Home / Browse projects / Satara, Maharashtra / Satara Central
Satara Central
By Colosseum Developers India LLP
RG-MH-64496 · RERA P52700054848 · Last updated on MahaRERA portal: 17 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Satara Central is a Commercial project by Colosseum Developers India LLP in Satara, Maharashtra, registered with MahaRERA as P52700054848 on 15 Feb 2024. Possession is promised by 31 May 2028.
At a glance
Project
- NameSatara Central
- TypeCommercial
- Location
- Godoli
- Satara
- Godoli (CT)
- 415002
- Pincode415002
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700054848
- ReraGenie IDRG-MH-64496
Builder
- NameColosseum Developers India LLP
- Entity typePartnership
- PartnerSunita Arun Shinde
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2024
- Promised completion31 May 2028
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rajebhosale Satara Central | NA | 6 | 5 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Rajebhosale Satara Central: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed376
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Gulab Dinkar Bhosale | Godoli (CT) | Satara |
| Chandrakant Dinkar Bhosale | Godoli (CT) | Satara |
| Malan Hirajirao Bhosale | Godoli (CT) | Satara |
| Leela Raghunath Rajebhosale | Godoli (CT) | Satara |
| Satish Raghunath Rajebhosale | Godoli (CT) | Satara |
| Suresh Raghunath Rajebhosale | Godoli (CT) | Satara |
| Vijay Laxmanrao Bhosale | Godoli (CT) | Satara |
| Anil Laxmanrao Bhosale | Godoli (CT) | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sourabh Mahamulkar |
| Engineer | Pramod Kuvar |
| Chartered Accountant | CA Priyesh Jain |
| Chartered Accountant | nilesh Raut |
| Partner | Role in project |
|---|---|
| Colosseum Developers India LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Dec 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2028
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1 Architect Certificate 31032026.pdf | 17 May 2026 |
| Form 2File: Form-2 Engineer Certificate 31032026.pdf | 17 May 2026 |
| Form 3File: Form-3 CA Certificate 31032026.pdf | 17 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31032026.pdf | 17 May 2026 |
| Form 1File: Form-1 Architect Certificate 30092025.pdf | 13 Apr 2026 |
| Form 2File: Form-2 Engineers Certificate 30092025.pdf | 13 Apr 2026 |
| Form 3File: Form-3 CA Certificate 30092025.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092025.pdf | 13 Apr 2026 |
| Form 1File: Form-1 Architect Certificate 31122025.pdf | 13 Apr 2026 |
| Form 2File: Form-2 Engineers Certificate 31122025.pdf | 13 Apr 2026 |
| Form 3File: Form-3 CA Certificate 31122025.pdf | 13 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122025.pdf | 13 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form-2A 31032024.pdf | 29 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form-2A 31032025.pdf | 29 Dec 2025 |
| Form 1File: Form-1 Architect Certificate 31122024.pdf | 25 Nov 2025 |
| Form 2File: Form-2 Engineer Certificate 31122024.pdf | 25 Nov 2025 |
| Form 3File: Form-3 CA Certificate 31122024.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122024.pdf | 25 Nov 2025 |
| Form 1File: Form-1 Architect Certificate 31032025.pdf | 25 Nov 2025 |
| Form 2File: Form-2 Engineer's Certificate 31032025.pdf | 25 Nov 2025 |
| Form 3File: Form-3 CA certificate 31032025.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032025.pdf | 25 Nov 2025 |
| Form 1File: Form-1 Architect Certificate 30062025.pdf | 25 Nov 2025 |
| Form 2File: Form-2 Engineer's Certificate 30062025.pdf | 25 Nov 2025 |
| Form 3File: Form 3 CA Certificate 30062025.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062025.pdf | 25 Nov 2025 |
| Form 1File: Form-1 Architect Certificate 31032024.pdf | 13 Sep 2025 |
| Form 2File: Form-2 Engineers Certificate 31032024.pdf | 13 Sep 2025 |
| Form 3File: Form-3 CA Certificate 31032024.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory 31032024.pdf | 13 Sep 2025 |
| Form 1File: Form-1 Architect Certificate 30062024.pdf | 13 Sep 2025 |
| Form 2File: Form-2 Engineers Certificate 30062024.pdf | 13 Sep 2025 |
| Form 3File: Form-3 CA Certificate 30062024.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory 30062024.pdf | 13 Sep 2025 |
| Form 1File: Form-1 Architect Certificate 30092024.pdf | 13 Sep 2025 |
| Form 2File: Form-2 Engineer Certificate 30092024.pdf | 13 Sep 2025 |
| Form 3File: Form-3 CA Certificate 30092024.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory 30092024.pdf | 13 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032025 v4.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122024.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062024.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092024.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31122024.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092024.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122024.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30062024.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate 30062024.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate 27082024.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024.pdf | 19 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-3 CA Certificate 30062024.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory 30062024.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory 30092024.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate 27082024.pdf | 19 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024.pdf | 19 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-3 CA Certificate 30062024.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory 30062024.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory 30092024.pdf | 19 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31032024.pdf | 21 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate_page-0001.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate 31032024.pdf | 13 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032024.pdf | 13 Jun 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale-Draft 12022024.pdf | 12 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for Sale 12022024.pdf | 12 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sascon developer 31012024.pdf | 31 Jan 2024 |
| Copy of the legal title reportFile: Legal Title Report 09122023 Revised Compress.pdf | 16 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Authentication Mail.pdf | 16 Jan 2024 |
| Declaration about Commencement CertificateFile: CC Authentication Mail.pdf | 16 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Final LLP Supplymentary Deed 04112023 Compress.pdf | 16 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MCA LLP Form 3.pdf | 16 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MCA LLP Form 4.pdf | 16 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ministry Of Corporate Affairs - MCA Services.pdf | 16 Jan 2024 |
| Other - LegalFile: Final LLP Supplymentary Deed 04112023 Compress.pdf | 16 Jan 2024 |
| Other - TechnicalFile: Final LLP Supplymentary Deed 04112023 Compress.pdf | 16 Jan 2024 |
| Declaration about Commencement CertificateFile: Decalaration abt CC 06012024.pdf | 8 Jan 2024 |
| Other - TechnicalFile: CC Authentication Mail.pdf | 8 Jan 2024 |
| CERSAI detailsFile: CERSAI Search report.pdf | 27 Dec 2023 |
| Copy of the legal title reportFile: Colosseum Developer- Title Report (1) Compressed.pdf | 26 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 11122023.pdf | 23 Dec 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 23 Dec 2023 |
| Building plan approvalFile: NA Order 17012020.pdf | 15 Dec 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Grassland | Sr. No. 15 Kolhewadi Sinhagad Road Pune 411041 | 240 | Completed | Mar 2018 | Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Satara Central on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Satara1,100+ in Satara
Filed coordinates, straight-line distance. 82 registered projects within 2 km.
Sukhodayam Villas
M/s Ultra Urban Greene Realty LLP
YASHWANT ELITE
RAHULDEV PROMOTERS SATARA
KRISHNAKUNJ VIHAR PHASE-3
Pooja Shridhar Kangralkar
SHATAKSHI TOWER
VISHAL DILIP PAWAR
SHREE VIHAR
M/s SHREE SAIDARSHAN DEVELOPERS
SHIVSAMARTH RESIDENCY
MS BHOSALE AND NALAWADE
See every Satara project, with the district possession charts
Builder: Colosseum Developers India LLP
Colosseum Developers India LLP has 1 registration on MahaRERA, including Satara Central. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if Satara Central is delayed beyond 31 May 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Satara Central?
The registered promoter entity is Colosseum Developers India LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Satara Central?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Satara Central?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Satara Central?
The professionals named in the filing: Architect: Sourabh Mahamulkar; Engineer: Pramod Kuvar; Chartered Accountant: CA Priyesh Jain; Chartered Accountant: nilesh Raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Satara Central?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback