SHALINI WADI
RG-MH-07122 · RERA P52800054504 · Last updated on MahaRERA portal: 19 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHALINI WADI is a Residential / Group Housing project by Sanjay Tukaram Khanvilkar in Ratnagiri, Maharashtra, registered with MahaRERA as P52800054504 on 25 Jan 2024. Possession is promised by 31 Dec 2033. 13 of the 75 units on this registration are recorded sold or booked, and 77 of 825 construction stages are filed complete.
At a glance
Project
- NameSHALINI WADI
- TypeResidential / Group Housing
- Location
- Dapoli to Khed Highway
- Kumbhave
- Dapoli
- Ratnagiri
- 415712
- Pincode415712
- RERA no.P52800054504
- ReraGenie IDRG-MH-07122
Builder
- NameSanjay Tukaram Khanvilkar
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Jan 2024
- Promised completion31 Dec 2033
- Revised completionNone
- Buildings75 building records
- Documents filed303 files
Current status
Figures as on 19 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGALOW 01 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 02 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 03 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 04 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 05 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 06 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 07 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 08 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 09 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 10 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 11 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 12 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 13 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 14 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 15 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 16 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 17 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 18 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 19 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 20 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 21 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 22 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 23 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 24 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 25 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 26 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 27 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 28 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 29 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 30 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 31 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 32 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 33 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 34 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 35 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 36 | NA | 2 | 2 | 2 | 0 | 2 |
| BUNGALOW 38 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 39 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 40 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 41 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 42 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 43 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 44 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 45 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 46 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 47 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 48 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 49 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 50 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 51 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 52 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 53 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 54 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 55 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 56 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 57 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 58 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 59 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 60 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 61 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 62 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 63 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 64 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 65 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 66 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 67 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 68 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 69 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 70 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 71 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 72 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 73 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 74 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 75 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW 76 | NA | 2 | 2 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 75 buildings; the table lists the first 20.
77 of 825 construction stages are filed complete across 75 buildings. The stage furthest along is Plinth, at 95%.
BUNGALOW 010%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 020%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 030%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 040%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 0527%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 1% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 060%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 070%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 080%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 090%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 1018%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 110%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 120%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 130%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 1455%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 1% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUNGALOW 150%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 160%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 170%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 180%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 190%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW 200%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 99% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 70% |
| Open Parking | No | Not applicable |
Parking filed150
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BUNGALOW 01 | 2 | 2 |
| BUNGALOW 02 | 2 | 2 |
| BUNGALOW 03 | 2 | 2 |
| BUNGALOW 04 | 2 | 2 |
| BUNGALOW 05 | 2 | 2 |
| BUNGALOW 06 | 2 | 2 |
| BUNGALOW 07 | 2 | 2 |
| BUNGALOW 08 | 2 | 2 |
| BUNGALOW 09 | 2 | 2 |
| BUNGALOW 10 | 2 | 2 |
| BUNGALOW 11 | 2 | 2 |
| BUNGALOW 12 | 2 | 2 |
| BUNGALOW 13 | 2 | 2 |
| BUNGALOW 14 | 2 | 2 |
| BUNGALOW 15 | 2 | 2 |
| BUNGALOW 16 | 2 | 2 |
| BUNGALOW 17 | 2 | 2 |
| BUNGALOW 18 | 2 | 2 |
| BUNGALOW 19 | 2 | 2 |
| BUNGALOW 20 | 2 | 2 |
| BUNGALOW 21 | 2 | 2 |
| BUNGALOW 22 | 2 | 2 |
| BUNGALOW 23 | 2 | 2 |
| BUNGALOW 24 | 2 | 2 |
| BUNGALOW 25 | 2 | 2 |
| BUNGALOW 26 | 2 | 2 |
| BUNGALOW 27 | 2 | 2 |
| BUNGALOW 28 | 2 | 2 |
| BUNGALOW 29 | 2 | 2 |
| BUNGALOW 30 | 2 | 2 |
| BUNGALOW 31 | 2 | 2 |
| BUNGALOW 32 | 2 | 2 |
| BUNGALOW 33 | 2 | 2 |
| BUNGALOW 34 | 2 | 2 |
| BUNGALOW 35 | 2 | 2 |
| BUNGALOW 36 | 2 | 2 |
| BUNGALOW 38 | 2 | 2 |
| BUNGALOW 39 | 2 | 2 |
| BUNGALOW 40 | 2 | 2 |
| BUNGALOW 41 | 2 | 2 |
| BUNGALOW 42 | 2 | 2 |
| BUNGALOW 43 | 2 | 2 |
| BUNGALOW 44 | 2 | 2 |
| BUNGALOW 45 | 2 | 2 |
| BUNGALOW 46 | 2 | 2 |
| BUNGALOW 47 | 2 | 2 |
| BUNGALOW 48 | 2 | 2 |
| BUNGALOW 49 | 2 | 2 |
| BUNGALOW 50 | 2 | 2 |
| BUNGALOW 51 | 2 | 2 |
| BUNGALOW 52 | 2 | 2 |
| BUNGALOW 53 | 2 | 2 |
| BUNGALOW 54 | 2 | 2 |
| BUNGALOW 55 | 2 | 2 |
| BUNGALOW 56 | 2 | 2 |
| BUNGALOW 57 | 2 | 2 |
| BUNGALOW 58 | 2 | 2 |
| BUNGALOW 59 | 2 | 2 |
| BUNGALOW 60 | 2 | 2 |
| BUNGALOW 61 | 2 | 2 |
| BUNGALOW 62 | 2 | 2 |
| BUNGALOW 63 | 2 | 2 |
| BUNGALOW 64 | 2 | 2 |
| BUNGALOW 65 | 2 | 2 |
| BUNGALOW 66 | 2 | 2 |
| BUNGALOW 67 | 2 | 2 |
| BUNGALOW 68 | 2 | 2 |
| BUNGALOW 69 | 2 | 2 |
| BUNGALOW 70 | 2 | 2 |
| BUNGALOW 71 | 2 | 2 |
| BUNGALOW 72 | 2 | 2 |
| BUNGALOW 73 | 2 | 2 |
| BUNGALOW 74 | 2 | 2 |
| BUNGALOW 75 | 2 | 2 |
| BUNGALOW 76 | 2 | 2 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 4.20 cr | Rs 4.20 cr |
| BUNGALOW 69 | NA | Rs 28.51 lakh | - |
| BUNGALOW 01 | NA | Rs 28.51 lakh | - |
| BUNGALOW 02 | NA | Rs 28.51 lakh | - |
| BUNGALOW 03 | NA | Rs 28.51 lakh | - |
| BUNGALOW 04 | NA | Rs 28.51 lakh | - |
| BUNGALOW 05 | NA | Rs 28.51 lakh | Rs 5.70 lakh |
| BUNGALOW 06 | NA | Rs 28.51 lakh | - |
| BUNGALOW 07 | NA | Rs 28.51 lakh | - |
| BUNGALOW 08 | NA | Rs 28.51 lakh | - |
| BUNGALOW 09 | NA | Rs 28.51 lakh | - |
| BUNGALOW 10 | NA | Rs 28.51 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Durgesh Pedurkar Associates LLP |
| Engineer | Durgesh Pedurkar Associates LLP |
| Chartered Accountant | KARIA & SHAH CHARTERED ACCOUNTANTS |
| Chartered Accountant | SHRIKANT DILIP KAWDE |
| Chartered Accountant | KARIA AND SHAH |
| Partner | Role in project |
|---|---|
| Sanjay Tukaram Khanvilkar | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2033
Documents filed303
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 303 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: Form2.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: Form2.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: Form3-6-10.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: Form3-6-10.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNEu002725.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNEu002725.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE JUNEu002725.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 JUNE 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNEu002725.pdf | 19 Jul 2025 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNEu002725.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE JUNEu002725.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE JUNEu002725.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: FORM 3 JUNE 25.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: FORM 3 JUNE 25.pdf | 19 Jul 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 24-25.pdf | 19 Jul 2025 |
| Form 1File: Architect Certificate Sept 2024_compressed.pdf | 11 Jul 2025 |
| Form 2File: Engr Certificate Sept 2024_compressed.pdf | 11 Jul 2025 |
| Form 3File: Form 3 Sept 24 Final.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SEP24.pdf | 11 Jul 2025 |
| Form 1File: Architect Certificate Dec 2024_compressed.pdf | 11 Jul 2025 |
| Form 2File: Engr Certificate Dec 2024_compressed.pdf | 11 Jul 2025 |
| Form 3File: Form 3 Dec 24 Final.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DEC24.pdf | 11 Jul 2025 |
| Form 1File: Architect Certificate Mar 2025_compressed.pdf | 11 Jul 2025 |
| Form 2File: Eng Certificate Mar 2025_compressed.pdf | 11 Jul 2025 |
| Form 3File: Form 3 March 25 final.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: MAR25.pdf | 11 Jul 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A 2025.pdf | 11 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A 2024.pdf | 11 Jul 2025 |
| Building plan approvalFile: Plot 2 new.pdf | 5 Jul 2025 |
| Building plan approvalFile: plot1 new.pdf | 5 Jul 2025 |
| Building plan approvalFile: plot 3 new.pdf | 5 Jul 2025 |
| Building plan approvalFile: plot 4 new.pdf | 5 Jul 2025 |
| Building plan approvalFile: plot 5 new.pdf | 5 Jul 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf | 17 Jun 2025 |
| Form 1File: Architect Certificate form 1 june.pdf | 23 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 2024_Final.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 29 Apr 2024 |
| Other - LegalFile: Kharedi Khat1.pdf | 2 Jan 2024 |
| Other - LegalFile: 4S Declaration.pdf | 2 Jan 2024 |
| Layout approvalFile: Plot Blueprint.pdf | 11 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf | 11 Dec 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf | 11 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Plot Blueprint.pdf | 11 Dec 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200289657088_For_Asset_Based_Search_11_12_2023_17_16_13_110.pdf | 11 Dec 2023 |
| Other - FinanceFile: Encumbrance Finance.pdf | 11 Dec 2023 |
| Other - FinanceFile: CERSAI_Search_Report_200289657088_For_Asset_Based_Search_11_12_2023_17_16_13_110.pdf | 11 Dec 2023 |
| Copy of the legal title reportFile: Search Report SHALINI WADI.pdf | 28 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plot No 73.pdf | 28 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plot No 74.pdf | 28 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plot No 75.pdf | 28 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Plot No 76.pdf | 28 Nov 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 28 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 28 Nov 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 28 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: NO DEVIATION FROM ALLOTMENT LETTER.pdf | 28 Nov 2023 |
| Other - LegalFile: Kharedi Khat.pdf | 28 Nov 2023 |
| Other - LegalFile: Kharedi Khat2.pdf | 28 Nov 2023 |
| Other - LegalFile: Kharedi Khat3.pdf | 28 Nov 2023 |
| Other - LegalFile: Kharedi Khat 4.pdf | 28 Nov 2023 |
| Other - TechnicalFile: Declaration of Total Area for Project.pdf | 28 Nov 2023 |
| Other - TechnicalFile: Clarification on FSI.pdf | 28 Nov 2023 |
| Building plan approvalFile: Plot no 1.pdf | 17 Nov 2023 |
| Building plan approvalFile: Plot no 2.pdf | 17 Nov 2023 |
| Building plan approvalFile: Plot no 3.pdf | 17 Nov 2023 |
| Building plan approvalFile: Plot no 4.pdf | 17 Nov 2023 |
| Building plan approvalFile: Plot no 5.pdf | 17 Nov 2023 |
| Building plan approvalFile: plot no 6.pdf | 17 Nov 2023 |
| Building plan approvalFile: plot no 7.pdf | 17 Nov 2023 |
| Building plan approvalFile: plot no 8.pdf | 17 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 303 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHALINI WADI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kumbhave1,100+ in Ratnagiri
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
Cape of Bliss Phase 1A
HOABL Management LLP
VIAA VISION
VIAA VISION
COASTAL BREEZE
UNIVERSAL PROPERTIES
VRUNDAVAN
EMPIRE REALTORS AND DEVELOPERS
Cape of Bliss Phase I
Lodha Management LLP
See every Ratnagiri project, with the district possession charts
Builder: Sanjay Tukaram Khanvilkar
Sanjay Tukaram Khanvilkar has 1 registration on MahaRERA, including SHALINI WADI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if SHALINI WADI is delayed beyond 31 Dec 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHALINI WADI?
The registered promoter entity is Sanjay Tukaram Khanvilkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHALINI WADI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHALINI WADI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHALINI WADI?
The professionals named in the filing: Architect: Durgesh Pedurkar Associates LLP; Engineer: Durgesh Pedurkar Associates LLP; Chartered Accountant: KARIA & SHAH CHARTERED ACCOUNTANTS; Chartered Accountant: SHRIKANT DILIP KAWDE; Chartered Accountant: KARIA AND SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHALINI WADI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.