ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SETHIA DARSHAN

Registered Litigation declared Others project

SETHIA DARSHAN

By SETHIA INFRASTRUCTURE PVT LTD

RG-MH-60536 · RERA P51800011224 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 4 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken
  • Rs 15.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL LIMITED

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
23 of 91Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 173 documents Report an error

SETHIA DARSHAN is a Others project by SETHIA INFRASTRUCTURE PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011224 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 68 of the 91 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameSETHIA DARSHAN
  • TypeOthers
  • Location
    • Daftary Road
    • Malad East
    • Andheri
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011224
  • ReraGenie IDRG-MH-60536

Builder

  • NameSETHIA INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • CINU45400MH2008PTC180721
  • GSTIN27AALCS9354B1Z4
  • Named personsKirit C Maniar, Pankaj Chimanlal Maniar, Madanraj Sohanlal Kothari, Suresh Kothari
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed173 files

Current status

75%68 of 91 units booked
87.3%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SETHIA DARSHANNA2423721991

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

SETHIA DARSHAN: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,447 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA CAPITAL LIMITED
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on1 Jun 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI9976.0
Proposed, not sanctioned1,434 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK SHOP NO 14 MONICA ARCADE SUBHASH LANE OFF DAFATY ROAD MALAD EAST 400097
Estimated costRs 46
Cost incurredRs 40
Work done87.31%
BuildingWingEstimatedIncurred
SETHIA DARSHANNARs 43Rs 38
-NARs 3Rs 2

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Biyani
ArchitectVinayak Lomate
EngineerAmol Ghagare
EngineerSiddique Sunasara
EngineerSantosh Ganpat Bore
EngineerHaresh L Patel
EngineerM R PATIL CONSULTING ENGINEERS PVT LTD
Chartered AccountantDeepak Kshirsagar
Chartered AccountantANIL GANPATLAL JAIN
Chartered AccountantYOGESH B KABRA AND CO
PartnerRole in project
SETHIA INFRASTRUCTURE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025549Dec 2024 → Dec 2026

Reason as filed by the promoterProvided that the Authority may in reasonable circumstances, without default on the part of the promoter, based on the facts of each case, and for reasons to be recorded in writing, extend the registration granted to a project for such time as it considers necessary, which shall, in aggregate, not exceed a period of one year:

Litigation declared3

CaseCourtStatus
RAD 615 of 2013/2013Small Causes CourtClosed
2135/2016City Civil CourtOngoing
2135/2016City Civil CourtOngoing

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000057402Mrs. Shardaben Lalit TankMr. Kirit Chimanlal Maniar27/12/2018
CC006000000262059Rebekah Titus BenjaminPrathmesh Developers through its Partner Mr Basantraj SethiaShri01/08/2022
CC12502734HarishBhai PragjiBhai MiraniSETHIA INFRASTRUCTURE PVT LTD04/08/2025
CC12503503Kirt chimanlal ManiarSETHIA INFRASTRUCTURE PVT LTD01/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed173

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 173 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf15 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf15 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf15 Apr 2026
Form 2A (FY 2019-2020)File: Form 2A FY 2019-20.pdf15 Apr 2026
Form 2A (FY 2020-2021)File: Form 2A FY 2020-21.pdf15 Apr 2026
Form 2A (FY 2021-2022)File: Form 2A FY 2021-22.pdf15 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf15 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf15 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf15 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf15 Apr 2026
Form 5 (FY 2019-2020)File: Form 5 2021-22.pdf15 Apr 2026
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf15 Apr 2026
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf15 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf15 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf3 Feb 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf3 Feb 2026
Withdrawal Update Form 3File: CA Certificate Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf5 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf5 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf5 Nov 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf5 Nov 2025
Withdrawal Update Form 3File: CA CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 3File: CA CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 3File: CA CERTIFICATE.pdf5 Nov 2025
Withdrawal Update Form 3File: CA CERTIFICATE.pdf5 Nov 2025
Form 1File: Engineer Certificate.pdf15 May 2025
Form 2File: CA Certificate.pdf15 May 2025
Form 3File: Sold - Unsold Inventory.pdf15 May 2025
Disclosure of Sold and Booked InventoryFile: ARCHITECT CERTIFICATE.pdf15 May 2025
Declaration in FORM BFile: Form B Revised.pdf12 Feb 2025
Declaration in FORM BFile: Form B Revised.pdf12 Feb 2025
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCE.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf10 Jan 2025
Certificates of CA (Form 3)File: CA Certificate.pdf10 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold - Unsold Inventory.pdf10 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf10 Jan 2025
Certificates of CA (Form 3)File: CA Certificate.pdf10 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold - Unsold Inventory.pdf10 Jan 2025
Declaration about Commencement CertificateFile: Declaration of CC.pdf20 Dec 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf20 Dec 2024
Declaration in FORM BFile: FORM B.pdf18 Dec 2024
Declaration in FORM BFile: FORM B.pdf18 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf22 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf22 Nov 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCE.pdf15 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf21 Oct 2024
Certificates of CA (Form 3)File: CA Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold - Unsold Inventory.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate.pdf21 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf21 Oct 2024
Certificates of CA (Form 3)File: CA Certificate.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold - Unsold Inventory.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf31 Jul 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf24 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf24 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold - Unsold Inventory.pdf24 Jul 2024

How this compares with Mumbai Suburban

75%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SETHIA DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad East6,700+ in Mumbai Suburban

2 kmSETHIA DARSHANCompleted 110Lapsed / revoked 60Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 304 registered projects within 2 km.

Builder: SETHIA INFRASTRUCTURE PVT LTD

SETHIA INFRASTRUCTURE PVT LTD has 2 registrations on MahaRERA, including SETHIA DARSHAN and SETHIA PRIDE A WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SETHIA DARSHAN is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SETHIA DARSHAN?

The registered promoter entity is SETHIA INFRASTRUCTURE PVT LTD, a company as per the filing. Its CIN U45400MH2008PTC180721 and GSTIN 27AALCS9354B1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SETHIA DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SETHIA DARSHAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SETHIA DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SETHIA DARSHAN?

The professionals named in the filing: Architect: Pankaj Biyani; Architect: Vinayak Lomate; Engineer: Amol Ghagare; Engineer: Siddique Sunasara; Engineer: Santosh Ganpat Bore; Engineer: Haresh L Patel. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SETHIA DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SETHIA DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SETHIA DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.