Sethia Aashray-Phase 1

By AAKASH DEVELOPERS

RG-MH-28852 · RERA P51800027166 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 36 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
5 of 115Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Sethia Aashray-Phase 1 is a Others project by AAKASH DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027166 on 20 Nov 2020. Possession is promised by 30 Jun 2027. The completion date has moved by 36 months from the original filing. 110 of the 115 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSethia Aashray-Phase 1
  • TypeOthers
  • Location
    • Akurli Cross Road
    • Kandivali E
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800027166
  • ReraGenie IDRG-MH-28852

Builder

  • NameAAKASH DEVELOPERS
  • Entity typePartnership
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2020First promiseJun 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Nov 2020
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed140 files

Current status

96%110 of 115 units booked
99.3%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sethia Aashray - Phase 1NA25241078115

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sethia Aashray - Phase 1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area258 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Nov 2025

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI194557.21
Proposed, not sanctioned3,721 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector 19 C Vashi Branch
Estimated costRs 37
Cost incurredRs 36
Work done99.34%
BuildingWingEstimatedIncurred
Sethia Aashray - Phase 1NARs 28Rs 29
-NARs 8Rs 8

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPankaj Biyani
EngineerAMOL GHAGARE
EngineerSiddique Sunasara
EngineerHaresh L Patel
Chartered AccountantAnil Jain
Chartered AccountantYOGESH B KABRA AND CO
PartnerRole in project
AAKASH DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024512Jun 2024 → Jun 2025

Reason as filed by the promoterDue to part encroachment on proposed D P Road providing access to the building not yet cleared by BMC ward office

EA01072501902Jun 2024 → Jun 2027

Reason as filed by the promoterFirstly we would like to inform you that we have successfully completed the construction of the building. Our project is Ground floor + 23rd floor, the possession of the flats have been given to all the allottees. As the building is fully completed with amenities and occupied, the allottes are enjoying the occupation. Due to part encroachment on proposed D P Road providing access to the building not yet cleared by BMC ward office, the project was not able to get completed in time. Also the mechanical car parking tower work is going on, apart from that everything is completed and they have no i

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf15 Jul 2026
Withdrawal Update Form 2File: Engineer Ceritificate.pdf15 Jul 2026
Withdrawal Update Form 3File: CA Certificate.pdf15 Jul 2026
Withdrawal Update Form 1File: architect certificate.pdf7 May 2026
Withdrawal Update Form 2File: Engineer Ceritificate.pdf7 May 2026
Withdrawal Update Form 3File: CA Certificate.pdf7 May 2026
Withdrawal Update Form 1File: architect certificate aakash.pdf4 Feb 2026
Withdrawal Update Form 1File: architect certificate aakash.pdf4 Feb 2026
Withdrawal Update Form 2File: Engineer Ceritificate.pdf4 Feb 2026
Withdrawal Update Form 2File: Engineer Ceritificate.pdf4 Feb 2026
Withdrawal Update Form 3File: CA Certificate.pdf4 Feb 2026
Withdrawal Update Form 3File: CA Certificate.pdf4 Feb 2026
Commencement certificateFile: Full CC Sale Building.pdf1 Nov 2025
Withdrawal Update Form 1File: Architect Certificate.pdf1 Nov 2025
Withdrawal Update Form 2File: engineer certificate.pdf1 Nov 2025
Withdrawal Update Form 3File: CA Certificate.pdf1 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A 2024-25.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 - FY 2024-2025.pdf1 Nov 2025
Form 1File: form 1.pdf1 Jul 2025
Form 2File: form 2.pdf1 Jul 2025
Form 3File: form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf1 Jul 2025
Details of encumbrances concerned to FinanceFile: FINANCE ENCUMBRANCE.pdf16 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Legal.pdf16 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf16 May 2025
Details of encumbrances concerned to LegalFile: FINANCE ENCUMBRANCE.pdf16 May 2025
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Legal.pdf16 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Finance.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Legal.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Finance.pdf14 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Legal.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf10 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Finance.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Legal.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Finance.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Legal.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD - AAKASH.pdf16 Oct 2024
Declaration in FORM BFile: P51800027166_FileName_0.pdf13 Aug 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-23.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf26 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf26 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - FY 2023-2024.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Legal.pdf24 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Certificate - Finance.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Legal.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrances Certificate - Finance.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD - AAKASH.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf24 Jul 2024
Details of encumbrancesFile: Encumbrances Rera- Aakash.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf4 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf4 Apr 2024
Details of encumbrancesFile: Encumbrances Rera- Aakash.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf5 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf5 Jan 2024
Details of encumbrancesFile: Encumbrances Rera- Aakash.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 Oct 2023
Details of encumbrancesFile: Encumbrances Rera- Aakash.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf10 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Ceritificate.pdf8 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf8 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - FY 2021-2022.pdf26 Jun 2023
Declaration about Commencement CertificateFile: Declaration about commencement certficate dated 25-05-2023.pdf3 Jun 2023

How this compares with Mumbai Suburban

96%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sethia Aashray-Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali E6,700+ in Mumbai Suburban

2 kmSethia Aashray-Phase 1Completed 43Lapsed / revoked 42Other 62Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: AAKASH DEVELOPERS

AAKASH DEVELOPERS has 2 registrations on MahaRERA, including AAKASH RIVER VIEW and Sethia Aashray-Phase 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sethia Aashray-Phase 1 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sethia Aashray-Phase 1?

The registered promoter entity is AAKASH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sethia Aashray-Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sethia Aashray-Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sethia Aashray-Phase 1?

The professionals named in the filing: Architect: Pankaj Biyani; Engineer: AMOL GHAGARE; Engineer: Siddique Sunasara; Engineer: Haresh L Patel; Chartered Accountant: Anil Jain; Chartered Accountant: YOGESH B KABRA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sethia Aashray-Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sethia Aashray-Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sethia Aashray-Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.