Home / Browse projects / SHANTI HARBOUR CREST

Registered No litigation declared Residential / Group Housing project

SHANTI HARBOUR CREST

By OJUS DEVELOPERS

RG-MH-28880 · RERA P51900027180 · Last updated on MahaRERA portal: 18 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2028Possession promisedmoved 54 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 45%
5 of 39Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

SHANTI HARBOUR CREST is a Residential / Group Housing project by OJUS DEVELOPERS in SEWRI, 400015, registered with MahaRERA as P51900027180 on 24 Nov 2020. Possession is promised by 30 Jun 2028. The completion date has moved by 54 months from the original filing. 34 of the 39 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHANTI HARBOUR CREST
  • TypeResidential / Group Housing
  • Location
    • ACHARYA DONDE MARG
    • SEWRI
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900027180
  • ReraGenie IDRG-MH-28880

Builder

  • NameOJUS DEVELOPERS
  • Entity typePartnership
  • PartnersPARAS SHANTILAL PORWAL, CHANDRAKANT TULASHIRAM MOJAD
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2020First promiseDec 2023Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Nov 2020
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed94 files

Current status

87%34 of 39 units booked
38.6%Work done, per cost certificate

Figures as on 18 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHANTI HARBOUR CRESTNA222239039

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 45%.

SHANTI HARBOUR CREST: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered9
Open Space3

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area988 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI2855.31
Proposed, not sanctioned1,026 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPAREL MUMBAI 400012
Estimated costRs 23.29 cr
Cost incurredRs 8.98 cr
Work done38.57%
BuildingWingEstimatedIncurred
SHANTI HARBOUR CRESTNARs 22.45 crRs 8.98 cr
-NARs 83.29 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS CHANDRASHEKHAR
EngineerSANTOSH GUPTE
EngineerSurabh Construction
Chartered AccountantR V B & Associates
Chartered AccountantSandeep Shridhar & Associates
Chartered AccountantSarawgi Shridhar & Assciates
PartnerRole in project
OJUS DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900019372Dec 2023 → Jun 2026

Reason as filed by the promoter•The real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch slowing down growth. •We have been grappled with shortage of labour and a demand slump challenges triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. •Due to unavailability of skilled labour and labour migration issues, project is affected a lot. Even contractors are asking us to allow them more time due to labour issues. •The geopolitical tension around the globe has led to ris

EA18082622176Dec 2023 → Jun 2028

Reason as filed by the promoterAs mentioned in FORM E

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12606428Vishal Harishchandra NadkarOJUS DEVELOPERS02/10/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: Form 5_SH FY 22-23 with Annexure.pdf18 Aug 2026
Form 5 (FY 2023-2024)File: Form-5_ 2023-24_merged.pdf18 Aug 2026
Form 5 (FY 2024-2025)File: Form-5_ 2024-25_merged.pdf18 Aug 2026
Form 5 (FY 2025-2026)File: Form-5_ 2025-26_merged.pdf18 Aug 2026
Form 5 (FY 2021-2022)File: Form 5_SH FY 21-22 with Annexure.pdf14 Aug 2026
Form 2A (FY 2021-2022)File: Form 2A_FY 21-22.pdf12 Aug 2026
Form 2A (FY 2022-2023)File: Form 2A_FY 22-23.pdf12 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A_FY 23-24_11zon.pdf12 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A_FY 24-25_11zon.pdf12 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A_FY 25-26_11zon.pdf12 Aug 2026
Withdrawal Update Form 1File: FORM-1-Q1-2025-26-SIGNED.pdf3 Aug 2026
Withdrawal Update Form 1File: FORM-1-Q2-2025-26-signed.pdf3 Aug 2026
Withdrawal Update Form 1File: FORM-1-Q3-2025-26-signed.pdf3 Aug 2026
Withdrawal Update Form 1File: FORM-1-Q4-2025-26-signed.pdf3 Aug 2026
Withdrawal Update Form 1File: FORM-1-Q1-2026-27-signed.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM-2-Q1-2025-26- SIGNED.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM-2-Q2-2025-26-Signed.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM-2-Q3-2025-26-Signed.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM-2-Q4-2025-26-Signed.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM 2_Q1-FY 2026-27.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3_Jun 25_SH.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3_Sep 25_SH.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3_Dec 25_SH.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3_Mar 26_SH.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3_JUNE 26_SH-1.pdf3 Aug 2026
Form 1File: FORM 1- SHC- Q1( 24-25.pdf19 Jun 2026
Form 2File: FORM 2 - SHC -4-4-2024.pdf19 Jun 2026
Form 3File: Form 3_Q1_FY 2024-25.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Decl.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Decl.pdf19 Jun 2026
Form 1File: FORM 1-SHC- Q2(24-25).pdf19 Jun 2026
Form 2File: FROM 2- SHC - Q2 ( FY 24-25) .pdf19 Jun 2026
Form 3File: Form 3_Q2_FY 2024-25.pdf19 Jun 2026
Form 1File: FORM 1 -SHC-Q3( 24-25).pdf19 Jun 2026
Form 2File: FROM 2- SHC - Q2 ( FY 24-25) .pdf19 Jun 2026
Form 3File: Form 3_Q3_FY 2024-25.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf19 Jun 2026
Form 1File: FORM 1-SHC-Q4 (24-25).pdf19 Jun 2026
Form 2File: FORM 2-SHC-Q4( 24-25).pdf19 Jun 2026
Form 3File: Form 3_Q4_FY 2024-25.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold.pdf19 Jun 2026
Details of encumbrances concerned to FinanceFile: Non-Encumbrance concerned to Legal and Finance.pdf3 Feb 2025
CERSAI detailsFile: Asset Based Declaration.pdf3 Feb 2025
CERSAI detailsFile: Debtor Based Declaration.pdf3 Feb 2025
Details of encumbrances concerned to LegalFile: Non-Encumbrance concerned to Legal and Finance.pdf3 Feb 2025
Details of encumbrances concerned to FinanceFile: Non Encumbrance concered to Legal.pdf22 Jul 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance concered to Legal.pdf22 Jul 2024
CERSAI detailsFile: Asset Based Decl.pdf22 Jul 2024
CERSAI detailsFile: Debtor based Decl.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2020.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2021.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2022.pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2023.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_2021-22.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_2022-23.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_2023-24 Q1.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_2023-24 Q2.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_2023-24 Q3.pdf26 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 21-22.pdf26 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 22-23.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_FY 21-22_compressed.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_FY 22-23_compressed.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_April 23 To July 23_compressed.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_July 23 To Sep 23_compressed.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Oct 23 To Dec 23_compressed.pdf26 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_SH FY 21-22.pdf26 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_SH FY 22-23.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng cer.pdf20 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3CASignedCertificate.pdf20 Nov 2020
OtherFile: cc ojuSletter.pdf20 Nov 2020
Layout approvalFile: Composite School-Sale IOA 20-10-20 (1).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (2).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (3).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (4).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (5).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (6).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (7).pdf13 Nov 2020
Building plan approvalFile: Composite School-Sale IOA 20-10-20 (8).pdf13 Nov 2020
PAN CardFile: Ojus_PAN_2.pdf13 Nov 2020
Copy of the legal title reportFile: titlecer.pdf13 Nov 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Prarthana GrandP51900008215M.M.G.S MARG DADAR MUMBAI1Aug 2017OngoingDec 2024Registered original: Dec 2018Not delivered

Keep SHANTI HARBOUR CREST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SEWRI

Builder: OJUS DEVELOPERS

OJUS DEVELOPERS has 2 registrations on MahaRERA, including Prarthana Grand and SHANTI HARBOUR CREST. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record.

Frequently asked questions

What are my rights if SHANTI HARBOUR CREST is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANTI HARBOUR CREST?

The registered promoter entity is OJUS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANTI HARBOUR CREST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHANTI HARBOUR CREST?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHANTI HARBOUR CREST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANTI HARBOUR CREST?

The professionals named in the filing: Architect: MS CHANDRASHEKHAR; Engineer: SANTOSH GUPTE; Engineer: Surabh Construction; Chartered Accountant: R V B & Associates; Chartered Accountant: Sandeep Shridhar & Associates; Chartered Accountant: Sarawgi Shridhar & Assciates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANTI HARBOUR CREST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANTI HARBOUR CREST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANTI HARBOUR CREST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.