Home / Browse projects / Pune, Maharashtra / AISHWARYAM HAMARA ABHIMAAN
AISHWARYAM HAMARA ABHIMAAN
RG-MH-81249 · RERA P52100052847 · Last updated on MahaRERA portal: 17 Feb 2026
Source: official MahaRERA filing
Red flags
- Rs 32.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AISHWARYAM HAMARA ABHIMAAN is a Residential / Group Housing project by SAI ESSEN DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100052847 on 5 Oct 2023. The registration is recorded completed; possession was promised by 29 Dec 2025. 488 of the 578 units on this registration are recorded sold or booked, and 20 of 44 construction stages are filed complete.
At a glance
Project
- NameAISHWARYAM HAMARA ABHIMAAN
- TypeResidential / Group Housing
- Location
- NEXT TO SNBP INTERNATIONAL SCHOOL
- MOSHI
- CHIKHALI
- Haveli
- Pune
- 412114
- Pincode412114
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052847
- ReraGenie IDRG-MH-81249
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Oct 2023
- Promised completion29 Dec 2025
- Revised completionNone
- Buildings4 building records
- Documents filed96 files
Current status
Figures as on 17 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 19 | 16 | 118 | 9 | 127 |
| B | NA | 19 | 16 | 118 | 9 | 127 |
| C | NA | 19 | 15 | 176 | 0 | 176 |
| D | NA | 19 | 15 | 148 | 0 | 148 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 50%.
A50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 2% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 2% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 2% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 2% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed569
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A | 110 | 6 | 116 |
| B | 107 | 5 | 112 |
| C | 171 | 21 | 192 |
| D | 118 | 31 | 149 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A | NA | Rs 24.92 cr | Rs 21.31 cr |
| B | NA | Rs 24.92 cr | Rs 20.53 cr |
| C | NA | Rs 23.85 cr | Rs 19.37 cr |
| D | NA | Rs 19.98 cr | Rs 16.27 cr |
| - | NA | Rs 8.48 cr | Rs 7.01 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHENDRA THAKUR |
| Engineer | NIKHIL INAMDAR |
| Engineer | Sneha sawant |
| Chartered Accountant | OSWAL SOLANKI & ASSOCIATES |
| Chartered Accountant | sheetal jindal |
| Chartered Accountant | OSWAL SOLANKI |
| Partner | Role in project |
|---|---|
| SAI ESSEN DEVELOPERS | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 105/2011 | JMFC PIMPRI PUNE | ORDER |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: form2a abhimaan.pdf | 17 Feb 2026 |
| Occupational CertificateFile: Full Completion Certificate - Abhiman.pdf | 17 Feb 2026 |
| Occupational CertificateFile: OC Verification Mail.pdf | 17 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Abhimaan Signed.pdf | 13 Feb 2026 |
| Withdrawal Update Form 1File: abhimaan form 1 dec.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: abhimaan form 2 Dec.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Hamara Abhimaan form 3 Dec (1).pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Abhimaan form 1 sept - 2025.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: Abhimaan form 2 sep - 25.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: Abhimaan Form 3 sep-25 (1).pdf | 30 Oct 2025 |
| Withdrawal Update Form 1File: Abhiman Form 1 June 25 (2).pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Abhiman Form 2 June 25.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Rera Aishwaryam Abhimaan (1).pdf | 20 Oct 2025 |
| Form 1File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Aug 2025 |
| Form 2File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 19 Aug 2025 |
| Form 3File: 8 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory.pdf | 19 Aug 2025 |
| Form 1File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 19 Aug 2025 |
| Form 2File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 19 Aug 2025 |
| Form 3File: 5 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory.pdf | 19 Aug 2025 |
| Form 1File: FORM 1 Q4 JAN-MARCH 2025 ABHIMAAN.pdf | 18 Aug 2025 |
| Form 2File: FORM 2 JAN-MARCH 2025 ABHIMAAN.pdf | 18 Aug 2025 |
| Form 3File: FORM 3 JAN-MARCH 2025 ABHIMAAN.pdf | 18 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: FORM 3 JAN-MARCH 2025 ABHIMAAN.pdf | 18 Aug 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2025 ABHIMAAN.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JAN-MARCH 2025 ABHIMAAN compressed.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 JAN-MARCH 2025 ABHIMAAN.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JAN-MARCH 2025 ABHIMAAN.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY Q4- JAN-MARCH 2025 ABHIMAAN.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 OCT-DEC 2024 ABHIMAAN.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 OCT-DEC 2024 GAURAV.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 Q3 OCT-DEC 2024 ABHIMAAN.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 OCT-DEC 2024 ABHIMAAN compressed.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 OCT-DEC 2024 GAURAV compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 OCT-DEC 2024 GAURAV.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory ABHIMAAN compressed.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold booked inventory GAURAV compressed.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: abhimaan.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: abhimaan.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: abhimaan.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 2024-25) July- sept Abhimaan.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 2024-25) JULY - SEPT ABHIMAAN.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1(2024-25) APRIL-JUNE ABHIMAAN compressed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1(2024-25) APRIL- JUNE ABHIMAAN.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Q1 2024-25) APRIL - JUNE AB.pdf | 11 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF SOLD UNSOLD (Q1 2024-25) A compressed.pdf | 10 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2024.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (Q4-2023-24) ABHIMAAN compressed.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Q4-2023-23) Abhimaan.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Q4-2023-24).pdf | 11 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-12-2023.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Q3-OCT-DEC 2023).pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 01 (Q3 2023-24) DISCOLSURE OF SOLD BOOKED INVENT.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (Q3-2023-24) compressed.pdf | 19 Jan 2024 |
| Proforma of Agreement for saleFile: 23 AGREEMENT FOR SALE Aishwaryam Hamara Abhiman.pdf | 20 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: 36 Deviation copy of agreement -FINAL (2)-1-8 compressed.pdf | 20 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: 36 Deviation copy of agreement -FINAL (2)-9-16 compressed.pdf | 20 Nov 2023 |
| Proforma of Agreement for saleFile: 23 AGREEMENT FOR SALE Aishwaryam Hamara Abhiman.pdf | 23 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: 36 Deviation copy of agreement -FINAL compressed.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-AHER-SN 4425-2011.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-BHARAT JADHAV-SN4768-2014-1-38 PART 01.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-BHARAT JADHAV-SN4768-2014-39-76 PART 02.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-GOVIND JADHAV-SN5101-2011.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-JADHAV-SN 4422-2011.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-SHRIPATI JADHAV-SN5100-2011.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-TAKALKAR-SN4214-2013.pdf | 23 Sep 2023 |
| Other - LegalFile: SALE DEED-SED-TANAJI JADHAV-SN5102-2011.pdf | 23 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUMBRANCE UNDERTAKING - ABHIMAAN.pdf | 8 Sep 2023 |
| Details of encumbrances concerned to LegalFile: FINANCIAL ENCUMBRANCE UNDERTAKING - ABHIMAAN.pdf | 8 Sep 2023 |
| CERSAI detailsFile: CERSAI REPORT ABHIMAAN.pdf | 8 Sep 2023 |
| Copy of the legal title reportFile: 02 LEGAL TITLE REPORT.pdf | 6 Jul 2023 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 6 Jul 2023 |
| Declaration in FORM BFile: FORM B.pdf | 6 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 18 A DISCLOSURES OF INTEREST IN OTHERREAL ESTATE ORGANIZATIONS.pdf | 6 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 18 B DISCLOSURES OF INTEREST IN OTHERREAL ESTATE ORGANIZATIONS.pdf | 6 Jul 2023 |
| Other - TechnicalFile: CLARIFICATION ON CLUB HOUSE.pdf | 6 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA ABHIMAAN.pdf | 21 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: 04 DETAILS OF ENCUMBRANCES CONCERNED TO LEGAL.pdf | 19 Jun 2023 |
| Details of encumbrances concerned to LegalFile: 04 DETAILS OF ENCUMBRANCES CONCERNED TO LEGAL.pdf | 19 Jun 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| AISHWARYAM NIVAARA | G Block Midc Telco Road Chinchwad Pune Maharashtra Haveli 411019 | 107 | Completed | Sep 2020 | Late, Jun 2022 |
| AISHWARYAM MELODY | G Block Midc Telco Road Chinchwad Pune Maharashtra Haveli 411020 | 84 | Completed | Feb 2020 | Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
Keep AISHWARYAM HAMARA ABHIMAAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHIKHALI13,700+ in Pune
Filed coordinates, straight-line distance. 167 registered projects within 2 km.
Aishwaryam Anand
Sai Essen Developers
AISHWARYAM HAMARA GAURAV
SAI ESSEN DEVELOPERS
VAASTU DREAMS III
SAI ESSEN 7 AND 8 LLP
AISHWARYAM COURTYARD GOLD
SAI ESSEN PROPERTIES
GANESH PARADISE PHASE 2
EKDANTA NEST LLP
PROSPERIA PART 2
PRISTINE PROPERTIES
Builder: SAI ESSEN DEVELOPERS
SAI ESSEN DEVELOPERS has 8 registrations on MahaRERA, including AISHWARYAM HAMARA PHASE I and AISHWARYAM HAMARA PHASE II. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AISHWARYAM HAMARA ABHIMAAN is delayed beyond 29 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AISHWARYAM HAMARA ABHIMAAN?
The registered promoter entity is SAI ESSEN DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABRFS7781C1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AISHWARYAM HAMARA ABHIMAAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AISHWARYAM HAMARA ABHIMAAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AISHWARYAM HAMARA ABHIMAAN?
The professionals named in the filing: Architect: MAHENDRA THAKUR; Engineer: NIKHIL INAMDAR; Engineer: Sneha sawant; Chartered Accountant: OSWAL SOLANKI & ASSOCIATES; Chartered Accountant: sheetal jindal; Chartered Accountant: OSWAL SOLANKI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AISHWARYAM HAMARA ABHIMAAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback