Home / Browse projects / Pune, Maharashtra / Sayama Phase 4
Sayama Phase 4
RG-MH-12405 · RERA P52100005004 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sayama Phase 4 is a Residential / Group Housing project by Puranik Builders Limited in Pune, Maharashtra, registered with MahaRERA as P52100005004 on 9 Aug 2017. Possession is promised by 30 Dec 2036.
At a glance
Project
- NameSayama Phase 4
- TypeResidential / Group Housing
- Location
- Sahyadri Nagar Road
- Lonavala (M Cl)
- Mawal
- Pune
- 410401
- Pincode410401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100005004
- ReraGenie IDRG-MH-12405
Builder
- NamePuranik Builders Limited
- Entity typeCompany
- CINU99999MH1990PLC056451
- GSTIN27AABCP0109R1Z9
- Managing DirectorShailesh Gopal Puranik
- DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik
- Other registrations19 more →
- Completed5 of 20
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2017
- Promised completion30 Dec 2036
- Revised completionNone
- Buildings18 building records
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 2 Villa 5 to 8 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 3 Villa 9 and 10 | NA | 8 | 0 | 0 | 0 | 0 |
| Building 4 Villa 11 to 14 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 5 Villa 15 to 18 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 6 Villa 19 to 21 | NA | 12 | 0 | 0 | 0 | 0 |
| Building 7 Villa 22 and 23 | NA | 8 | 0 | 0 | 0 | 0 |
| Building 19 Villa 64 to 67 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 20 Villa 68 to 71 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 23 Villa 80 to 83 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 24 Villa 84 to 87 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 28 Villa 98 to 101 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 29 Villa 102 to 105 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 30 Villa 106 to 109 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 31 Villa 110 to 113 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 33 Villa 118 to 121 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 34 Villa 122 to 125 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 38 Villa 136 to 139 | NA | 16 | 0 | 0 | 0 | 0 |
| Building 39 Villa 140 to 143 | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building18
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
62 of 198 construction stages are filed complete across 18 buildings. The stage furthest along is Internal walls, at 99%.
Building 2 Villa 5 to 80%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 3 Villa 9 and 1068%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 4 Villa 11 to 140%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 5 Villa 15 to 1840%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 3% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 6 Villa 19 to 2128%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 12% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 7 Villa 22 and 2373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 19 Villa 64 to 6743%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 20 Villa 68 to 7139%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 85% |
| Podiums (if any) | 0% |
| Plinth | 85% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 25% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 23 Villa 80 to 8343%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 24 Villa 84 to 8711%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 28 Villa 98 to 10161%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 83% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 93% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 29 Villa 102 to 10518%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 35% |
| Podiums (if any) | 0% |
| Plinth | 35% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 30 Villa 106 to 10937%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 31 Villa 110 to 11373%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 33 Villa 118 to 12136%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 34 Villa 122 to 12532%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 1% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 38 Villa 136 to 13970%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 81% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 88% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Building 39 Villa 140 to 14361%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 71% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 79% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 40% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 45% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 45% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed67
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building 2 Villa 5 to 8 | 4 | 4 |
| Building 3 Villa 9 and 10 | 2 | 2 |
| Building 4 Villa 11 to 14 | 4 | 4 |
| Building 5 Villa 15 to 18 | 4 | 4 |
| Building 6 Villa 19 to 21 | 3 | 3 |
| Building 7 Villa 22 and 23 | 2 | 2 |
| Building 19 Villa 64 to 67 | 4 | 4 |
| Building 20 Villa 68 to 71 | 4 | 4 |
| Building 23 Villa 80 to 83 | 4 | 4 |
| Building 24 Villa 84 to 87 | 4 | 4 |
| Building 28 Villa 98 to 101 | 4 | 4 |
| Building 29 Villa 102 to 105 | 4 | 4 |
| Building 30 Villa 106 to 109 | 4 | 4 |
| Building 31 Villa 110 to 113 | 4 | 4 |
| Building 33 Villa 118 to 121 | 4 | 4 |
| Building 34 Villa 122 to 125 | 4 | 4 |
| Building 38 Villa 136 to 139 | 4 | 4 |
| Building 39 Villa 140 to 143 | 4 | 4 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mahesh Suhas Padalkar | Thane (M Corp.) | Thane |
| Ghanshyam Vinayak Soparkar | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G A Design |
| Architect | Unique Planner |
| Architect | Vastushilpa Associates |
| Engineer | Kedar Yernalkar |
| Engineer | Sagar Abnave |
| Engineer | J W Consultants LLP |
| Chartered Accountant | VMD & Co |
| Chartered Accountant | HDO & Associates |
| Chartered Accountant | VMD and Company |
| Partner | Role in project |
|---|---|
| Puranik Builders Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2036
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Engineers Cert_Sayama_IV20012026.pdf | 24 Apr 2026 |
| Form 3File: CA Certificates - Sayama IV- Final.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sayama Phase 4 Oct-Dec 2025.pdf | 24 Apr 2026 |
| Form 1File: Form 1 - Sayama 4.pdf | 24 Apr 2026 |
| Form 2File: Form 2.pdf | 24 Apr 2026 |
| Form 3File: Form 3 Sayama 4A.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sales data.pdf | 24 Apr 2026 |
| Form 1File: Form 1 30062025.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Engineers Cert_Sayama_IV_30062025.pdf | 24 Apr 2026 |
| Form 3File: Form 3.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - Puraniks Sayama Phase 4.pdf | 24 Apr 2026 |
| Form 1File: Form 1 - Architect Certificate.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Engineers Cert_Sayama_IV_39062025.pdf | 24 Apr 2026 |
| Form 3File: CA Certificates - Sayama IV- 30092025 Final.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sales Data.pdf | 24 Apr 2026 |
| Form 5 (FY 2024-2025)File: Rera Form 5 - Sayama Phase 4 - sign.pdf | 29 Sep 2025 |
| Certificates of CA (Form 3)File: CA Certificates - Sayama IV.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV_311224.pdf | 19 Feb 2025 |
| Certificates of CA (Form 3)File: CA Certificates - Sayama IV- 31122024_compressed.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV_30092024.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Sayama Ph 04 - 31122024.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sayama Phase 4.pdf | 20 Oct 2024 |
| Certificates of CA (Form 3)File: CA Certificates - Sayama IV 30092024.pdf | 20 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sayama Phase 4_Singed.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2A- Sayama 4 Year 23-24.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV_300624.pdf | 24 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Sayama 4 Year 23-24.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024 Architects Certificate FORM-1 sAYAMA 04.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Sayama Phase 4.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-04-01_Architect Certificate_04_.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV.pdf | 26 Apr 2024 |
| Certificates of CA (Form 3)File: Sayama 4.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sayama - 5004.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert Sayama IV 31122023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Sayama 4.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sayama_Phase-04_30092023.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV_30092023.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: sayama 04.pdf | 16 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Sayama Phase 4 - signed final.pdf | 30 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV31032023.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV30062023.pdf | 10 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Sayama 4.pdf | 8 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023-06-30_Architect Certificate_04.pdf | 7 Aug 2023 |
| Certificates of CA (Form 3)File: HDO - SAYAMA 04 - 035.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sayama_Phase-4.pdf | 2 May 2023 |
| Certificates of CA (Form 3)File: Sayama 4.pdf | 2 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sayama Phase 4 Architect Certificate 31122022.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert Sayama IV 31122022.pdf | 25 Mar 2023 |
| Certificates of CA (Form 3)File: Sayama 4 0001.pdf | 31 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sayama 4.pdf | 12 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert Sayama 4.pdf | 12 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV 30062019.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV 30092019.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sector IV 31032022 compressed.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Sayama IV.pdf | 11 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SAYAMA PHASE 4.pdf | 5 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sayama 4.pdf | 1 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sayama Phase 04.pdf | 8 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Sayama Phase 04.pdf | 8 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert Sayama IV.pdf | 8 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Cert_Sayama_IV.pdf | 7 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sayama phase 4.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Form 5 Sayama 4.pdf | 5 Aug 2021 |
| Details of Restarting of Construction work post lockdownFile: Sayama Phase 4 - REPORT.pdf | 14 Jul 2020 |
| Certificates of CA (Form 5)File: Sayama Phase 4 PBL_-Form_-5.pdf | 22 Nov 2018 |
| Proforma of Allotment letterFile: RERA Agreement Sayama 4.pdf | 8 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: LONAWALA_CC_09-10-2013.PDF | 7 Mar 2018 |
| Details of encumbrancesFile: Details of Encumbrances - revision.pdf | 10 Nov 2017 |
| Declaration in FORM BFile: Promoter Sayama 4.PDF | 29 Jul 2017 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Hometown Part C | Kasarvadavali Ghodbunder Road Thane west 400615 | 108 | Completed | Dec 2016 | Late, Apr 2017 |
| Aldea Annexo | Aldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045 | 129 | Completed | Dec 2016 | Late, Apr 2017 |
| Hometown Part B | Kasarvadavali Ghodbunder Road Thane west 400615 | 159 | Completed | Aug 2014 | Late, Jan 2015 |
| Hometown Part A | Kasarvadavali Ghodbunder Road Thane west 400615 | 176 | Completed | Jun 2013 | Late, Nov 2013 |
| Puranik City Part A | Kasarvadavali Ghodbunder Road Thane west 400615 | 108 | Completed | Dec 2012 | Late, Feb 2013 |
| Puranik City Part B | Kasarvadavali Ghodbunder Road Thane west 400615 | 80 | Completed | Dec 2011 | Late, Apr 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sayama Phase 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Lonavala (M Cl)13,700+ in Pune
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
CANARY FARMS
CANARY FARMS
HRIDAAN HEIGHTS
R SQUARE BUILDERS AND DEVELOPERS
Amoda Reserve - South Park
Kalpataru Properties (Thane) Private Limit
Nakshatra Valley
Hariom Sai Developers
MANTRA DIVINE PHASE 2
MANTRA UNIVERSE PRIVATE LIMITED
EMERALD VILLAS
ASHWIN ARVIND SANGHVI
Builder: Puranik Builders Limited
Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sayama Phase 4 is delayed beyond 30 Dec 2036?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sayama Phase 4?
The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sayama Phase 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sayama Phase 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sayama Phase 4?
The professionals named in the filing: Architect: G A Design; Architect: Unique Planner; Architect: Vastushilpa Associates; Engineer: Kedar Yernalkar; Engineer: Sagar Abnave; Engineer: J W Consultants LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sayama Phase 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback