Sethia Grandeur

By K MANIAR

RG-MH-20312 · RERA P51800009020 · Last updated on MahaRERA portal: 26 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 52 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2022Possession promised52 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2 of 99Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

Sethia Grandeur is a Residential / Group Housing project by K MANIAR in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009020 on 19 Aug 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 18 months from the original filing. 97 of the 99 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSethia Grandeur
  • TypeResidential / Group Housing
  • Location
    • Opp UPL House
    • BANDRA EAST
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009020
  • ReraGenie IDRG-MH-20312

Builder

  • NameK MANIAR
  • Entity typePartnership
  • GSTIN27AAIFK0079K1Z2
  • PartnersBASANTRAJ MEGHRAJ SETHIA, KISHOR KANTILAL MANIAR, DHUKKA DEVELOPERS PVT LTD DHUKKA DEVELOPERS PVT LTD

Key dates

52 months past promisethis monthRegisteredAug 2017First promiseDec 2020Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Dec 2020)
  • Buildings1 building record
  • Documents filed158 files

Current status

98%97 of 99 units booked

Figures as on 26 Dec 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sethia GrandeurNA222295499

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sethia Grandeur: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Swimming Pool and Fitness CenterYes100%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area896 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2026

Approvals and building plan

Permissible FSI6928.78
Proposed, not sanctioned5,789 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALINDI BLDGAPMC MKT SECTOR 19 VASHI NAVI MUMBAI 400705

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJITENDRA B PATEL
ArchitectPankaj Biyani
EngineerSantosh Bore
EngineerHARESH PATEL
Chartered AccountantYogesh Kabra
Chartered AccountantAnil Jain
PartnerRole in project
K MANIAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009059Dec 2020 → Dec 2021

Reason as filed by the promoterDue to the restriction in between on height caused by the high court order we could not get full CC on time and after the order was lifted, Airport Authority of India granted height clearance and we got the full CC and as of now we have completed full construction and only OC from 16-20 stories is pending as on date.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000193325Veera Olivia D'souzaSethia Infrastructure.14/12/2021
CC006000000193388ZENON ANDREW D'SOUZASethia Infrastructure.14/12/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Sep 2020

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-K Maniar FY 2023-2024.pdf26 Dec 2024
Details of encumbrances concerned to FinanceFile: KM - FINANCE ENCUMBRANCE.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: KM -LEGAL ENCUMBRANCE.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.pdf18 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate.pdf18 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf18 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf18 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf18 Dec 2024
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf18 Dec 2024
Certificates of CA (Form 3)File: CA Certificate.pdf18 Dec 2024
Certificates of CA (Form 3)File: CA Certificate.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: KM - FINANCE ENCUMBRANCE.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: KM -LEGAL ENCUMBRANCE.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Finance.pdf18 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Legal.pdf18 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf18 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf15 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificat Dt 30 06 23.pdf15 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dt 30 09 23.pdf15 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dt 31 12 23.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf15 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf15 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf15 Feb 2024
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf15 Feb 2024
Certificates of CA (Form 5)File: FORM 5-K MANIAR FY 20-21.pdf15 Feb 2024
Certificates of CA (Form 5)File: FORM 5-K MANIAR FY 21-22.pdf15 Feb 2024
Certificates of CA (Form 5)File: FORM 5-K MANIAR FY 22-23.pdf15 Feb 2024
Details of encumbrancesFile: Encumbrances Certificate.pdf10 Feb 2024
Details of encumbrancesFile: Encumbrances Certificate.pdf9 Feb 2024
Details of encumbrancesFile: Encumbrances Certificate.pdf9 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5-K MANIAR FY 22-23.pdf10 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-K MANIAR FY 22-23.pdf10 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-23.pdf22 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-K MANIAR FY 21-22.pdf18 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf20 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf20 Jun 2023
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf17 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: LATEST CC COPY DT 5-7-2021.pdf6 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf6 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf6 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf6 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf6 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf6 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf6 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf6 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf6 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf6 Jun 2023
Certificates of CA (Form 3)File: CA Certificate.pdf6 Jun 2023
Certificates of CA (Form 3)File: CA Certificate.pdf6 Jun 2023
Certificates of CA (Form 3)File: Architect Certificate.pdf6 Jun 2023
Details of encumbrancesFile: Encumbrances Certificate.pdf10 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2021-22.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf21 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf21 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf21 Sep 2022
Certificates of CA (Form 3)File: CA Certificate.pdf21 Sep 2022
Details of encumbrancesFile: Encumbrances.pdf1 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31-03-2022.pdf1 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 31-03-2022.pdf1 Jun 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf1 Jun 2022
Certificates of CA (Form 3)File: CA CERTIFICATE 31-03-2022.pdf1 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf11 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf11 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf11 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf11 Mar 2022
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf11 Mar 2022
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf11 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: K Maniar Form 5 FY 2018-19.pdf11 Mar 2022

How this compares with Mumbai Suburban

98%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sethia Grandeur on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDRA EAST6,700+ in Mumbai Suburban

2 kmSethia GrandeurCompleted 129Lapsed / revoked 71Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 353 registered projects within 2 km.

Builder: K MANIAR

K MANIAR has 1 registration on MahaRERA, including Sethia Grandeur. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Sethia Grandeur shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sethia Grandeur is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sethia Grandeur?

The registered promoter entity is K MANIAR, a partnership as per the filing. Its GSTIN 27AAIFK0079K1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sethia Grandeur?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sethia Grandeur?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sethia Grandeur?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sethia Grandeur?

The professionals named in the filing: Architect: JITENDRA B PATEL; Architect: Pankaj Biyani; Engineer: Santosh Bore; Engineer: HARESH PATEL; Chartered Accountant: Yogesh Kabra; Chartered Accountant: Anil Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sethia Grandeur?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sethia Grandeur. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sethia Grandeur to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.