ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SHARDA HEIGHTS

Registered No litigation declared Others project

SHARDA HEIGHTS

By Shivshankar Singh & Others

RG-MH-31414 · RERA P51800079749 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 6%
37 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

SHARDA HEIGHTS is a Others project by Shivshankar Singh & Others in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079749 on 26 Mar 2025. Possession is promised by 31 Dec 2028. 4 of the 41 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHARDA HEIGHTS
  • TypeOthers
  • Location
    • TEMBHI PADA ROAD
    • BHANDUP WEST
    • Kanjurmarg
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800079749
  • ReraGenie IDRG-MH-31414

Builder

  • NameShivshankar Singh & Others
  • Entity typeOthers
  • GSTIN27AAAAS5080P1ZZ
  • MembersShardadevi Shivram Singh Singh, Randhir Shivram Singh Singh, Sachin Shivram Singh Singh, Shivshankar Shivram Singh Singh
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Current status

10%4 of 41 units booked
23.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sharda Heights B WingNA1816261541

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 6%.

Sharda Heights B Wing: 19% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered1
Open Space23

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area940 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jun 2025
LandownerVillageDistrict
RIYA APARTMENT CO OP HSG SOC LTDKanjurmargMumbai Suburban
SANMAN CO OP HSG SOC LTDKanjurmargMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI2532.42
Proposed, not sanctioned1,853 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSACHDEV COMPLEX,SHOP NO.12,GROUND FLOOR,AND BASEMENT,CTS NO.163,163/17 TO 89, KANJURGOAN,J.M.ROAD,BHANDUP WEST
Estimated costRs 11.95 cr
Cost incurredRs 2.75 cr
Work done22.99%
BuildingWingEstimatedIncurred
Sharda Heights B WingNARs 11.55 crRs 2.75 cr
-NARs 40.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.S. ASSOCIATES
EngineerM/s UniSteps Consulting Pvt. Ltd.
EngineerSHASHANK RATHOD
Chartered AccountantSinghvi & Sancheti
Chartered AccountantNEHAL MITUL FARIA
PartnerRole in project
Shivshankar Singh & Others-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3.pdf15 May 2026
Withdrawal Update Form 1File: FORM 1.pdf14 May 2026
Withdrawal Update Form 1File: FORM 1.pdf14 May 2026
Withdrawal Update Form 1File: FORM 1.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 S25.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 S25.pdf14 May 2026
Withdrawal Update Form 3File: Form 3 S25.pdf14 May 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf28 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf28 Oct 2025
Withdrawal Update Form 1File: FORM 1.pdf28 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf28 Oct 2025
Form 1File: FORM 1.pdf3 Sep 2025
Form 2File: FORM 2.pdf3 Sep 2025
Form 3File: FORM 3.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER OF SOLD & UNSOLD.pdf3 Sep 2025
Withdrawal Update Form 1File: Architect Certificate.pdf21 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3 Final.pdf21 Aug 2025
Layout approvalFile: Layout Plan 1.pdf19 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout Plan 1.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf19 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf19 Mar 2025
Other - FinanceFile: PAN Declaration.pdf19 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf19 Mar 2025
PAN CardFile: New PAN.pdf17 Mar 2025
Copy of the legal title reportFile: Revised Title Certificate - 1.pdf8 Mar 2025
Copy of the legal title reportFile: Revised Title Certificate - 2.pdf8 Mar 2025
Proforma of Agreement for saleFile: AFS Edited.pdf8 Mar 2025
Layout approvalFile: Layout Plan 1.pdf25 Jan 2025
Building plan approvalFile: Building Plan 1.pdf25 Jan 2025
Building plan approvalFile: Building Plan 2.pdf25 Jan 2025
Building plan approvalFile: Building Plan 3.pdf25 Jan 2025
Building plan approvalFile: Building Plan 4.pdf25 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout Plan 1.pdf25 Jan 2025
Proforma of Allotment letterFile: Alottment Letter.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf25 Jan 2025
Other - TechnicalFile: Annex A.pdf15 Jan 2025
Other - TechnicalFile: New PAN.pdf8 Jan 2025
Other - LegalFile: Clarification Letter with anx.pdf7 Jan 2025
Other - LegalFile: Form B - Developer.pdf7 Jan 2025
Other - LegalFile: Declaration for Commencement Certificate.pdf7 Jan 2025
Other - LegalFile: Form B - Riya Soc sanman poa.pdf7 Jan 2025
Other - LegalFile: Declaration of no encumbrances - Legal.pdf7 Jan 2025
Other - TechnicalFile: Declaration No Deviation Report for Agreement.pdf7 Jan 2025
Other - TechnicalFile: Declaration No Deviation for Allotment Letter.pdf7 Jan 2025
Details of encumbrances concerned to FinanceFile: Declaration of no encumbrances - Financial.pdf4 Jan 2025
CERSAI detailsFile: Declaration Cersai Report.pdf4 Jan 2025
Details of encumbrances concerned to LegalFile: Declaration of no encumbrances - Financial.pdf4 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Declaration - Secured Unsecured Finance.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf5 Dec 2024
Declaration in FORM BFile: FORM B.pdf3 Dec 2024

How this compares with Mumbai Suburban

10%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHARDA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHANDUP WEST6,700+ in Mumbai Suburban

2 kmSHARDA HEIGHTSCompleted 45Lapsed / revoked 22Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: Shivshankar Singh & Others

Shivshankar Singh & Others has 5 registrations on MahaRERA, including Gaodevi Krupa Darshan SRA CHS Ltd and Vaikunth Dham CHS Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHARDA HEIGHTS is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHARDA HEIGHTS?

The registered promoter entity is Shivshankar Singh & Others, an others as per the filing. Its GSTIN 27AAAAS5080P1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHARDA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHARDA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHARDA HEIGHTS?

The professionals named in the filing: Architect: S.S. ASSOCIATES; Engineer: M/s UniSteps Consulting Pvt. Ltd.; Engineer: SHASHANK RATHOD; Chartered Accountant: Singhvi & Sancheti; Chartered Accountant: NEHAL MITUL FARIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHARDA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHARDA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHARDA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.