Home / Browse projects / Mumbai Suburban, Maharashtra / Seabliss

Registered No litigation declared Residential / Group Housing project

Seabliss

By Asshna Developers Westin

RG-MH-89982 · RERA P51800046626 · Last updated on MahaRERA portal: 19 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 4 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 99%
51 of 100Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Seabliss is a Residential / Group Housing project by Asshna Developers Westin in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046626 on 25 Aug 2022. Possession is promised by 30 Apr 2027. The completion date has moved by 4 months from the original filing. 49 of the 100 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSeabliss
  • TypeResidential / Group Housing
  • Location
    • Popco colony Road
    • Andheri west
    • Andheri
    • Mumbai Suburban
    • 400061
  • Pincode400061
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046626
  • ReraGenie IDRG-MH-89982

Builder

  • NameAsshna Developers Westin
  • Entity typeOthers
  • Named personAsshna Developers Westin
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2022First promiseDec 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2022
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed110 files

Current status

49%49 of 100 units booked
81.4%Work done, per cost certificate

Figures as on 19 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ekopa Sahaniwas Cooperative societyNA25231000100

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.

Ekopa Sahaniwas Cooperative society: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 19 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed102

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots102
Closed/Covered102

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,152 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Jul 2025
LandownerVillageDistrict
Ekopa Sahaniwas Cooperative SocietyAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI10065.0
Proposed, not sanctioned8,070 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Palm Court - M, Near D-mart, New Link Road, Malad West, Mumbai, Maharashtra - 400064
Estimated costRs 64.00 cr
Cost incurredRs 52.12 cr
Work done81.44%
BuildingWingEstimatedIncurred
Ekopa Sahaniwas Cooperative societyNARs 44.80 crRs 36.48 cr
-NARs 19.20 crRs 15.64 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShilp Associates
EngineerMr. Chetan P Tambewagh
Chartered AccountantR A N K & Associates
Chartered AccountantR A N K & Associates LLP
Chartered AccountantKhushalani & Co.
PartnerRole in project
Asshna Developers Westin-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800046626/WarDec 2026 → Apr 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400292Yash Vardhan Singh RoyAsshna Developers Westin01/10/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SEABLISS FORM-2A-FY-2025-26.pdf19 Sep 2026
Withdrawal Update Form 1File: FORM-1-Q1-TY-2026-27.pdf7 Aug 2026
Withdrawal Update Form 2File: FORM-2-Q1-TY-2026-27.pdf7 Aug 2026
Withdrawal Update Form 3File: Signed Seabliss_Form 3 Certificate_30-06-2026-Q1.pdf7 Aug 2026
Withdrawal Update Form 1File: FORM - Seabliss Form 1 FY- 25-26.pdf28 Apr 2026
Withdrawal Update Form 2File: Seabliss FORM-2-Q4-FY-2025-26.pdf28 Apr 2026
Withdrawal Update Form 3File: Seabliss Signed FORM-3-Q4-FY-2025-26 Final.pdf28 Apr 2026
Withdrawal Update Form 1File: Signed FORM-1-Q3-FY-2025-26.pdf17 Feb 2026
Withdrawal Update Form 2File: Signed FORM-2-Q3-FY-2025-26.pdf17 Feb 2026
Withdrawal Update Form 3File: Signed Seabliss Form3 Q3 FY 2025-26.pdf17 Feb 2026
Withdrawal Update Form 1File: FORM 1 Q2 FY2025 26.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 as on 30092025.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 as on 30092025 Seabliss.pdf19 Nov 2025
Form 5 (FY 2024-2025)File: ASSHNA DEVELOPERS WESTIN FORM 5202425.pdf11 Nov 2025
Withdrawal Update Form 1File: RERA Form 1 ARCHITECTu0027S CERTIFICATE 12 08 2025.pdf22 Aug 2025
Withdrawal Update Form 2File: FORM-2-Q1-FY-2025-26.pdf22 Aug 2025
Withdrawal Update Form 3File: sign Withdrawal Application Form 3 as on 30 06 2025.pdf22 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: DOS Final.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold as on 31122024.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Seabliss_ Form 3 as on 31122024 Signed.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Seabliss_Form 2 Certificate_31122024_V1.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-SEABLISS.pdf7 Feb 2025
Declaration about Commencement CertificateFile: Format D - Declaration on CC_Revised.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Seabliss Q2 of FY 24-25.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Seabliss as on 30092024_Signed_V1.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Seabliss Q2 of FY 24-25.pdf6 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ASSHNA DEVELOPERS WESTIN FORM 5-2023-24.pdf2 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: FCC Seabliss 23rd Slab (1).pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_15072024_v1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 as on 30062024 Seabliss.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q1-2023-24_compressed.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Seabliss Signed.pdf22 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Ekopa CC Revalitation Receipt till 11072025.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Seabliss- Self Declaration for not issuing new Forms1,2,3.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Seabliss- Self Declaration for not issuing new Forms1,2,3.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q4-2023-24_compressed.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Seabliss- Self Declaration for not issuing new Forms1,2,3.pdf23 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Seabliss (Ekopa).pdf22 Feb 2024
Declaration about Commencement CertificateFile: Form D CC Declaration.pdf22 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q3-2023-24_signed.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q3-2023-24.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-Architect Certificate.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-Engineer Certificate.pdf26 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q2-2023-24.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-CA Certificate.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SIGNED FORM 5 SEA BLISS_22-23.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked InventoryQ1202324.pdf28 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Westin-Quality Assurance Certificate Form-2A-FY-2022-23.pdf22 Jul 2023
Layout approvalFile: Plans_compressed.pdf7 Jun 2023
Layout approvalFile: Plan 2_compressed (1).pdf7 Jun 2023
Layout approvalFile: IOA Full 23 flr Seabliss 10 of 10_compressed.pdf7 Jun 2023
Layout approvalFile: 3 of 10.pdf7 Jun 2023
Layout approvalFile: IOA Full 23 flr Seabliss 5 of 10_compressed.pdf7 Jun 2023
Building plan approvalFile: Plan 2_compressed (1).pdf7 Jun 2023
Building plan approvalFile: IOA Full 23 flr Seabliss 4 of 10_compressed.pdf7 Jun 2023
Building plan approvalFile: IOA Pages Seabliss Ekopa (2).pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: Plans_compressed.pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: Plan 2_compressed (1).pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: 3 of 10.pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: IOA Full 23 flr Seabliss 5 of 10_compressed.pdf7 Jun 2023
Copy of Layout Approval (in case of layout)File: IOA Full 23 flr Seabliss 10 of 10_compressed.pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: IOA Pages Seabliss Ekopa (2).pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_compressed (1).pdf7 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: IOA Full 23 flr Seabliss 4 of 10_compressed.pdf7 Jun 2023
Layout approvalFile: plan 1.pdf18 May 2023
Copy of Layout Approval (in case of layout)File: plan 1.pdf18 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q4-2022-23 (1)_compressed.pdf22 Apr 2023
Layout approvalFile: Plan 1 of 11_compressed (1).pdf31 Jan 2023
Copy of Layout Approval (in case of layout)File: Plan 1 of 11_compressed (1).pdf31 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory-Q3-2022-23_compressed.pdf27 Jan 2023
Other - TechnicalFile: PromoterDeclaration for application withdrawn.pdf17 Aug 2022
Declaration about Commencement CertificateFile: Format D.pdf12 Aug 2022
Declaration about Commencement CertificateFile: Letter to MHADA for Correct CTS number.pdf12 Aug 2022
Proforma of Allotment letterFile: Agreement for Sale RERA Seabliss.pdf9 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Agreement for Sale RERA SeablissDeviation.pdf9 Aug 2022
Other - LegalFile: Map Report DP (2).pdf9 Aug 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sky ResidencyMALAD WEST25CompletedDec 2017Late, Jun 2018

How this compares with Mumbai Suburban

49%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Seabliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri west6,700+ in Mumbai Suburban

2 kmSeablissCompleted 48Lapsed / revoked 32Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: Asshna Developers Westin

Asshna Developers Westin has 1 registration on MahaRERA, including Seabliss. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Seabliss is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Seabliss?

The registered promoter entity is Asshna Developers Westin, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Seabliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Seabliss?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Seabliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Seabliss?

The professionals named in the filing: Architect: Shilp Associates; Engineer: Mr. Chetan P Tambewagh; Chartered Accountant: R A N K & Associates; Chartered Accountant: R A N K & Associates LLP; Chartered Accountant: Khushalani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Seabliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Seabliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Seabliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.