RG-MH-28495 · RERA P51900026182 · Last updated on MahaRERA portal: 7 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 11 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
- Rs 470.00 crore secured on the land, in favour of BEACON TRUSTEESHIP LIMITED
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3 is a Residential / Group Housing project by COVENTRY PROPERTIES PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900026182 on 27 Aug 2020. Possession is promised by 1 Jul 2028. The completion date has moved by 36 months from the original filing. 152 of the 152 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 11 complaints are on record with the regulator.
At a glance
Project
- NameTHE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3
- TypeResidential / Group Housing
- Location
- D. G. MAHAJANI MARG
- MUMBAI
- Mumbai City
- 400015
- Pincode400015
- RERA no.P51900026182
- ReraGenie IDRG-MH-28495
Builder
- NameCOVENTRY PROPERTIES PRIVATE LIMITED
- Entity typeCompany
- DirectorGagan Sharma
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Aug 2020
- Promised completion1 Jul 2028
- Revised completionRevised to 1 Jul 2028 (originally 1 Jul 2025)
- Buildings1 building record
- Documents filed179 files
Current status
Figures as on 7 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| THE CANVAS RESIDENCES -CANVAS 1, CANVAS 2, CANVAS 3 | NA | 31 | 31 | 152 | 0 | 152 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 66%.
THE CANVAS RESIDENCES -CANVAS 1, CANVAS 2, CANVAS 3: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 66% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 24% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed241
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AAK Associates |
| Chartered Accountant | BR Nagda & Co |
| Chartered Accountant | Harshad Doshi & Co. |
| Partner | Role in project |
|---|---|
| COVENTRY PROPERTIES PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTThe impact of the lockdown resulted in severe restrictions on mobility, lack of availability of requisite building materials and non-availability of skilled labour which had already impacted the pace of the ongoing construction of the project ‘THE CANVAS RESIDENCIES - Canvas 1 Canvas 2 and Canvas 3’, causing an unavoidable delay in date Commencement of construction. Further, financial hardship occurred due to lack of response from the prospective buyers also impacted the overall construction progress of the project. Based on the present progress of the project, the project will be completed b
Reason as filed by the promoterThe project was registered with MahaRERA on 27/08/2020. As the Construction Industry is dependent on availability of labours and construction material. Any impact on labour and construction materials affects the progress of entire industry. In view of the war that has broken out between Iran, United States of America and Middle East, the import of construction related material, crude oil and gases etc. has been gravely impacted. The production of tiles and glasses is severally impacted due to the shortage of the gases required for manufacturing. Even due to the shortage of diesel the transport
Complaints filed with MahaRERA11
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400063 | Bhargao Shelar | COVENTRY PROPERTIES PRIVATE LIMITED | 09/09/2024 |
| CC12500207 | Varsha Avinash Shinde | COVENTRY PROPERTIES PRIVATE LIMITED | 21/01/2025 |
| CC12500715 | TANMAY MADAN THAKUR | COVENTRY PROPERTIES PRIVATE LIMITED | 01/03/2025 |
| CC12502021 | IIFL Home Finance | COVENTRY PROPERTIES PRIVATE LIMITED | 20/06/2025 |
| CC12503658 | Regan Homavazir | COVENTRY PROPERTIES PRIVATE LIMITED | 14/10/2025 |
| CC12503659 | Regan Homavazir | COVENTRY PROPERTIES PRIVATE LIMITED | 14/10/2025 |
| CC12504205 | COVENTRY PROPERTIES PRIVATE LIMITED | Satish Vilas Mane | 28/11/2025 |
| CC12601764 | COVENTRY PROPERTIES PRIVATE LIMITED | Mohammad Farooque Khan | 27/03/2026 |
| CC12601874 | COVENTRY PROPERTIES PRIVATE LIMITED | MOHAMMAD FAROOQUE KHAN | 30/03/2026 |
| CC12604501 | Girish Ranchhoddas Brahmbhatt | COVENTRY PROPERTIES PRIVATE LIMITED | 18/07/2026 |
| CC12606195 | SHRUSHTI AGARWAL | COVENTRY PROPERTIES PRIVATE LIMITED | 23/09/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Jul 2028
Documents filed179
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: 202503 Form 5 The Canvas.pdf | 7 Aug 2026 |
| Form 5 (FY 2023-2024)File: 202403 Form 5 The Canvas.pdf | 3 Aug 2026 |
| Form 3File: Canvas form 3 March 2026.pdf | 18 Jun 2026 |
| Form 1File: Form 1 - Canvas - FY25 - Q4.pdf | 18 Jun 2026 |
| Form 2File: Form 2 - Canvas - Sale - FY25-26 Q4.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Coventry-Disclosure of Inventory-31-March-2026.pdf | 18 Jun 2026 |
| Form 1File: Form 1 - Canvas - FY25 - Q4.pdf | 18 Jun 2026 |
| Form 2File: Form 2 - Canvas - Sale - FY25-26 Q4.pdf | 18 Jun 2026 |
| Form 3File: Canvas form 3 March 2026.pdf | 18 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Coventry-Disclosure of Inventory-31-March-2026.pdf | 18 Jun 2026 |
| Form 1File: Architect Certifcate Form 1 Plot A 2025.pdf | 10 Jun 2026 |
| Form 2File: Form 2 25 Sale.pdf | 10 Jun 2026 |
| Form 3File: Form 3 Canvas Mar 2025.pdf | 10 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Coventry Disclosure of Inventory 2025.pdf | 10 Jun 2026 |
| Form 1File: Architect Certifcate Form 1 01 07 2025.pdf | 10 Jun 2026 |
| Form 2File: 2025 Coventry Engineer Certificate Form 2 Sales.pdf | 10 Jun 2026 |
| Form 3File: Form 3 Canvas June 2025.pdf | 10 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Coventry Disclosure of Inventory June 2025.pdf | 10 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2024.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2024.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2024.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SEPTEMBER-2024.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DECEMBER -2024.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 2024.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Sept 24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Dec 24.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2024.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2024.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2024.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SEPTEMBER-2024.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DECEMBER -2024.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 2024.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Sept 24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Dec 24.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2024.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 2024.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2024.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2024.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Sept 24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Dec 24.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SEPTEMBER-2024.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DECEMBER -2024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Canvas.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Canvas.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate 2A - Coventry- Sales (Plot A) - Jun 24 R.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 Canvas.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A Canvas.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Canvas disclosure of inventory march 24.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory June 24.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Annual Certificate -Mar 2023.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Mar 2024.pdf | 10 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Jun 2024.pdf | 10 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Mar 2024.pdf | 10 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Jun 2024.pdf | 10 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Mar 2024.pdf | 10 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate June 2024.pdf | 10 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Annual Certificate -Mar 2022.pdf | 10 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Certificate -Mar 2023.pdf | 10 Aug 2024 |
| Declaration in FORM BFile: Form B Coventry Extension.pdf | 9 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 Canvas 1 2 3 Form 3.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Jun 2023.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Mar 2023.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Sept 2023.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Mar 2023.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate June 2023.pdf | 4 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Mar 2023.pdf | 4 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2023.pdf | 4 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2022.pdf | 4 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2022.pdf | 4 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate June 2023.pdf | 4 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Mar 2023.pdf | 4 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2023.pdf | 4 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 Canvas Form 3.pdf | 28 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas 1Form 3.pdf | 11 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas 1Form 3.pdf | 21 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas Form 3 Oct 2023.pdf | 21 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas Form 3 Sep 2023.pdf | 21 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 179 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MUMBAI780+ in Mumbai City
The Gateway
LH Residential Housing Private Limited
Lodha Sewri Project
Lodha Developers Limited
SOBHA Inizio
SOBHA LIMITED
Avenue 15
Ramesh Barrel Supplying Co
AQUA BAY
CHAMUNDA INFRASTRUCTURE LIMITED
The Royal Oaks Residency
MIGHTY OAKS CONSTRUCTIONS LLP
See every Mumbai City project, with the district possession charts
Builder: COVENTRY PROPERTIES PRIVATE LIMITED
COVENTRY PROPERTIES PRIVATE LIMITED has 1 registration on MahaRERA, including THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3 is delayed beyond 1 Jul 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?
The registered promoter entity is COVENTRY PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?
The professionals named in the filing: Architect: AAK Associates; Chartered Accountant: BR Nagda & Co; Chartered Accountant: Harshad Doshi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback