Home / Browse projects / Satara, Maharashtra / Satara Central

Registered No litigation declared Commercial project

Satara Central

By Colosseum Developers India LLP

RG-MH-64496 · RERA P52700054848 · Last updated on MahaRERA portal: 17 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
May 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Satara Central is a Commercial project by Colosseum Developers India LLP in Satara, Maharashtra, registered with MahaRERA as P52700054848 on 15 Feb 2024. Possession is promised by 31 May 2028.

At a glance

Project

  • NameSatara Central
  • TypeCommercial
  • Location
    • Godoli
    • Satara
    • Godoli (CT)
    • 415002
  • Pincode415002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700054848
  • ReraGenie IDRG-MH-64496

Builder

  • NameColosseum Developers India LLP
  • Entity typePartnership
  • PartnerSunita Arun Shinde
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 May 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rajebhosale Satara CentralNA65000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Rajebhosale Satara Central: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed376

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots376
Open Space376

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,244 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
Gulab Dinkar BhosaleGodoli (CT)Satara
Chandrakant Dinkar BhosaleGodoli (CT)Satara
Malan Hirajirao BhosaleGodoli (CT)Satara
Leela Raghunath RajebhosaleGodoli (CT)Satara
Satish Raghunath RajebhosaleGodoli (CT)Satara
Suresh Raghunath RajebhosaleGodoli (CT)Satara
Vijay Laxmanrao BhosaleGodoli (CT)Satara
Anil Laxmanrao BhosaleGodoli (CT)Satara

Approvals and building plan

Sanctioning authoritySatara Nagarparishad, Satara
Permissible FSI27855.07
Proposed, not sanctioned12,316 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1st Floor Plot No 421/A CTS No 1071 Gokhale Road Ashoknagar Pune 411016

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSourabh Mahamulkar
EngineerPramod Kuvar
Chartered AccountantCA Priyesh Jain
Chartered Accountantnilesh Raut
PartnerRole in project
Colosseum Developers India LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2028

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Architect Certificate 31032026.pdf17 May 2026
Form 2File: Form-2 Engineer Certificate 31032026.pdf17 May 2026
Form 3File: Form-3 CA Certificate 31032026.pdf17 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 31032026.pdf17 May 2026
Form 1File: Form-1 Architect Certificate 30092025.pdf13 Apr 2026
Form 2File: Form-2 Engineers Certificate 30092025.pdf13 Apr 2026
Form 3File: Form-3 CA Certificate 30092025.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092025.pdf13 Apr 2026
Form 1File: Form-1 Architect Certificate 31122025.pdf13 Apr 2026
Form 2File: Form-2 Engineers Certificate 31122025.pdf13 Apr 2026
Form 3File: Form-3 CA Certificate 31122025.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122025.pdf13 Apr 2026
Form 2A (FY 2023-2024)File: Form-2A 31032024.pdf29 Dec 2025
Form 2A (FY 2024-2025)File: Form-2A 31032025.pdf29 Dec 2025
Form 1File: Form-1 Architect Certificate 31122024.pdf25 Nov 2025
Form 2File: Form-2 Engineer Certificate 31122024.pdf25 Nov 2025
Form 3File: Form-3 CA Certificate 31122024.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122024.pdf25 Nov 2025
Form 1File: Form-1 Architect Certificate 31032025.pdf25 Nov 2025
Form 2File: Form-2 Engineer's Certificate 31032025.pdf25 Nov 2025
Form 3File: Form-3 CA certificate 31032025.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032025.pdf25 Nov 2025
Form 1File: Form-1 Architect Certificate 30062025.pdf25 Nov 2025
Form 2File: Form-2 Engineer's Certificate 30062025.pdf25 Nov 2025
Form 3File: Form 3 CA Certificate 30062025.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062025.pdf25 Nov 2025
Form 1File: Form-1 Architect Certificate 31032024.pdf13 Sep 2025
Form 2File: Form-2 Engineers Certificate 31032024.pdf13 Sep 2025
Form 3File: Form-3 CA Certificate 31032024.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 31032024.pdf13 Sep 2025
Form 1File: Form-1 Architect Certificate 30062024.pdf13 Sep 2025
Form 2File: Form-2 Engineers Certificate 30062024.pdf13 Sep 2025
Form 3File: Form-3 CA Certificate 30062024.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30062024.pdf13 Sep 2025
Form 1File: Form-1 Architect Certificate 30092024.pdf13 Sep 2025
Form 2File: Form-2 Engineer Certificate 30092024.pdf13 Sep 2025
Form 3File: Form-3 CA Certificate 30092024.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory 30092024.pdf13 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032025 v4.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122024.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31122024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 31122024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30062024.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate 30062024.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate 27082024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-3 CA Certificate 30062024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 30062024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 30092024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architects Certificate 27082024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-3 CA Certificate 30062024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 30062024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 30092024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 31032024.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate_page-0001.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate 31032024.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31032024.pdf13 Jun 2024
Proforma of Agreement for saleFile: Agreement for Sale-Draft 12022024.pdf12 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for Sale 12022024.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sascon developer 31012024.pdf31 Jan 2024
Copy of the legal title reportFile: Legal Title Report 09122023 Revised Compress.pdf16 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Authentication Mail.pdf16 Jan 2024
Declaration about Commencement CertificateFile: CC Authentication Mail.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Final LLP Supplymentary Deed 04112023 Compress.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MCA LLP Form 3.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MCA LLP Form 4.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ministry Of Corporate Affairs - MCA Services.pdf16 Jan 2024
Other - LegalFile: Final LLP Supplymentary Deed 04112023 Compress.pdf16 Jan 2024
Other - TechnicalFile: Final LLP Supplymentary Deed 04112023 Compress.pdf16 Jan 2024
Declaration about Commencement CertificateFile: Decalaration abt CC 06012024.pdf8 Jan 2024
Other - TechnicalFile: CC Authentication Mail.pdf8 Jan 2024
CERSAI detailsFile: CERSAI Search report.pdf27 Dec 2023
Copy of the legal title reportFile: Colosseum Developer- Title Report (1) Compressed.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 11122023.pdf23 Dec 2023
Proforma of Allotment letterFile: Allotment Letter.pdf23 Dec 2023
Building plan approvalFile: NA Order 17012020.pdf15 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GrasslandSr. No. 15 Kolhewadi Sinhagad Road Pune 411041240CompletedMar 2018Mar 2018

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Satara Central on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Satara1,100+ in Satara

2 kmSatara CentralCompleted 21Lapsed / revoked 27Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: Colosseum Developers India LLP

Colosseum Developers India LLP has 1 registration on MahaRERA, including Satara Central. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Satara Central is delayed beyond 31 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Satara Central?

The registered promoter entity is Colosseum Developers India LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Satara Central?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Satara Central?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Satara Central?

The professionals named in the filing: Architect: Sourabh Mahamulkar; Engineer: Pramod Kuvar; Chartered Accountant: CA Priyesh Jain; Chartered Accountant: nilesh Raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Satara Central?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Satara Central. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Satara Central to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.