Home / Browse projects / Pune, Maharashtra / Sayama Phase 3

Completed No litigation declared Residential / Group Housing project

Sayama Phase 3

By Puranik Builders Limited

RG-MH-09889 · RERA P52100002137 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

Sayama Phase 3 is a Residential / Group Housing project by Puranik Builders Limited in Pune, Maharashtra, registered with MahaRERA as P52100002137 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSayama Phase 3
  • TypeResidential / Group Housing
  • Location
    • Sahyadri Nagar
    • Lonavala (M Cl)
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002137
  • ReraGenie IDRG-MH-09889

Builder

  • NamePuranik Builders Limited
  • Entity typeCompany
  • CINU99999MH1990PLC056451
  • GSTIN27AABCP0109R1Z9
  • Managing DirectorShailesh Gopal Puranik
  • DirectorsYogesh Govind Puranik, Shrikant Govind Puranik, Nilesh Ravindra Puranik
  • Other registrations19 more →
  • Completed5 of 20
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed63 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 21 Villa 72 to 75NA160000
Building 27 Villa 96 to 97NA80000
Building 32 Villa 114 to 117NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building 21 Villa 72 to 7582%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 27 Villa 96 to 9782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 32 Villa 114 to 11782%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10
BuildingClosed/CoveredTotal
Building 21 Villa 72 to 7544
Building 27 Villa 96 to 9722
Building 32 Villa 114 to 11744

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,366 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Mahesh Suhas PadalkarThane (M Corp.)Thane
Ghanshyam Vinayak SoparkarMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI1238.26
Proposed, not sanctioned1,238 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No G 115, 116, 117, 118, High Street cum Highland Corporate Centre, Kapurbawadi Junction, Thane

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastushilpa Associates
ArchitectG A Design
ArchitectUnique Planners
EngineerJ W Consultants LLP
EngineerSagar Abnave
Chartered AccountantHDO & Associates
Chartered AccountantVMD and Company
PartnerRole in project
Puranik Builders Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Dec 2023

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - completion certificate 13-12-2023.pdf27 Nov 2024
Other - TechnicalFile: Architect Certificate 25112024 sayama 3.pdf27 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Sayama Phase 3_singed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Sayama Phase 3_singed.pdf7 Oct 2024
Certificates of CA (Form 3)File: Sayama 3.pdf19 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cluster no 21 27 38 Sayama OC 21 10 2022.pdf22 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cluster no 21 villa no 73 Sayama OC 30 09 2021.pdf22 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cluster no 32 Villa no 114 115 116 117 Sayama OC 23 01 2019.pdf22 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sayama_Phase-03_30092023.pdf16 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert_Sayama_III_30092023.pdf16 Nov 2023
Certificates of CA (Form 3)File: sayama 03.pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 Sayama Phase 3 - signed final.pdf30 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert_Sayama_III 31032023.pdf10 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert_Sayama_III_30062023.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- Sayama 3.pdf8 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2023-06-30_Architect Certificate_03.pdf7 Aug 2023
Certificates of CA (Form 3)File: HDO - SAYAMA 03 - 034.pdf7 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sayama_Phase-3.pdf2 May 2023
Certificates of CA (Form 3)File: Sayama 3.pdf2 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert Sayama III 31122022.pdf25 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase-3 Architect Certificate.pdf31 Jan 2023
Certificates of CA (Form 3)File: Sayama 3 0001.pdf31 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sayama 3.pdf12 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert Sayama 3.pdf12 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: CA Certificates - Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III compressed.pdf12 Jan 2023
Certificates of CA (Form 3)File: SAYAMA 3 PBPL.pdf12 Jan 2023
Certificates of CA (Form 3)File: Sayama III.pdf12 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sayama 3.pdf1 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sayama Phase 03.pdf8 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate sayama Phase 03.pdf8 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert Sayama III.pdf8 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Cert_Sayama_III.pdf7 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sayama phase 3.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Form 5 Sayama 3.pdf5 Aug 2021
Details of Restarting of Construction work post lockdownFile: Sayama Phase 3 - REPORT.pdf14 Jul 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SAYAMA PHASE 3.pdf27 Jan 2020
Certificates of CA (Form 5)File: Sayama Phase 3 PBL_-Form_-5.pdf22 Nov 2018
Proforma of Allotment letterFile: RERA Agreement Sayama 3.pdf8 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: LONAWALA_CC_09-10-2013.PDF7 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: SANCTION.PDF23 Feb 2018
Details of encumbrancesFile: Details of Encumbrances - revision.pdf10 Nov 2017
Declaration in FORM BFile: Declaration Sayama 3.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Sayama 3.PDF26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate SAYAMA 3.PDF22 Jul 2017
Layout approvalFile: Sanction layout.pdf20 Jul 2017
Building plan approvalFile: SANCTION.PDF20 Jul 2017
Copy of the legal title reportFile: Title Report.PDF20 Jul 2017
Details of encumbrancesFile: Details of Encumbrances.pdf20 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction layout.pdf20 Jul 2017
Building Plan Approval (IOD)File: SANCTION.PDF20 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Sayama 3.pdf20 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf20 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Hometown Part CKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2016Late, Apr 2017
Aldea AnnexoAldea Annexo Next to Hotel Vits Nr Balewadi Stadium Mhalunge Pune 411045129CompletedDec 2016Late, Apr 2017
Hometown Part BKasarvadavali Ghodbunder Road Thane west 400615159CompletedAug 2014Late, Jan 2015
Hometown Part AKasarvadavali Ghodbunder Road Thane west 400615176CompletedJun 2013Late, Nov 2013
Puranik City Part AKasarvadavali Ghodbunder Road Thane west 400615108CompletedDec 2012Late, Feb 2013
Puranik City Part BKasarvadavali Ghodbunder Road Thane west 40061580CompletedDec 2011Late, Apr 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sayama Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lonavala (M Cl)13,700+ in Pune

2 kmSayama Phase 3Completed 2Lapsed / revoked 3Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: Puranik Builders Limited

Puranik Builders Limited has 20 registrations on MahaRERA, including Aldea Annexo -C1 and Rumahbali Phase 2. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sayama Phase 3 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sayama Phase 3?

The registered promoter entity is Puranik Builders Limited, a company as per the filing. Its CIN U99999MH1990PLC056451 and GSTIN 27AABCP0109R1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sayama Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sayama Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sayama Phase 3?

The professionals named in the filing: Architect: Vastushilpa Associates; Architect: G A Design; Architect: Unique Planners; Engineer: J W Consultants LLP; Engineer: Sagar Abnave; Chartered Accountant: HDO & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sayama Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sayama Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sayama Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.