Home / Browse projects / Thane, Maharashtra / SHAMBHU SHANKAR RESIDENCY
SHAMBHU SHANKAR RESIDENCY
RG-MH-87029 · RERA P51700046454 · Last updated on MahaRERA portal: 1 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHAMBHU SHANKAR RESIDENCY is a Others project by VIDISHA CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700046454 on 4 Aug 2022. Possession is promised by 20 Dec 2026. The completion date has moved by 24 months from the original filing. 217 of the 272 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHAMBHU SHANKAR RESIDENCY
- TypeOthers
- Location
- BHADWAD SONALE ROAD
- BHADWAD
- Sonale
- Bhiwandi
- Thane
- 421305
- Pincode421305
- RERA no.P51700046454
- ReraGenie IDRG-MH-87029
Builder
- NameVIDISHA CONSTRUCTIONS
- Entity typePartnership
- PartnerABHISHEK VINOD DWIVEDI
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2022
- Promised completion20 Dec 2026
- Revised completionRevised to 20 Dec 2026 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed111 files
Current status
Figures as on 1 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHAMBHU SHANKAR RESIDENCY | NA | 14 | 14 | 253 | 19 | 272 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
SHAMBHU SHANKAR RESIDENCY: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 62% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed447
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RAGHUNATH SHAMBHU MHATRE | Bhiwandi (M Corp.) | Thane |
| SURENDRA SHANKAR PATIL | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHAMBHU SHANKAR RESIDENCY | NA | Rs 32.12 cr | Rs 24.33 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | shamim ahmed khan |
| Engineer | SHAMIM AHMED KHAN |
| Engineer | ISHTIYQUE AHMED ANSARI |
| Chartered Accountant | MUKESH SONI & ASSOCIATES |
| Chartered Accountant | NITIN BALAJI DHAVAN |
| Partner | Role in project |
|---|---|
| VIDISHA CONSTRUCTIONS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSLOW SALES, INCREASED COST OF MATERIAL, SHORTAGE OF LABOUR. AS PER CIRCULAR NO 28 DATED 22/07/2021 51% CONSENT IS REQUIRED FOR EXTENSION UNDER SECTION 7(3) AND WE HAVE OBTAINED CONSENT OF 53.27% OF ALLOTTES WHICH IS MORE THAN REQUIRED PERCENTAGE, RESOLUTION IS ALREADY UPLOADED IN RESOLUTION TAB . SO PLESE PROCESS OUR APPLICATION AT THE EARLIEST. OUR CUSTOMER LOAN DISBURSEMENT IS PENDING ON THAT ACCOUNT. PLEASE PROCEED AND OBLIGE.
Reason as filed by the promoterDelays in the delivery of construction materials (e.g., steel, lumber, cement). Price volatility and shortages of key materials lead to project delays, as we wait for resources to arrive.There was a lack of skilled labour, especially in specialized fields like electrical work,plumbing has slow down progress on construction sites. Labour shortages is the main reason during festive seasons, which create seasonal work fluctuations and sudden disruptions in project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Mar 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 20 Dec 2026
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 - SHAMBHU SHANKAR - VIDISHA - MARCH 2026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 - SHAMBHU SHANKAR - VIDISHA - MARH 2026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 - SHAMBHU SHANKAR - VIDISHA - MARCH 26_11zon.pdf | 1 Jun 2026 |
| Commencement certificateFile: FURTHER CC SSR.pdf | 28 Mar 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: Form -2.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: shambhu shanker form 3 dec 25.pdf | 28 Mar 2026 |
| Form 5 (FY 2024-2025)File: form 5 signed 2025.pdf | 4 Dec 2025 |
| Form 2A (FY 2024-2025)File: Quality Assurance Certificate_001.pdf | 3 Dec 2025 |
| Withdrawal Update Form 1File: Form-1 30-06-25 shanbhu.pdf | 1 Dec 2025 |
| Withdrawal Update Form 1File: form 3 sept 25 shambhu shanker_11zon.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Form-2 30-06-25 shanbhu.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Form-2 30-09-25 shambhu.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: Form-3 30-06-25_11zon.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: form 3 sept 25 shambhu shanker_11zon.pdf | 1 Dec 2025 |
| Form 1File: 12 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 5 Aug 2025 |
| Form 3File: 18 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 5 Aug 2025 |
| Form 2File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure of sold_ booked inventory.pdf | 5 Aug 2025 |
| Form 1File: 1 SHAMBHU SHANKAR - FORM 1 DEC 2024.pdf | 2 Jul 2025 |
| Form 2File: 2 SHAMBHU SHANKAR FORM 2 DEC 2024.pdf | 2 Jul 2025 |
| Form 3File: 3 SHAMBHU SHANKAR - FORM 3 DEC 2024_11zon.pdf | 2 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SSR Sold Inventory.pdf | 2 Jul 2025 |
| Form 1File: FORM 1 SEPT 24 SHAMBHU.pdf | 2 Jul 2025 |
| Form 2File: FORM 2 SEPT 24 SHAMBHU.pdf | 2 Jul 2025 |
| Form 3File: FORM 3 SEPT 24 SHAMBHU SHANKER_11zon.pdf | 2 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SSR STOCK LIST.pdf | 2 Jul 2025 |
| Form 1File: FORM 1 JUNE 24 SHAMBHU.pdf | 2 Jul 2025 |
| Form 2File: FORM 2 JUNE 24 SHAMBHU.pdf | 2 Jul 2025 |
| Form 3File: FORM 3 JUNE 2024 SHAMBHU SHANKER_11zon.pdf | 2 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SSR STOCK LIST.pdf | 2 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-03-25.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_11zon.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31-03-25.pdf | 3 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 31-03-25.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: GetUserDocumentFileContent (11).pdf | 3 Mar 2025 |
| Declaration in FORM BFile: SHAMBHU SHANKER FORM B LANDLORD.pdf | 28 Feb 2025 |
| Declaration in FORM BFile: SHAMBHU SHANKER FORM B PROMOTER.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHAMBHU SHANKAR - FORM 1 DEC 2024.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHAMBHU SHANKAR - FORM 3 DEC 2024_11zon.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHAMBHU SHANKAR FORM 2 DEC 2024.pdf | 10 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SHAMBHU SHANKAR- DIS FOR SOLD UNSOLD 31 12 2024.pdf | 10 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A - Abhishek Dwivedi.pdf | 23 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A - Shamim Khan.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 23 Dec 2024 |
| Declaration in FORM BFile: FORM B LANDOWNERS --SHAMBHU SHANKER.pdf | 16 Dec 2024 |
| Declaration in FORM BFile: FORM B SHAMIM SHAMBHU SHANKER.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHAMBHU MARCH 24.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 24 SHAMBHU.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 24 SHAMBHU.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11zon_JPEG-to-PDF (21).pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 24 SHAMBHU SHANKER_11zon.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 2024 SHAMBHU SHANKER_11zon.pdf | 16 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH SHAMBHU SHANKER_11zon.pdf | 16 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHAMBHU MARCH 24.pdf | 16 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 24 SHAMBHU.pdf | 16 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT 24 SHAMBHU.pdf | 16 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SSR STOCK LIST.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A--MARCH 24.pdf | 16 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHAMBHU SHANKAR FORM 1 DEC 23.pdf | 1 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHAMBHU SHANKAR FORM 2 DEC 23.pdf | 1 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHAMBHU SHANKAR FORM 3 DEC 23_11zon.pdf | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SSR 2A 2023.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR Form 3 SEPT 2022.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR Form 3 DEC 22.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR Form 3 MARCH 23.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR FORM 3 JUNE 2023.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSR Form 3 SEPT 2023.pdf | 18 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SSR Form 5 - 31-03-2023.pdf | 18 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR_Form_1_30-09-2022.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR_Form_1_31-12-2022.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR_Form_1_31-03-2023.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR_Form_1_30-06-2023.pdf | 12 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSR_Form_1_30-09-2023.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR_Form_2_30-09-2022.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR_Form_2_31-12-2022.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR_Form_2_31-03-2023.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR_Form_2_30-06-2023.pdf | 12 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR_Form_2_30-09-2023.pdf | 12 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Shambhu Shankar Residency Inventory001.pdf | 12 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHAMBHU SHANKAR RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHADWAD7,600+ in Thane
SHIV SAI AWAS
VIDISHA CONSTRUCTIONS
STAR HOMES
BHIWANDI DEVELOPERS
SKY CITY
SUNRISE REALTORS
SHIVAM RESIDENCY PHASE II
SHIVAM DEVELOPERS
ONE SILVER AVENUE
SHIV SAMYAK BUILDERS & DEVELOPERS LLP
THE PALLAZO
SHETRUNJAY REALTY LLP
See every Thane project, with the district possession charts
Builder: VIDISHA CONSTRUCTIONS
VIDISHA CONSTRUCTIONS has 2 registrations on MahaRERA, including SHIV SAI AWAS and SHAMBHU SHANKAR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHAMBHU SHANKAR RESIDENCY is delayed beyond 20 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHAMBHU SHANKAR RESIDENCY?
The registered promoter entity is VIDISHA CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHAMBHU SHANKAR RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHAMBHU SHANKAR RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHAMBHU SHANKAR RESIDENCY?
The professionals named in the filing: Architect: shamim ahmed khan; Engineer: SHAMIM AHMED KHAN; Engineer: ISHTIYQUE AHMED ANSARI; Chartered Accountant: MUKESH SONI & ASSOCIATES; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHAMBHU SHANKAR RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback