Home / Browse projects / Mumbai City, Maharashtra / THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3

Registered No litigation declared Residential / Group Housing project

THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3

By COVENTRY PROPERTIES PRIVATE LIMITED

RG-MH-28495 · RERA P51900026182 · Last updated on MahaRERA portal: 7 Aug 2026

Source: official MahaRERA filing

Red flags

  • 11 complaints at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken
  • Rs 470.00 crore secured on the land, in favour of BEACON TRUSTEESHIP LIMITED

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedmoved 36 months from the original
3 of 11Construction stages donefurthest along: Podiums (if any), 66%
0 of 152Units unsoldnot recorded sold or booked
11Complaints at MahaRERAon this registration
Jump to the 179 documents Report an error

THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3 is a Residential / Group Housing project by COVENTRY PROPERTIES PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900026182 on 27 Aug 2020. Possession is promised by 1 Jul 2028. The completion date has moved by 36 months from the original filing. 152 of the 152 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 11 complaints are on record with the regulator.

At a glance

Project

  • NameTHE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3
  • TypeResidential / Group Housing
  • Location
    • D. G. MAHAJANI MARG
    • MUMBAI
    • Mumbai City
    • 400015
  • Pincode400015
  • RERA no.P51900026182
  • ReraGenie IDRG-MH-28495

Builder

  • NameCOVENTRY PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorGagan Sharma

Key dates

this monthRegisteredAug 2020First promiseJul 2025Revised toJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Aug 2020
  • Promised completion1 Jul 2028
  • Revised completionRevised to 1 Jul 2028 (originally 1 Jul 2025)
  • Buildings1 building record
  • Documents filed179 files

Current status

100%152 of 152 units booked

Figures as on 7 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE CANVAS RESIDENCES -CANVAS 1, CANVAS 2, CANVAS 3NA31311520152

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 66%.

THE CANVAS RESIDENCES -CANVAS 1, CANVAS 2, CANVAS 3: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)66%
Plinth100%
Stilt Floor0%
Slabs of Super Structure24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed241

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots241
Closed/Covered241

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,927 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBEACON TRUSTEESHIP LIMITED
Secured amountRs 470.00 crore
CERSAI search filedYes
Declared on12 Jun 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI17201.26
Proposed, not sanctioned16,363 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LIMITED GROUND FLOOR INDUSTRY HOUSE OPP ROMAN HOUSE 159 HT PAREKH MARG CHURCHGATE MUMBAI 4

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAK Associates
Chartered AccountantBR Nagda & Co
Chartered AccountantHarshad Doshi & Co.
PartnerRole in project
COVENTRY PROPERTIES PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900024531Jul 2025 → Jul 2026

Reason as filed by the promoterTThe impact of the lockdown resulted in severe restrictions on mobility, lack of availability of requisite building materials and non-availability of skilled labour which had already impacted the pace of the ongoing construction of the project ‘THE CANVAS RESIDENCIES - Canvas 1 Canvas 2 and Canvas 3’, causing an unavoidable delay in date Commencement of construction. Further, financial hardship occurred due to lack of response from the prospective buyers also impacted the overall construction progress of the project. Based on the present progress of the project, the project will be completed b

EA19062621434Jul 2025 → Jul 2028

Reason as filed by the promoterThe project was registered with MahaRERA on 27/08/2020. As the Construction Industry is dependent on availability of labours and construction material. Any impact on labour and construction materials affects the progress of entire industry. In view of the war that has broken out between Iran, United States of America and Middle East, the import of construction related material, crude oil and gases etc. has been gravely impacted. The production of tiles and glasses is severally impacted due to the shortage of the gases required for manufacturing. Even due to the shortage of diesel the transport

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC12400063Bhargao ShelarCOVENTRY PROPERTIES PRIVATE LIMITED09/09/2024
CC12500207Varsha Avinash ShindeCOVENTRY PROPERTIES PRIVATE LIMITED21/01/2025
CC12500715TANMAY MADAN THAKURCOVENTRY PROPERTIES PRIVATE LIMITED01/03/2025
CC12502021IIFL Home FinanceCOVENTRY PROPERTIES PRIVATE LIMITED20/06/2025
CC12503658Regan HomavazirCOVENTRY PROPERTIES PRIVATE LIMITED14/10/2025
CC12503659Regan HomavazirCOVENTRY PROPERTIES PRIVATE LIMITED14/10/2025
CC12504205COVENTRY PROPERTIES PRIVATE LIMITEDSatish Vilas Mane28/11/2025
CC12601764COVENTRY PROPERTIES PRIVATE LIMITEDMohammad Farooque Khan27/03/2026
CC12601874COVENTRY PROPERTIES PRIVATE LIMITEDMOHAMMAD FAROOQUE KHAN30/03/2026
CC12604501Girish Ranchhoddas BrahmbhattCOVENTRY PROPERTIES PRIVATE LIMITED18/07/2026
CC12606195SHRUSHTI AGARWALCOVENTRY PROPERTIES PRIVATE LIMITED23/09/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jul 2028

Documents filed179

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 179 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: 202503 Form 5 The Canvas.pdf7 Aug 2026
Form 5 (FY 2023-2024)File: 202403 Form 5 The Canvas.pdf3 Aug 2026
Form 3File: Canvas form 3 March 2026.pdf18 Jun 2026
Form 1File: Form 1 - Canvas - FY25 - Q4.pdf18 Jun 2026
Form 2File: Form 2 - Canvas - Sale - FY25-26 Q4.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Coventry-Disclosure of Inventory-31-March-2026.pdf18 Jun 2026
Form 1File: Form 1 - Canvas - FY25 - Q4.pdf18 Jun 2026
Form 2File: Form 2 - Canvas - Sale - FY25-26 Q4.pdf18 Jun 2026
Form 3File: Canvas form 3 March 2026.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: Coventry-Disclosure of Inventory-31-March-2026.pdf18 Jun 2026
Form 1File: Architect Certifcate Form 1 Plot A 2025.pdf10 Jun 2026
Form 2File: Form 2 25 Sale.pdf10 Jun 2026
Form 3File: Form 3 Canvas Mar 2025.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Coventry Disclosure of Inventory 2025.pdf10 Jun 2026
Form 1File: Architect Certifcate Form 1 01 07 2025.pdf10 Jun 2026
Form 2File: 2025 Coventry Engineer Certificate Form 2 Sales.pdf10 Jun 2026
Form 3File: Form 3 Canvas June 2025.pdf10 Jun 2026
Disclosure of Sold and Booked InventoryFile: Coventry Disclosure of Inventory June 2025.pdf10 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2024.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SEPTEMBER-2024.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DECEMBER -2024.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Sept 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Dec 24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2024.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SEPTEMBER-2024.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DECEMBER -2024.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Sept 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Dec 24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2024.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Dec 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Sept 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sewree Project Dec 24.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SEPTEMBER-2024.pdf27 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DECEMBER -2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Canvas.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Canvas.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate 2A - Coventry- Sales (Plot A) - Jun 24 R.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 Canvas.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A Canvas.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Canvas disclosure of inventory march 24.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory June 24.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Annual Certificate -Mar 2023.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Mar 2024.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Jun 2024.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Mar 2024.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Jun 2024.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Mar 2024.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate June 2024.pdf10 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Annual Certificate -Mar 2022.pdf10 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Certificate -Mar 2023.pdf10 Aug 2024
Declaration in FORM BFile: Form B Coventry Extension.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 Canvas 1 2 3 Form 3.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Jun 2023.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Mar 2023.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Sept 2023.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Mar 2023.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate June 2023.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Mar 2023.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Sept 2023.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Dec 2022.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Dec 2022.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate June 2023.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Mar 2023.pdf4 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Canvas A Engineering Certificate Sept 2023.pdf4 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 Canvas Form 3.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas 1Form 3.pdf11 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas 1Form 3.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas Form 3 Oct 2023.pdf21 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Canvas Form 3 Sep 2023.pdf21 Nov 2023

How this compares with Mumbai City

100%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 36 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI780+ in Mumbai City

Builder: COVENTRY PROPERTIES PRIVATE LIMITED

COVENTRY PROPERTIES PRIVATE LIMITED has 1 registration on MahaRERA, including THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3 is delayed beyond 1 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?

The registered promoter entity is COVENTRY PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?

The professionals named in the filing: Architect: AAK Associates; Chartered Accountant: BR Nagda & Co; Chartered Accountant: Harshad Doshi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, CANVAS 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE CANVAS RESIDENCES - CANVAS 1, CANVAS 2, to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.