ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHAMBHO HOMES

Completed No litigation declared Others project

SHAMBHO HOMES

By VISHWANATH HARISCHANDRA EKAWADE

RG-MH-04504 · RERA P52000022025 · Last updated on MahaRERA portal: 7 Feb 2024

Source: official MahaRERA filing

Red flags

  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

SHAMBHO HOMES is a Others project by VISHWANATH HARISCHANDRA EKAWADE in Raigarh, Maharashtra, registered with MahaRERA as P52000022025 on 25 Aug 2019. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameSHAMBHO HOMES
  • TypeOthers
  • Location
    • Post Kalamb
    • NERAL
    • Pohi
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • RERA no.P52000022025
  • ReraGenie IDRG-MH-04504

Builder

  • NameVISHWANATH HARISCHANDRA EKAWADE
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2019PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2019
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAMBHO HOMESNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SHAMBHO HOMES: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 7 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
CLUB HOUSE JOGGING TRACK CHILDREN PLAY AREANoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,480 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2248.92
Proposed, not sanctioned2,249 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANANJAY S RANE
EngineerDHANANJAY S RANE
Chartered AccountantASHWINI PRABHU
PartnerRole in project
VISHWANATH HARISCHANDRA EKAWADE-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000016961Jun 2022 → Jun 2024

Reason as filed by the promoterApplied for OC of the Project. It may take 2-3 months to obtain the OC.

EXT52000012162Jun 2022 → Jun 2023

Reason as filed by the promoterThere is no Booking of Flats as expected. Shortage of Funds is one of the Reason. Site is located in rural area. Building Material is not easily available

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Jan 2024

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: form no 4.pdf7 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shambho Ent OC_compressed.pdf27 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 23.pdf10 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2023.pdf10 Jan 2024
Certificates of CA (Form 3)File: Form 3 Dec 23.pdf10 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 23.pdf21 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 23.pdf21 Nov 2023
Certificates of CA (Form 3)File: Shambho Enter Form 3 Jun 23_compressed.pdf21 Nov 2023
Certificates of CA (Form 3)File: Shambho Enter Form-3 sep-23_compressed.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shambho Ent form 5 22-23.pdf21 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: dream villa soc certificate.pdf21 Nov 2023
Declaration in FORM BFile: form B.pdf9 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form no 2A.pdf9 Sep 2023
Declaration about Commencement CertificateFile: Format D.pdf8 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1.pdf8 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2.pdf8 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 architect certificate.pdf4 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 Architect certificate.pdf4 Jul 2023
Certificates of CA (Form 3)File: FORM 3 (2).pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold or booked inventory shambho.pdf29 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sep 22.pdf27 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Dec 22.pdf27 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 22.pdf27 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 22.pdf27 Apr 2023
Certificates of CA (Form 3)File: Form 3 Sep 2022.pdf27 Apr 2023
Certificates of CA (Form 3)File: Form 3 Dec 2022.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf22 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf22 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 march 2021.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 june 2021.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 September 2021.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 December 2021.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 march 2022.pdf20 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no 1 june 2022.pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 march 2021.pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 june 2021.pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 September 2021.pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 December 2021.pdf20 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 june 2022.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Shambho ent sold or booked inventory .pdf1 Jul 2022
Certificates of CA (Form 3)File: Shambho ent form 31 Mar 22_11zon.pdf1 Jul 2022
Certificates of CA (Form 3)File: Shambho ent form 22 Jun 22_11zon.pdf1 Jul 2022
Certificates of CA (Form 3)File: Shambho ent form 3 Dec 21- compress.pdf11 Jun 2022
Certificates of CA (Form 3)File: Shambho ent form 3 sep 21.pdf30 Nov 2021
Certificates of CA (Form 3)File: Form 3.pdf14 Aug 2021
Certificates of CA (Form 3)File: Form 3.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Sep 2019.pdf24 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- dec 2019.pdf24 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- mar 2020.pdf24 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- june 2020.pdf24 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Sep 2020.pdf24 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 2020 Architect Certificate.pdf24 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Sep 2019.pdf24 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- dec 2019.pdf24 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- mar 2020.pdf24 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- june 2020.pdf24 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Sep 2020.pdf24 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2020.pdf24 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2021
Certificates of CA (Form 3)File: Form 3.pdf20 Feb 2021
Certificates of CA (Form 3)File: shambhoent Form 3_compressed.pdf6 Aug 2019
Proforma of Allotment letterFile: RERA AGREEMENT FOR SALE.pdf6 Aug 2019
Declaration in FORM BFile: Form B Shambho ent.pdf3 Aug 2019
Proforma of Allotment letterFile: Allotment letter.pdf2 Aug 2019
Details of encumbrancesFile: Non Encumbrance.pdf1 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch-01.pdf31 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate_compressed.pdf31 Jul 2019
Building plan approvalFile: CONSTRUCTION LAYOUT 1_compressed (1).pdf30 Jul 2019
Layout approvalFile: CONSTRUCTION LAYOUT 1_compressed (1).pdf30 Jul 2019
PAN CardFile: pancard_1.pdf30 Jul 2019
Copy of the legal title reportFile: search and title_compressed (1).pdf30 Jul 2019
Copy of Layout Approval (in case of layout)File: CONSTRUCTION LAYOUT 1_compressed (1).pdf30 Jul 2019
Building Plan Approval (IOD)File: CONSTRUCTION LAYOUT 1_compressed (1).pdf30 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: c c copy.pdf30 Jul 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAMBHO HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NERAL5,900+ in Raigarh

Builder: VISHWANATH HARISCHANDRA EKAWADE

VISHWANATH HARISCHANDRA EKAWADE has 1 registration on MahaRERA, including SHAMBHO HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHAMBHO HOMES is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAMBHO HOMES?

The registered promoter entity is VISHWANATH HARISCHANDRA EKAWADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAMBHO HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAMBHO HOMES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAMBHO HOMES?

The professionals named in the filing: Architect: DHANANJAY S RANE; Engineer: DHANANJAY S RANE; Chartered Accountant: ASHWINI PRABHU. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAMBHO HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAMBHO HOMES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAMBHO HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.