for Extension of 6 Months i.e. 30/06/2026. We have already started a construction work of upper 3 floors and we have also completed a 50% of the same. Also, we are very much sure that we will complete a work till Dec 2025 and we will get a completion certificate till March 2026. But we are demanding an extension till June 2026 f
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1 certificate - Shavira - Mar 2026.pdf | 30 May 2026 |
| Withdrawal Update Form 2File: form 2 certificate - Shavira - Mar 2026.pdf | 30 May 2026 |
| Withdrawal Update Form 3File: form 3 ca certificate - Shavira - Mar 2026.pdf | 30 May 2026 |
| Withdrawal Update Form 1File: Architects Certificate.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Engineers Certificate.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: Form 3 - December 2025.pdf | 16 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf | 16 Feb 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - 2022-2023.pdf | 16 Feb 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - 2023-2024.pdf | 16 Feb 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - 2025-2026.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 5 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 5 Jan 2026 |
| Withdrawal Update Form 1File: Arch Cert 15-10-25.pdf | 19 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf | 19 Nov 2025 |
| Withdrawal Update Form 3File: form 3 ca certificate - Shavira - Sep 2025.pdf | 19 Nov 2025 |
| Form 1File: Architects Cert 05-07-25.pdf | 23 Jul 2025 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf | 23 Jul 2025 |
| Form 3File: form 3 ca certificate - Shavira - June 2025.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloure of Sold Flats 30 June 25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 1File: Architects Cert 05-07-25.pdf | 23 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf | 23 Jul 2025 |
| Withdrawal Update Form 3File: form 3 ca certificate - Shavira - June 2024.pdf | 23 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ca certificate - Shavira - Mar 2025.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 24 Apr 2025 |
| Other - TechnicalFile: Completion Certificate.pdf | 29 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Sep 2024.pdf | 13 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 15-10-24.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Sep 2024.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Flat Disclosure.pdf | 12 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHAVIRA RESIDENCY - 2023-2024.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - June 2024.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 17-7-24.pdf | 6 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf | 6 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf | 13 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Dec 2023.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Oct-Dec 23 - Final.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Oct-Dec 23.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Diclosure of Flats Oct-Dec 23.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Sep 2023.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE - Shavira Developers LLP.pdf | 27 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf | 27 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf | 27 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Shavira Developers-2022 - 2023.pdf | 27 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 30 June 23.pdf | 12 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE - 30 June 23.pdf | 12 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate up to Mar 23_11zon.pdf | 12 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 12 May 2023 |
| Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf | 12 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of flats 31 Mar 2023.pdf | 12 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shavira Residency_11zon.pdf | 12 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 14 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE - Shavira Developers LLP.pdf | 13 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engr certificate up to 31-12-22.pdf | 13 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: engr quality certificate 31-12-22.pdf | 13 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Flats Sold_11zon.pdf | 13 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Vikrant Shah.pdf | 13 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Krishna Mehta.pdf | 13 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Disclosure of Bank Details.pdf | 13 Feb 2023 |
| Copy of the legal title reportFile: Title Certificate and Report_11zon.pdf | 17 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_11zon.pdf | 17 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CErtificate_11zon.pdf | 17 Jun 2022 |
| Proforma of Allotment letterFile: RERA_FLAT-Agreement.pdf | 17 Jun 2022 |
| Proforma of Allotment letterFile: proforma allotment letter.pdf | 17 Jun 2022 |
| Building plan approvalFile: Building A.pdf | 9 Jun 2022 |
| Building plan approvalFile: Building B.pdf | 9 Jun 2022 |
| Building plan approvalFile: Building C and D Elevation.pdf | 9 Jun 2022 |
| Building plan approvalFile: Building C and D.pdf | 9 Jun 2022 |
| Layout approvalFile: Layout Plan.pdf | 9 Jun 2022 |
| PAN CardFile: Shavira Pan.pdf | 9 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHAVIRA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIMPLE NILAKH13,700+ in Pune
Filed coordinates, straight-line distance. 234 registered projects within 2 km.
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: SHAVIRA DEVELOPERS LLP
SHAVIRA DEVELOPERS LLP has 1 registration on MahaRERA, including SHAVIRA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SHAVIRA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHAVIRA RESIDENCY is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHAVIRA RESIDENCY?
The registered promoter entity is SHAVIRA DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHAVIRA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHAVIRA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHAVIRA RESIDENCY?
The professionals named in the filing: Architect: SHAILENDRA GHORPADE AND ASSOCIATES; Engineer: PRAKASH BADWE; Chartered Accountant: ANIRUDDHA SURESH RATHI; Chartered Accountant: SAIDEEP SHANKARRAO DHOBLEPATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHAVIRA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback