SARVESHWARA
By ARVIND JOG FORESIGHTS (OPC) PVT. LTD.
RG-MH-10527 · RERA P52800013528 · Last updated on MahaRERA portal: 3 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 17 months past the filed date
- Completion date moved by 41 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARVESHWARA is a Residential / Group Housing project by ARVIND JOG FORESIGHTS (OPC) PVT. LTD. in Ratnagiri, Maharashtra, registered with MahaRERA as P52800013528 on 9 Oct 2017. Possession was promised by 16 May 2025 and is now 17 months past that date. The completion date has moved by 41 months from the original filing. 0 of the 16 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSARVESHWARA
- TypeResidential / Group Housing
- Location
- S.NO.-46
- H.NO.-7/5
- PLOT NO.-7
- brahmanwadi
- Dapoli
- Ratnagiri
- 415712
- Pincode415712
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800013528
- ReraGenie IDRG-MH-10527
Builder
- NameARVIND JOG FORESIGHTS (OPC) PVT. LTD.
- Entity typeCompany
- ChairpersonARVIND VIDYADHAR JOG
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Oct 2017
- Promised completion16 May 2025
- Revised completionRevised to 16 May 2025 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed118 files
Current status
Figures as on 3 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SARVESHWARA | NA | 6 | 6 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
SARVESHWARA: 47% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 3 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
| Society Room | Yes | 0% |
Parking filed41
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KAMAKSHI P KOPARKAR |
| Chartered Accountant | S A Joshi |
| Partner | Role in project |
|---|---|
| ARVIND JOG FORESIGHTS (OPC) PVT. LTD. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID PROBLEM AND MATERIAL AND LABOUR PROBLEMS
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Architect cer.pdf | 3 Jan 2026 |
| Form 2File: Form 2 Engineer cer.pdf | 3 Jan 2026 |
| Form 3File: Form 3 CA Certificate.pdf | 3 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf | 3 Jan 2026 |
| Form 1File: Form 1 Architect cer.pdf | 3 Jan 2026 |
| Form 2File: Form 2 Engineer cer.pdf | 3 Jan 2026 |
| Form 3File: Form 3 CA certifiacte.pdf | 3 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf | 3 Jan 2026 |
| Form 5 (FY 2024-2025)File: Annual Report 2024-25.pdf | 3 Jan 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 2 - 2.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 1.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - 2.pdf | 13 Aug 2024 |
| Declaration in FORM BFile: Revised Form B.pdf | 12 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 12 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 23-24 - new.pdf | 12 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 12 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY OF SOLD UNSOLD.pdf | 27 Jun 2024 |
| Certificates of CA (Form 3)File: SARVESHWARA CA MAY 24.pdf | 27 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 28.pdf | 3 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 24.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 25.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 26.pdf | 4 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 27.pdf | 4 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 24.pdf | 15 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 25.pdf | 15 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 26.pdf | 15 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 27.pdf | 15 Feb 2024 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 24.pdf | 14 Feb 2024 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 25.pdf | 14 Feb 2024 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 26.pdf | 14 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY22-23.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 20.pdf | 11 Apr 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 21.pdf | 11 Apr 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 22.pdf | 11 Apr 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 23.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY21-22.pdf | 11 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 20.pdf | 6 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 21.pdf | 6 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 22.pdf | 6 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 23.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 20.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 21.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 22.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 23.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 24.pdf | 6 Apr 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 13.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 14.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 15.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 16.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 17.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 18.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: SARVESHWARA CA 19.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 FY17-18.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY18-19.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY19-20.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY20-21.pdf | 24 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 15.pdf | 6 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 16.pdf | 6 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 17.pdf | 6 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 18.pdf | 6 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 19.pdf | 6 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 15.pdf | 6 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 16.pdf | 6 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 17.pdf | 6 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 18.pdf | 6 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SARVESHWARA Eng 19.pdf | 6 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 1.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 2.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 3.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 4.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 5.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 6.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 7.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 8.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 9.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 10.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 11.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SARVESHWARA Arch 12.pdf | 20 Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SARVESHWARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near brahmanwadi1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
Cape of Bliss Phase 1A
HOABL Management LLP
VIAA VISION
VIAA VISION
COASTAL BREEZE
UNIVERSAL PROPERTIES
VRUNDAVAN
EMPIRE REALTORS AND DEVELOPERS
Cape of Bliss Phase I
Lodha Management LLP
See every Ratnagiri project, with the district possession charts
Builder: ARVIND JOG FORESIGHTS (OPC) PVT. LTD.
ARVIND JOG FORESIGHTS (OPC) PVT. LTD. has 1 registration on MahaRERA, including SARVESHWARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that SARVESHWARA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SARVESHWARA is delayed beyond 16 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARVESHWARA?
The registered promoter entity is ARVIND JOG FORESIGHTS (OPC) PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARVESHWARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARVESHWARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARVESHWARA?
The professionals named in the filing: Architect: KAMAKSHI P KOPARKAR; Chartered Accountant: S A Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARVESHWARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback