ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / SAWANGI CITY

Registered No litigation declared Residential / Group Housing project

SAWANGI CITY

By JAYESH INFRA

RG-MH-15989 · RERA P51500050204 · Last updated on MahaRERA portal: 7 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 55Construction stages doneacross 5 buildings; furthest along: Sanitary Fittings within the flats /..., 20%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SAWANGI CITY is a Residential / Group Housing project by JAYESH INFRA in Aurangabad, Maharashtra, registered with MahaRERA as P51500050204 on 21 Mar 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameSAWANGI CITY
  • TypeResidential / Group Housing
  • Location
    • JALGAON ROAD
    • PLOT NO 259 GUT NO 31 VILLAGE SAWANGI AURANGABAD
    • Sawangi
    • Aurangabad
    • 431001
  • Pincode431001
  • RERA no.P51500050204
  • ReraGenie IDRG-MH-15989

Builder

  • NameJAYESH INFRA
  • Entity typePartnership
  • PartnersIMTIYAZ SARDAR KHAN, SANDEEP DAULATRAO BORSE, ABHIJIT BHASKARRAO DESHMUKH, AMIT LAXMANRAO BHOSALE, MAHENDRA RAMESHCHAND METHI, PANKAJ PANJABRAO CHAVAN, SATISH LIMBAJI METE, BABASHEB RAGHUNATH SABLE, SUBHASH BABURAO PALASKAR, ANIL DAULATRAO BORSE, JAGANNATH VAIJINATH KALE, PRAVIN PANDURANG CHAVAN and 3 more

Key dates

this monthRegisteredMar 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Mar 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPE ROW HOUSENA20000
B TYPE ROW HOUSENA20000
C TYPE FLATNA50000
D TYPE FLATNA50000
E TYPE FLATNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 7 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 20%.

A TYPE ROW HOUSE47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B TYPE ROW HOUSE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C TYPE FLAT0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D TYPE FLAT0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E TYPE FLAT0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed498

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots498
Open Space498
BuildingOpen SpaceTotal
A TYPE ROW HOUSE344344
B TYPE ROW HOUSE1313
C TYPE FLAT4747
D TYPE FLAT4747
E TYPE FLAT4747

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,647 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI20346.78
Proposed, not sanctioned13,665 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 18 GUT NO 107 AJINKYA PLAZA BEED BY PASS ROAD AURANGABAD 431001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHANANJAY DOIFODE
EngineerABHAY S PATIL
Chartered AccountantV R JAJU AND CON
PartnerRole in project
JAYESH INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARTITECEH CERTFICATE 3112024.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTFICATE 3112024.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTFICATE 31122024.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: BOOKING INVENTORY 31202024.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: artitece certifcate 31032024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: artitech certificate 30062024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: artiteiceh certificate 30092024.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 31032024.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 30062024.pdf18 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certifcate 30092024.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 31032024.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineering certificate 300062024.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 30092024.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: BOOKING INVENTORY 310332024.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: BOOKING INVENTORY 30062024.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: BOOKING INVENTORY 30092024.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: artiteceh certificate 3062023.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: artieceh certificate 3092023.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: artiteceh certificate 31122023.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certifitcae 3062023.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate 3092023.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate 31122023.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca centritifte 30092023.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate 3062023.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate 31122023.pdf20 Mar 2024
Building plan approvalFile: PLAN 01.pdf19 Mar 2024
Building plan approvalFile: PLAN 02.pdf19 Mar 2024
Building plan approvalFile: PLAN 03.pdf19 Mar 2024
Building plan approvalFile: PLAN 04.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 01.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 02.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 03.pdf19 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN 04.pdf19 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION.pdf19 Mar 2024
Disclosure of sold/ booked inventoryFile: booking inventory 31122023.pdf19 Mar 2024
Disclosure of sold/ booked inventoryFile: DocScanner Nov 24, 2023 12-53 PM.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: inventory.pdf24 Nov 2023
Other - TechnicalFile: form d.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate.pdf17 Mar 2023
Proforma of Agreement for saleFile: AFS.pdf17 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 11.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 12.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 13.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 5.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 7.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 8.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 9.pdf15 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 10.pdf15 Mar 2023
Details of encumbrances concerned to FinanceFile: self declaration encumbrnc.pdf11 Mar 2023
Details of encumbrances concerned to LegalFile: self declaration encumbrnc.pdf11 Mar 2023
CERSAI detailsFile: cresai.pdf11 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser interest.pdf11 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER SAWANGI CITY N.pdf11 Mar 2023
Layout approvalFile: LAY OUT.pdf6 Mar 2023
Building plan approvalFile: 01-04.pdf6 Mar 2023
Building plan approvalFile: 02-04.pdf6 Mar 2023
Building plan approvalFile: 03-04.pdf6 Mar 2023
Building plan approvalFile: 04-04.pdf6 Mar 2023
PAN CardFile: pan.pdf6 Mar 2023
Copy of the legal title reportFile: SEARCH REPORT PDF.pdf6 Mar 2023
Copy of Layout Approval (in case of layout)File: LAY OUT.pdf6 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 01-04.pdf6 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 02-04.pdf6 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 03-04.pdf6 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 04-04.pdf6 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION.pdf6 Mar 2023
Declaration about Commencement CertificateFile: declaration abour commence certificate.pdf6 Mar 2023
Declaration in FORM BFile: Form B.pdf6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate.pdf6 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf6 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser interest 1.pdf6 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser interest.pdf6 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A bank account.pdf6 Mar 2023
Deviation Report with respect to Allotment letterFile: no deviation alotment.pdf6 Mar 2023
Deviation Report with respect to model copy of AgreementFile: no dveation ats.pdf6 Mar 2023

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SAWANGI CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 259 GUT NO 31 VILLAGE SAWANGI AURANGABAD1,400+ in Aurangabad

Builder: JAYESH INFRA

JAYESH INFRA has 1 registration on MahaRERA, including SAWANGI CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SAWANGI CITY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAWANGI CITY?

The registered promoter entity is JAYESH INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAWANGI CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAWANGI CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAWANGI CITY?

The professionals named in the filing: Architect: DHANANJAY DOIFODE; Engineer: ABHAY S PATIL; Chartered Accountant: V R JAJU AND CON. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAWANGI CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAWANGI CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAWANGI CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.