Home / Browse projects / Avenue 15

Registered No litigation declared Others project

Avenue 15

By Ramesh Barrel Supplying Co

RG-MH-84929 · RERA P51900032165 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2026Possession promised1 month past this date
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 97%
73 of 127Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Avenue 15 is a Others project by Ramesh Barrel Supplying Co in Sewri, 400015, registered with MahaRERA as P51900032165 on 14 Dec 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 18 months from the original filing. 54 of the 127 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAvenue 15
  • TypeOthers
  • Location
    • Sitaram Palturam Murai Marg
    • Sewri
    • 400015
  • Pincode400015
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900032165
  • ReraGenie IDRG-MH-84929

Builder

  • NameRamesh Barrel Supplying Co
  • Entity typePartnership
  • PartnersRahul Ramesh Chheda, Ramniklal Bhanji Shah, Anil Hirji Chheda, Taraben Amratlal Shah

Key dates

1 months past promisethis monthRegisteredDec 2021First promiseMar 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2021
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed81 files

Current status

43%54 of 127 units booked
90.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avenue 15NA23231261127

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 97%.

Avenue 15: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered126

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,145 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI6513.39
Proposed, not sanctioned6,205 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRaj Niketan, Bhandarkar Rd, Matunga, Mumbai, Maharashtra 400019
Estimated costRs 33.50 cr
Cost incurredRs 30.13 cr
Work done89.95%
BuildingWingEstimatedIncurred
Avenue 15NARs 32.83 crRs 30.13 cr
-NARs 67.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP.R. Dharia & Associates
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
Ramesh Barrel Supplying Co-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013542Mar 2025 → Mar 2026

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19

EA10032620157Mar 2025 → Sep 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement challenges, financial constraints, and site-related issues. Additionally, a road setback portion to be handed over to the Brihanmumbai Municipal Corporation (BMC) has been incorporated subsequently, which was not part of the original scope of work. The development of this setback area is currently in progress, contributing to the extension requirement. Given the circumstances, we kindly request an extension until 30-09-202

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Avenue 15 June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Avenue 15 June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Avenue 15 June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Avenue 15 as on 31-03-2026.pdf12 Apr 2026
Withdrawal Update Form 2File: Form 2 Avenue 15 as on 31-03-2026.pdf12 Apr 2026
Withdrawal Update Form 3File: Form 3 Avenue 15 as on 31-03-2026.pdf12 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Avenue 15 FY 2024-25 (Working).pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - Avenue 15 as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Avenue 15 as on 31-12-2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 - Avenue 15 as on Sept 2025.pdf25 Oct 2025
Withdrawal Update Form 2File: Form 2 - Avenue 15 as on Sept 2025.pdf25 Oct 2025
Withdrawal Update Form 3File: Form 3 - Avenue 15 as on Sept 2025.pdf25 Oct 2025
Form 1File: Form 1 - Avenue 15 as on June 2025.pdf19 Jul 2025
Form 2File: Form 2 - Avenue 15 as on June 2025.pdf19 Jul 2025
Form 3File: Form 3 - Avenue 15 as on June 2025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Avenue 15 as on June 2025.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avenue 15 as on March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avenue 15 as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avenue 15 as on Dec 2024.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avenue 15 as on Dec 2024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avenue 15 as on Dec 2024.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 Avenue 15 as on Sep 2024.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Avenue 15 for FY 2023-24.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avenue 15 as on Sep 2024.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue 15 as on 30-09-2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on 30-09-2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue 15 as on 30-06-2024.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Avenue 15 as on March 2024.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avenue 15 as on March 2024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue 15 as on 31st March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on Dec 2023.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue 15 31-12-2023.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 as on Sep 2023.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on September 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avenue 15 as on 30-09-2023.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Circular 29 as on 30-06-23.pdf7 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Avenue 15 FY22-23.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on June 2023.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avenue 15 as on 30-06-2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: AVENUE 15.pdf25 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Final Form 3 Avenue 31 March 2023.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 as on Decmeber 2022.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avenue 15 as on December 2022.pdf6 Feb 2023
Declaration about Commencement CertificateFile: Format D- Avenue 15.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: AVENUE 15 CIRCULAR 29.pdf26 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Avenue 15 (REVISED).pdf12 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avenue 15 (September 2022).pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue 30 September 2022_compressed.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 of Avenue 15 FY 2021-22.pdf1 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avenue 15- Form 1.pdf13 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf1 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue 15 Form 2- 30th June 2022.pdf1 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avenue 15 June 2022.pdf1 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avenue 15 Form 2- 31st March 2022_compressed.pdf11 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ramesh Barrel Supplying Co- 31st March 2022_compressed.pdf11 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects rera certificate 1.pdf4 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Avenue 15.pdf4 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate 221.pdf4 Dec 2021
Copy of the legal title reportFile: RERA TITLE NEW HARIYANI-1-3.pdf2 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report Ramesh Barrel.pdf2 Dec 2021
Declaration about Commencement CertificateFile: Format D Rbsco (1).pdf19 Nov 2021
Layout approvalFile: Plan Scrutiny amend 2_1-1.pdf18 Nov 2021
Building plan approvalFile: download.pdf18 Nov 2021
Building plan approvalFile: PLAN RAMESH_compressed_compressed_2-2.pdf18 Nov 2021
Building plan approvalFile: PLAN RAMESH_compressed_compressed_3-3.pdf18 Nov 2021
Building plan approvalFile: PLAN RAMESH_compressed_compressed_4-end_11zon.pdf18 Nov 2021
Copy of Layout Approval (in case of layout)File: Plan Scrutiny amend 2_1-1.pdf18 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: download.pdf18 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: PLAN RAMESH_compressed_compressed_2-2.pdf18 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: PLAN RAMESH_compressed_compressed_3-3.pdf18 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: PLAN RAMESH_compressed_compressed_4-end_11zon.pdf18 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Further Cc.pdf18 Nov 2021
Proforma of Allotment letterFile: Revised Agreement For Sale - Avenue 15 Clean.pdf17 Nov 2021
Proforma of Allotment letterFile: Letter of Allotment - 12th Nov Avenue 15 clean.pdf17 Nov 2021
PAN CardFile: PANCARD RAMESH.pdf25 Oct 2021
Details of encumbrancesFile: Encumbrance avenue.pdf25 Oct 2021

Keep Avenue 15 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sewri

2 kmAvenue 15Completed 4Lapsed / revoked 6Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Ramesh Barrel Supplying Co

Ramesh Barrel Supplying Co has 1 registration on MahaRERA, including Avenue 15. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Avenue 15 is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avenue 15?

The registered promoter entity is Ramesh Barrel Supplying Co, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avenue 15?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Avenue 15?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avenue 15?

The professionals named in the filing: Architect: P.R. Dharia & Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avenue 15?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avenue 15. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avenue 15 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.