Home / Browse projects / Pune, Maharashtra / SHANKESHWARAM RESIDENCY
SHANKESHWARAM RESIDENCY
RG-MH-14631 · RERA P52100022946 · Last updated on MahaRERA portal: 10 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHANKESHWARAM RESIDENCY is a Residential / Group Housing project by SUREKHA SACHIN GHULE in Pune, Maharashtra, registered with MahaRERA as P52100022946 on 5 Nov 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 88 of the 96 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameSHANKESHWARAM RESIDENCY
- TypeResidential / Group Housing
- Location
- KONDHWA BUDRUK
- KONDHWA BUDURK
- kondhwa BK
- Haveli
- Pune
- 411048
- Pincode411048
- RERA no.P52100022946
- ReraGenie IDRG-MH-14631
Builder
- NameSUREKHA SACHIN GHULE
- Entity typeIndividual
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Nov 2019
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings2 building records
- Documents filed121 files
Current status
Figures as on 10 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 15 | 12 | 48 | 0 | 48 |
| B WING | NA | 15 | 12 | 48 | 0 | 48 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 10 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
A WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 10 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Watchman Cabin And Entrance Gate | Yes | 100% |
Parking filed288
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 144 | 144 |
| B WING | 144 | 144 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dilip G Kale & Associates |
| Engineer | KIRAN MOHAN KALKUMBE |
| Chartered Accountant | Sheetal M Gadiya |
| Chartered Accountant | Akshay Ramdas Kadam |
| Chartered Accountant | Dnyaneshwar Shelar |
| Partner | Role in project |
|---|---|
| SUREKHA SACHIN GHULE | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000157237 | Suman Anchalia | MRS. SUREKHA SACHIN GHULE | 16/06/2022 |
| CC005000000147237 | Prakash Anchalia | SUREKHA SACHIN GHULE | 16/06/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Feb 2025
Documents filed121
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Dec 24 Shankeshwaram Residency.pdf | 10 Jan 2026 |
| Form 2File: Form 2 Dec 24 Shankeshwaram Residency.pdf | 10 Jan 2026 |
| Form 3File: Form 3 Residency Dec 24_11zon.pdf | 10 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec-24 Shankeshwaram Residency.pdf | 10 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25_Shankeshwaram Residency.pdf | 1 Oct 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Residential March 25.pdf | 30 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Form 4 Shankeshwaram Residency.pdf | 21 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Residency Dec 24_11zon.pdf | 1 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Final Form 4 Shankeshwaram Residency.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24 Shankeshwaram Residency.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24 Shankeshwaram Residency.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec-24 Shankeshwaram Residency.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24_Shankeshwaram Residency_Signed.pdf | 9 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion Certificate Kondhwa Site Residency and Plaza.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate June24.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Residency Form 1 Sept 24.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OB- Residency Form 2 Sept 2024.pdf | 7 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Residency Sept 24.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 March 24 Residency.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 March 24.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Engineer FY 23-24.pdf | 21 May 2024 |
| Disclosure of sold/ booked inventoryFile: 5 Disclosure of Sold Inventory- March 24.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 March 24 Shankeshwaram Residency 11zon.pdf | 21 May 2024 |
| Layout approvalFile: 1 Complete Plot Revised Layout Merged.pdf | 26 Feb 2024 |
| Layout approvalFile: 2 Merged Basement Plan.pdf | 26 Feb 2024 |
| Building plan approvalFile: 3 Merged A WING.pdf | 26 Feb 2024 |
| Building plan approvalFile: 4 Merged B WING.pdf | 26 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 7 Encumberances Details.pdf | 26 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 7 Encumberances Details.pdf | 26 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 1 Complete Plot Revised Layout Merged.pdf | 26 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 2 Merged Basement Plan.pdf | 26 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 Merged A WING.pdf | 26 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 Merged B WING.pdf | 26 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate New.pdf | 26 Feb 2024 |
| Declaration about Commencement CertificateFile: 6 Format D Decleration about commencement Certificate.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Mar 22 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 Jun 22 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 Sept 22 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 Dec 22 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 Mar 23 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 Jun 23 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 Sept 23 Resi.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 Dec 23 Resi.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 FORM 2 Dec 21.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 Mar 22.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2 Jun 22.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2 Sept 22.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2 Dec 22.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 FORM 2 Mar 23.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 FORM 2 Jun 23.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 FORM 2 Sept 23.pdf | 26 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 FORM 2 Dec 23.pdf | 26 Feb 2024 |
| CERSAI detailsFile: 3 CERSAI Merged.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of Sold Inventory- Mar-23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 2 Disclosure of Sold Inventory- Jun-23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 3 Disclosure of Sold Inventory- Sep-23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: 4 Disclosure of Sold Inventory- Dec-23.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 March 23 Shankeshwaram Residency 11zon.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 June 23 Shankeshwaram Residency 11zon.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 Sept 23 Shankeshwaram Residency 11zon.pdf | 26 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 Dec 23 Shankeshwaram Residency 11zon.pdf | 26 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Decleration of Interest in Other Real Estate Org.pdf | 26 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22_Shankeshwaram Residency.pdf | 26 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23_Shankeshwaram Residency.pdf | 26 Feb 2024 |
| Proforma of Agreement for saleFile: 2 Draft Agreement to Sales Resi.pdf | 26 Feb 2024 |
| Proforma of Allotment letterFile: 1 Proforma For Allotment Letter Resi.pdf | 26 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 4 Bank Account Decleration.pdf | 26 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: 8 Deviation Report for Allotment Letter.pdf | 26 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: 9 Deviation report for Agreement to Sales.pdf | 26 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 03-04-2023.pdf | 21 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer certificate form 2A 19-20.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer certificate form 2A 20-21.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer certificate form 2A 21-22.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer certificate form 2A 22-23.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Residency_Q4_FY2021-22.pdf | 28 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Residency_Q1_FY2022-23.pdf | 28 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Residency_Q2_FY2022-23.pdf | 28 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ResidencyQ3_FY2022-23.pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- Signed.pdf | 10 Mar 2022 |
| Details of encumbrancesFile: Encumberance Certificate-1QTR.pdf | 3 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 121 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHANKESHWARAM RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KONDHWA BUDURK13,700+ in Pune
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
Builder: SUREKHA SACHIN GHULE
SUREKHA SACHIN GHULE has 2 registrations on MahaRERA, including SHANKESHWARAM PLAZA and SHANKESHWARAM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SHANKESHWARAM RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHANKESHWARAM RESIDENCY is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHANKESHWARAM RESIDENCY?
The registered promoter entity is SUREKHA SACHIN GHULE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHANKESHWARAM RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHANKESHWARAM RESIDENCY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SHANKESHWARAM RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHANKESHWARAM RESIDENCY?
The professionals named in the filing: Architect: Dilip G Kale & Associates; Engineer: KIRAN MOHAN KALKUMBE; Chartered Accountant: Sheetal M Gadiya; Chartered Accountant: Akshay Ramdas Kadam; Chartered Accountant: Dnyaneshwar Shelar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHANKESHWARAM RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback