Registration lapsed No litigation declared Residential / Group Housing project

SHAVIRA RESIDENCY

By SHAVIRA DEVELOPERS LLP

RG-MH-48119 · RERA P52100046402 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
26 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 85%
16 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

SHAVIRA RESIDENCY is a Residential / Group Housing project by SHAVIRA DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100046402 on 22 Jun 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 56 of the 72 units on this registration are recorded sold or booked, and 26 of 44 construction stages are filed complete.

At a glance

Project

  • NameSHAVIRA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • S NO 62/1/2
    • PLOT NO 3
    • 4
    • 5
    • 6
    • 9 AND 10 TALUKA HAVELI
    • PIMPLE NILAKH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046402
  • ReraGenie IDRG-MH-48119

Builder

  • NameSHAVIRA DEVELOPERS LLP
  • Entity typePartnership
  • PartnerKRISHNA RAJESH MEHTA

Key dates

4 months past promisethis monthRegisteredJun 2022First promiseDec 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Jun 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings4 building records
  • Documents filed95 files

Current status

78%56 of 72 units booked
92.8%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA00000
BUILDING BNA7624024
BUILDING CNA7624024
BUILDING DNA6624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 85%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes65%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68
BuildingClosed/CoveredTotal
BUILDING B3232
BUILDING C1818
BUILDING D1818

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,998 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025

Approvals and building plan

Permissible FSI5114.72
Proposed, not sanctioned5,115 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1264/1 WRANGLER PARANJPE ROAD JANGLI MAHARAJ ROAD DEECAN GYMKAHNA PUNE 411004
Estimated costRs 14.92 cr
Cost incurredRs 13.85 cr
Work done92.83%
BuildingWingEstimatedIncurred
BUILDING CNARs 4.59 crRs 4.59 cr
BUILDING DNARs 4.59 crRs 4.59 cr
BUILDING BNARs 4.31 crRs 3.81 cr
-NARs 1.42 crRs 85.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILENDRA GHORPADE AND ASSOCIATES
EngineerPRAKASH BADWE
Chartered AccountantANIRUDDHA SURESH RATHI
Chartered AccountantSAIDEEP SHANKARRAO DHOBLEPATIL
PartnerRole in project
SHAVIRA DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25072502196Dec 2025 → Jun 2026

Reason as filed by the promoterWe had received a revised sanction of the project. In Earlier Plan we have total 4 buildings. And now as per revised plan total number of buildings are 3 buildings. In Revised Plan Building A has been cancelled and 3 floors are added in Building B. Thus we are applying for Extension of 6 Months i.e. 30/06/2026. We have already started a construction work of upper 3 floors and we have also completed a 50% of the same. Also, we are very much sure that we will complete a work till Dec 2025 and we will get a completion certificate till March 2026. But we are demanding an extension till June 2026 f

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 certificate - Shavira - Mar 2026.pdf30 May 2026
Withdrawal Update Form 2File: form 2 certificate - Shavira - Mar 2026.pdf30 May 2026
Withdrawal Update Form 3File: form 3 ca certificate - Shavira - Mar 2026.pdf30 May 2026
Withdrawal Update Form 1File: Architects Certificate.pdf16 May 2026
Withdrawal Update Form 2File: Engineers Certificate.pdf16 May 2026
Withdrawal Update Form 3File: Form 3 - December 2025.pdf16 May 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024-2025.pdf16 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A - 2022-2023.pdf16 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A - 2023-2024.pdf16 Feb 2026
Form 2A (FY 2025-2026)File: Form 2A - 2025-2026.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf5 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf5 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf5 Jan 2026
Withdrawal Update Form 1File: Arch Cert 15-10-25.pdf19 Nov 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf19 Nov 2025
Withdrawal Update Form 3File: form 3 ca certificate - Shavira - Sep 2025.pdf19 Nov 2025
Form 1File: Architects Cert 05-07-25.pdf23 Jul 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf23 Jul 2025
Form 3File: form 3 ca certificate - Shavira - June 2025.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discloure of Sold Flats 30 June 25.pdf23 Jul 2025
Withdrawal Update Form 1File: Architects Cert 05-07-25.pdf23 Jul 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf23 Jul 2025
Withdrawal Update Form 3File: form 3 ca certificate - Shavira - June 2024.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 ca certificate - Shavira - Mar 2025.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf24 Apr 2025
Other - TechnicalFile: Completion Certificate.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Sep 2024.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 15-10-24.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Sep 2024.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: Flat Disclosure.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - SHAVIRA RESIDENCY - 2023-2024.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - June 2024.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert 17-7-24.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Dec 2023.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Oct-Dec 23 - Final.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Oct-Dec 23.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Diclosure of Flats Oct-Dec 23.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shavira - Sep 2023.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE - Shavira Developers LLP.pdf27 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf27 Nov 2023
Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf27 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Shavira Developers-2022 - 2023.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 30 June 23.pdf12 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE - 30 June 23.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate up to Mar 23_11zon.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: Discloure of Sold Flats.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of flats 31 Mar 2023.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shavira Residency_11zon.pdf12 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf14 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE - Shavira Developers LLP.pdf13 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engr certificate up to 31-12-22.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: engr quality certificate 31-12-22.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Flats Sold_11zon.pdf13 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Vikrant Shah.pdf13 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Krishna Mehta.pdf13 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Disclosure of Bank Details.pdf13 Feb 2023
Copy of the legal title reportFile: Title Certificate and Report_11zon.pdf17 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_11zon.pdf17 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CErtificate_11zon.pdf17 Jun 2022
Proforma of Allotment letterFile: RERA_FLAT-Agreement.pdf17 Jun 2022
Proforma of Allotment letterFile: proforma allotment letter.pdf17 Jun 2022
Building plan approvalFile: Building A.pdf9 Jun 2022
Building plan approvalFile: Building B.pdf9 Jun 2022
Building plan approvalFile: Building C and D Elevation.pdf9 Jun 2022
Building plan approvalFile: Building C and D.pdf9 Jun 2022
Layout approvalFile: Layout Plan.pdf9 Jun 2022
PAN CardFile: Shavira Pan.pdf9 Jun 2022

How this compares with Pune

78%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAVIRA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPLE NILAKH13,700+ in Pune

2 kmSHAVIRA RESIDENCYCompleted 95Lapsed / revoked 37Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: SHAVIRA DEVELOPERS LLP

SHAVIRA DEVELOPERS LLP has 1 registration on MahaRERA, including SHAVIRA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SHAVIRA RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHAVIRA RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAVIRA RESIDENCY?

The registered promoter entity is SHAVIRA DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAVIRA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAVIRA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAVIRA RESIDENCY?

The professionals named in the filing: Architect: SHAILENDRA GHORPADE AND ASSOCIATES; Engineer: PRAKASH BADWE; Chartered Accountant: ANIRUDDHA SURESH RATHI; Chartered Accountant: SAIDEEP SHANKARRAO DHOBLEPATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAVIRA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAVIRA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAVIRA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.