ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ONE SILVER AVENUE

Registered No litigation declared Others project

ONE SILVER AVENUE

By SHIV SAMYAK BUILDERS & DEVELOPERS LLP

RG-MH-17785 · RERA P51700055921 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 18.00 crore secured on the land, in favour of DCB BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
6 of 33Construction stages doneacross 3 buildings; furthest along: Stilt Floor, 80%
122 of 192Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

ONE SILVER AVENUE is a Others project by SHIV SAMYAK BUILDERS & DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700055921 on 29 Apr 2024. Possession is promised by 31 Dec 2029. 70 of the 192 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete.

At a glance

Project

  • NameONE SILVER AVENUE
  • TypeOthers
  • Location
    • KAMATGHAR ROAD
    • KAMATGHAR
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421305
  • Pincode421305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700055921
  • ReraGenie IDRG-MH-17785

Builder

  • NameSHIV SAMYAK BUILDERS & DEVELOPERS LLP
  • Entity typePartnership
  • PartnersAMIT RAMESH JAIN, JAY CHANDRASHEKHAR GUPTA, VIKRANT DINESH GUPTA

Key dates

this monthRegisteredApr 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed64 files

Current status

36%70 of 192 units booked
39.3%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA333159867
BUILDING 2NA32301200120
BUILDING 3 COMMUNITY BUILDING NOT FOR SALENA54055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Stilt Floor, at 80%.

BUILDING 143%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 247%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 3 COMMUNITY BUILDING NOT FOR SALE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed447

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots447
Closed/Covered243
Open Space204
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 18039119
BUILDING 2108165273
BUILDING 3 COMMUNITY BUILDING NOT FOR SALE55055

Land and ownership4

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,411 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared present
Charge in favour ofDCB BANK LIMITED
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on15 May 2026
LandownerVillageDistrict
KISHOR MEGHRAJ JAINBhiwandi (M Corp.)Thane
CHANDRASHEKHAR GHANSHYAMDAS GUPTABhiwandi (M Corp.)Thane
DINESH GHANSHYAMDAS GUPTABhiwandi (M Corp.)Thane
DINESH GHANSHYAMDAS GUPTA HUFBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityBhiwandi Nizampur City Municipal Corporation (BNCMC)
Permissible FSI32127.89
Proposed, not sanctioned32,128 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJANKI NIWAS, GROUND FLOOR, OPP. GADKARI RANGAYATAN, DR. MOOSE ROAD, TALAO PALI, THANE (W) - 400602
Estimated costRs 93.50 cr
Cost incurredRs 36.76 cr
Work done39.32%
BuildingWingEstimatedIncurred
BUILDING 2NARs 42.08 crRs 22.06 cr
BUILDING 1NARs 34.42 crRs 14.70 cr
BUILDING 3 COMMUNITY BUILDING NOT FOR SALENARs 8.50 cr-
-NARs 8.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK K CONSULTANTS
EngineerKK CONSULTANT
Chartered AccountantNITIN DHAVAN & CO
Chartered AccountantKINJAL VISHAL DODHIA
PartnerRole in project
SHIV SAMYAK BUILDERS & DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf21 May 2026
Withdrawal Update Form 2File: form 2 (1).pdf21 May 2026
Withdrawal Update Form 3File: form 3 march 26.pdf21 May 2026
Form 2A (FY 2024-2025)File: Form_2A.pdf22 Jan 2026
Withdrawal Update Form 1File: FORM 1 DEC 25.pdf21 Jan 2026
Withdrawal Update Form 2File: FORM 2 DEC 25.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3--08 October to December 2025.pdf21 Jan 2026
Withdrawal Update Form 1File: Architect-sept 25.pdf4 Nov 2025
Withdrawal Update Form 2File: Engineer sept 25.pdf4 Nov 2025
Withdrawal Update Form 3File: ca-sept 25.pdf4 Nov 2025
Withdrawal Update Form 1File: FORM 1 SHIV SAMYAKApril_to_June_2025.pdf5 Aug 2025
Withdrawal Update Form 2File: FORM 2 SHIV SAMYAK April_to_March_2025.pdf5 Aug 2025
Withdrawal Update Form 3File: Form_3.pdf5 Aug 2025
Withdrawal Update Form 1File: FORM 1 SHIV SAMYAKApril_to_June_2025.pdf19 Jul 2025
Withdrawal Update Form 1File: FORM 1 SHIV SAMYAKApril_to_June_2025.pdf19 Jul 2025
Withdrawal Update Form 1File: FORM 1 SHIV SAMYAKApril_to_June_2025.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM 2 SHIV SAMYAK April_to_March_2025.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM 2 SHIV SAMYAK April_to_March_2025.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM 2 SHIV SAMYAK April_to_March_2025.pdf19 Jul 2025
Withdrawal Update Form 3File: Form_3.pdf19 Jul 2025
Withdrawal Update Form 3File: Form_3.pdf19 Jul 2025
Withdrawal Update Form 3File: Form_3.pdf19 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5 - FY 24-25 ONE SILVER.pdf23 Jun 2025
Form 1File: Form_1.pdf11 Jun 2025
Form 2File: Form_2.pdf11 Jun 2025
Form 3File: CA_Certificate.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: Self_Declaration_Rera.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE FOR SOLD UNSOLD- SHIV SAMYAK.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_11zon.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 2024- ONE SILVER AVENUE.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 2024- ONE SILVER AVENUE.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 2024- ONE SILVER AVENUE_11zon.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - SEPT 2024- ONE SILVER AVENUE_11zon.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUNE 2024- ONE SILVER AVENUE.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SEPT 2024- ONE SILVER AVENUE.pdf30 Nov 2024
Copy of the legal title reportFile: TITLE REPORT PLOT AREA MARKED WITH YELLOW.pdf5 Apr 2024
Other - LegalFile: CC COMMENT EMAIL PDF.pdf5 Apr 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE TO LEGAL AND FINACE.pdf4 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE TO LEGAL AND FINACE.pdf4 Mar 2024
CERSAI detailsFile: DECLARATION OF NON APPLICABILITY OF REPORT FORM CERSAI_0001.pdf4 Mar 2024
Building plan approvalFile: BUILDING PLAN MARKED PAGE 1-3.pdf27 Feb 2024
Building plan approvalFile: BUILDING PLAN MARKED PAGE 4-7.pdf27 Feb 2024
Layout approvalFile: LAYOUT APPROVAL.pdf27 Feb 2024
PAN CardFile: PAN_CARD.pdf27 Feb 2024
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN MARKED PAGE 1-3.pdf27 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN MARKED PAGE 4-7.pdf27 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 00_CC.pdf27 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf27 Feb 2024
Declaration in FORM BFile: FORM B PROMOTER_11zon.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS (AMIT R JAIN).pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS (JAY C GUPTA)_0001.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS (VIKRANT D GUPTA)_0001.pdf27 Feb 2024
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER_0001_11zon.pdf27 Feb 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE.pdf27 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf27 Feb 2024
Deviation Report with respect to Allotment letterFile: DEVIATION FROM ALLOTEMENT LETTER.pdf27 Feb 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT FROM AGREEMNET FOR SALE_11zon (1).pdf27 Feb 2024
Other - TechnicalFile: ONE PLOT ONE PROJECT DECLARATION -CUM-UNDERTAKING.pdf27 Feb 2024

How this compares with Thane

36%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ONE SILVER AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMATGHAR7,600+ in Thane

2 kmONE SILVER AVENUECompleted 30Lapsed / revoked 28Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 99 registered projects within 2 km.

Builder: SHIV SAMYAK BUILDERS & DEVELOPERS LLP

SHIV SAMYAK BUILDERS & DEVELOPERS LLP has 1 registration on MahaRERA, including ONE SILVER AVENUE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ONE SILVER AVENUE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ONE SILVER AVENUE?

The registered promoter entity is SHIV SAMYAK BUILDERS & DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ONE SILVER AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ONE SILVER AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ONE SILVER AVENUE?

The professionals named in the filing: Architect: K K CONSULTANTS; Engineer: KK CONSULTANT; Chartered Accountant: NITIN DHAVAN & CO; Chartered Accountant: KINJAL VISHAL DODHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE SILVER AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE SILVER AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE SILVER AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.