Home / Browse projects / Mumbai Suburban, Maharashtra / SETHIA PRIDE A WING
SETHIA PRIDE A WING
By Sethia Infrastructure Pvt. Ltd,
RG-MH-75815 · RERA P51800046531 · Last updated on MahaRERA portal: 3 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 100.00 crore secured on the land, in favour of Vivriti Capital Limited
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SETHIA PRIDE A WING is a Residential / Group Housing project by Sethia Infrastructure Pvt. Ltd, in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046531 on 10 Aug 2022. Possession is promised by 31 Dec 2026. 231 of the 295 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSETHIA PRIDE A WING
- TypeResidential / Group Housing
- Location
- Akurli Road
- Kandivali East
- Borivali
- Mumbai Suburban
- 400101
- Pincode400101
- RERA no.P51800046531
- ReraGenie IDRG-MH-75815
Builder
- NameSethia Infrastructure Pvt. Ltd,
- Entity typeCompany
- CINU45400MH2008PTC180721
- GSTIN27AALCS9354B1Z4
- DirectorBASANTRAJ SETHIA
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Aug 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed174 files
Current status
Figures as on 3 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sethia pride Wing A Sale Building No 2 | NA | 42 | 42 | 295 | 0 | 295 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
Sethia pride Wing A Sale Building No 2: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sethia pride Wing A Sale Building No 2 | NA | Rs 194 | Rs 148 |
| - | NA | Rs 21 | Rs 20 |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR PANKAJ BIYANI |
| Engineer | AMOL GHAGARE |
| Engineer | Santosh Bore |
| Engineer | HARESH L PATEL |
| Chartered Accountant | ANIL JAIN |
| Chartered Accountant | Yogesh Kabra |
| Chartered Accountant | YGESH B KABRA & CO |
| Partner | Role in project |
|---|---|
| Sethia Infrastructure Pvt. Ltd, | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed174
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 174 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate.pdf | 3 Jul 2026 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 3 Jul 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE.pdf | 3 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5 FY 2025- 26.pdf | 8 May 2026 |
| Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf | 15 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf | 15 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf | 15 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf | 15 Apr 2026 |
| Form 5 (FY 2022-2023)File: Form 5 FY 2022 - 23.pdf | 15 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 FY 2023 - 24.pdf | 15 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 2024- 25.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 11 Nov 2025 |
| Withdrawal Update Form 3File: CA Certificate.pdf | 11 Nov 2025 |
| Form 1File: Architect Certificate.pdf | 23 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 23 Jul 2025 |
| Form 3File: CA Certificate.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 23 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - FINANCE.pdf | 16 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf | 16 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 16 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 16 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 16 Jul 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - FINANCE.pdf | 16 Jul 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - LEGAL.pdf | 16 Jul 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Rera- SIPL.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 4 Jun 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrances Rera- SIPL.pdf | 4 Jun 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf | 30 May 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Dt 30 12 2023.pdf | 30 May 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Dt 30 12 2023.pdf | 30 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 30 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 30 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 30 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 30 May 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf | 30 May 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate Dt 30 12 2023.pdf | 30 May 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate Dt 30 12 2023.pdf | 30 May 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - FINANCE.pdf | 17 May 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf | 17 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 17 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 17 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 17 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 17 May 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - FINANCE.pdf | 17 May 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - LEGAL.pdf | 17 May 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf | 14 Jan 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - LEGAL.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5 FY 2023 - 24.pdf | 14 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - FINANCE.pdf | 13 Jan 2025 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - FINANCE.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 10 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - FINANCE.pdf | 22 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 22 Oct 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - FINANCE.pdf | 22 Oct 2024 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE - LEGAL.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023 - 24.pdf | 1 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - FINANCE.pdf | 6 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - LEGAL.pdf | 6 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 174 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SETHIA PRIDE A WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kandivali East6,700+ in Mumbai Suburban
Sheetal Uptown
SIDHESHWAR LIFESPACES PRIVATE LIMITED
ENSO SANZA
Sai Aastha Developers
SPRINGWOODS
PRATIK CONSTRUCTION
Godrej Nest
Shivam Megastructures Pvt Ltd
PATON TOWERS
PRAVIN VIRAM SATRA
Godrej Bliss
SHIVAM DEVELOPERS
See every Mumbai Suburban project, with the district possession charts
Builder: Sethia Infrastructure Pvt. Ltd,
SETHIA INFRASTRUCTURE PVT LTD has 2 registrations on MahaRERA, including SETHIA DARSHAN and SETHIA PRIDE A WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SETHIA PRIDE A WING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SETHIA PRIDE A WING?
The registered promoter entity is Sethia Infrastructure Pvt. Ltd,, a company as per the filing. Its CIN U45400MH2008PTC180721 and GSTIN 27AALCS9354B1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SETHIA PRIDE A WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SETHIA PRIDE A WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SETHIA PRIDE A WING?
The professionals named in the filing: Architect: AR PANKAJ BIYANI; Engineer: AMOL GHAGARE; Engineer: Santosh Bore; Engineer: HARESH L PATEL; Chartered Accountant: ANIL JAIN; Chartered Accountant: Yogesh Kabra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SETHIA PRIDE A WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback