Home / Browse projects / Nashik, Maharashtra / SERENITY at Ashok Astoria
SERENITY at Ashok Astoria
RG-MH-14918 · RERA P51600033661 · Last updated on MahaRERA portal: 7 Oct 2022
Source: official MahaRERA filing
Red flags
- De-registered
- Possession 7 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SERENITY at Ashok Astoria is a Residential / Group Housing project by PENINSULA LAND LIMITED in Nashik, Maharashtra, registered with MahaRERA as P51600033661 on 2 Mar 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameSERENITY at Ashok Astoria
- TypeResidential / Group Housing
- Location
- GIRNARE ROAD
- ASHOK ASTORIA COMPLEX
- Govardhan
- Nashik
- 422222
- Pincode422222
- RERA no.P51600033661
- ReraGenie IDRG-MH-14918
Key dates
Key facts
Registration and timeline
- StatusDe-registered
- Registered on2 Mar 2022
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings3 building records
- Documents filed29 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER A | NA | 20 | 0 | 0 | 0 | 0 |
| TOWER B | NA | 20 | 0 | 0 | 0 | 0 |
| TOWER C | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 7 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
TOWER A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed73
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| TOWER A | 1 | 31 | 32 |
| TOWER B | 1 | 31 | 32 |
| TOWER C | 1 | 8 | 9 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JAGADISH P DESHPANDE |
| Engineer | Bhushan Gavande |
| Chartered Accountant | KIRAN MATHKAR |
| Partner | Role in project |
|---|---|
| PENINSULA LAND LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| RCS/413/2021/2021 | COURT OF CIVIL JUDGE SENIOR DIVISION NASHIK | PENDING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC001000000030278 | ARVIND KAPOOR | PENINSULA LAND LIMITED | 26/08/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed29
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Completion certificate by Architect September 2022_compressed.pdf | 7 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate_Serenity at AA.PDF | 7 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report - Sept 2022.pdf | 7 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Serenity AA RERA Sep22.pdf | 7 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ashok Astoria-Serenity.pdf | 7 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ashok Astoria Completion certificate by Architect June 2022_compressed.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ashok Astoria Completion certificate by Architect June 2022_compressed.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Serenity AA_RERA Jun 22.pdf | 7 Jul 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200241606249_For_Debtor_Based_Search_06_07_2022_20_09_57_582.pdf | 7 Jul 2022 |
| Layout approvalFile: Serenity-LAYOUT PLAN_.pdf | 23 Feb 2022 |
| Layout approvalFile: Tower A, B - Approved Floor Plan 1.pdf | 23 Feb 2022 |
| Layout approvalFile: Tower A, B - Approved Floor Plan 2.pdf | 23 Feb 2022 |
| Layout approvalFile: Tower C - Approved floor Plan.pdf | 23 Feb 2022 |
| Building plan approvalFile: Commencement Cretificate 1 july 2021_compressed (1).pdf | 23 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Serenity-LAYOUT PLAN_.pdf | 23 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Tower A, B - Approved Floor Plan 1.pdf | 23 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Tower A, B - Approved Floor Plan 2.pdf | 23 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Tower C - Approved floor Plan.pdf | 23 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Commencement Cretificate 1 july 2021_compressed (1).pdf | 23 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Cretificate 1 july 2021_compressed (1).pdf | 23 Feb 2022 |
| Declaration about Commencement CertificateFile: Declaration abount Commencement Certificate (Form D).pdf | 23 Feb 2022 |
| Copy of the legal title reportFile: T ITLE Report.pdf | 22 Feb 2022 |
| PAN CardFile: PLL PAN Card.pdf | 20 Jan 2022 |
| Details of encumbrancesFile: Encumbrance Certificate - Serenity Ashok Astoria.pdf | 20 Jan 2022 |
| Declaration in FORM BFile: Declaration - Serenity Ashok Astoria_compressed.pdf | 20 Jan 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200228434921_For_Debtor_Based_Search_20_01_2022_10_50_33_293.pdf | 20 Jan 2022 |
| CERSAI detailsFile: Cersai Declaration 1.pdf | 20 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Serenity Ashok Astoria_compressed.pdf | 20 Jan 2022 |
| Proforma of Allotment letterFile: AFS Declaration.pdf | 20 Jan 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Ashok Astoria Phase 1 | Gat No 2 Govardhan Road Gangapur Village Nashik | Completed | Sep 2016 | Late, May 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 16 other registrations, which the RERA portal never shows together
- All 29 filed documents as one ZIP, foldered, with a manifest
Keep SERENITY at Ashok Astoria on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ASHOK ASTORIA COMPLEX4,100+ in Nashik
JEEVAN BAUG
DIVINE BUILDERS
DAKSH SKYWAY
R K CONSTRUCTION
Vastu Niwas
Art Constructions
Narayani Dham
Hemant Ramesh Jadhav
Aarambh Elite
Kothari Housing Company
Wind Chimes
PR Enterprises
See every Nashik project, with the district possession charts
Builder: PENINSULA LAND LIMITED
Peninsula Land Limited has 17 registrations on MahaRERA, including Celestia Spaces and addressOne - Phase 1. Its filings disclose 12 earlier MahaRERA projects: declares 7 of 11 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that SERENITY at Ashok Astoria shows as de-registered on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SERENITY at Ashok Astoria is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SERENITY at Ashok Astoria?
The registered promoter entity is PENINSULA LAND LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SERENITY at Ashok Astoria?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SERENITY at Ashok Astoria?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SERENITY at Ashok Astoria?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SERENITY at Ashok Astoria?
The professionals named in the filing: Architect: JAGADISH P DESHPANDE; Engineer: Bhushan Gavande; Chartered Accountant: KIRAN MATHKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SERENITY at Ashok Astoria?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback