Red flags

  • Registration lapsed
  • Possession 6 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 88 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
19 of 33Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

saroj sadan CHSL is a Residential / Group Housing project by Pritesh Damji Savla in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012908 on 7 Sep 2017. Possession was promised by 15 Apr 2026 and is now 6 months past that date. The completion date has moved by 88 months from the original filing. 14 of the 33 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • Namesaroj sadan CHSL
  • TypeResidential / Group Housing
  • Location
    • Daftari Road
    • Kurar
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800012908
  • ReraGenie IDRG-MH-20860

Builder

  • NamePritesh Damji Savla
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

6 months past promisethis monthRegisteredSep 2017First promiseDec 2018Revised toApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Sep 2017
  • Promised completion15 Apr 2026
  • Revised completionRevised to 15 Apr 2026 (originally 12 Dec 2018)
  • Buildings1 building record
  • Documents filed132 files

Current status

42%14 of 33 units booked
100.0%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHRI SAROJ SADAN CHSLNA9933033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHRI SAROJ SADAN CHSL: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area620 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on20 Feb 2026

Approvals and building plan

Sanctioning authorityBombay Muncipal Cooperation
Permissible FSI907.57
Proposed, not sanctioned819 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSuncity Theatres, Mumbai-57
Estimated costRs 5.60 cr
Cost incurredRs 5.60 cr
Work done100.0%
BuildingWingEstimatedIncurred
SHRI SAROJ SADAN CHSLNARs 4.80 crRs 4.80 cr
-NARs 80.45 lakhRs 80.45 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASIK P HINGOO ASSOCIATES
ArchitectRASIK HINGOO
EngineerSHAH STRUCTURALS PVT LTD.
EngineerMOHAN MANEKAR
EngineerRAKESH SINGH
Chartered AccountantJAYAVANT R KANASE
Chartered AccountantVIVEK THAR
Chartered AccountantAJAY JHANWAR
PartnerRole in project
Pritesh Damji Savla-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800006169Dec 2018 → Dec 2021

Reason as filed by the promoterReason for delay in completion of project is due to delay caused by supply of materials and services by contractors, market conditions of the Real Estate sector and Prolonged delay in obtaining necessary delay from the Authority. However, we shall endeavor completion of project within extended duration of 24 months.

EXT51800011998Dec 2018 → Dec 2023

Reason as filed by the promoterSir, we are not able to complete the project on time due to pending approvals and Covid pandemic. We have initial approvals till 4th floor which has completed and we immediate applied for further approvals on 13-09-2017 to the authority which was rejected on 19-06-2018 as Hon’ble Supreme Court issued guidelines for issuing building permits order to the Authority in SPL (Civil) No. D23708/2017 in Deonar Dumping Ground Case. The authority hold all the further approvals and issued guidelines to comply before submitting for further approvals which took long time. Then after we have completed all t

EXT51800018077Dec 2018 → Dec 2024

Reason as filed by the promoterRespected Sir/Madam, This is to Inform you that project “SHRI SAROJ SADAN CHSL” developed by M/s. Vini Developers has been granted registration under MahaRERA vide registration no. dated 31.08.2017, and the completion of work extension was granted till 31.12.2023. We had initial approvals till 4th floor which was completed and after that we immediate applied for further approvals on 13-09-2017 to the authority which was rejected on 19-06-2018 as Hon’ble Supreme Court issued guidelines for issuing building permits order to the Authority in SPL (Civil) No. D23708/2017 in Deonar Dumping Ground Ca

EXT51800025758Dec 2018 → Dec 2025

Reason as filed by the promoterThe delay in project completion is primarily due to the application of new directives from the Ministry of Defence, which introduced certain constraints related to the Central Ordnance Depot (COD). These constraints were beyond our control and significantly impacted the project timeline. However, the government has announced that these restrictions will be lifted in December 2024, at which point we anticipate resuming normal progress and completing the project as per the revised schedule

EA03062621216Dec 2018 → Apr 2026

Reason as filed by the promoterThe delay in completion of the project was primarily caused by the implementation of new directives issued by the Ministry of Defence, which imposed certain restrictions concerning the Central Ordnance Depot (COD). These restrictions were beyond our control and had a significant impact on the project schedule and progress. Subsequently, the Government announced that the said restrictions would be lifted in December 2024, enabling the project to resume normal construction activities thereafter. The project has since been completed, and the Full Occupancy Certificate was issued by the competent

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000196072Mr. Rajesh Raghavji ShahM/s. VINI DEVELOPERS17/02/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A March 2026.pdf20 Aug 2026
Withdrawal Update Form 1File: form1.pdf18 Aug 2026
Withdrawal Update Form 1File: form1.pdf18 Aug 2026
Withdrawal Update Form 1File: form1.pdf18 Aug 2026
Withdrawal Update Form 2File: form2.pdf18 Aug 2026
Withdrawal Update Form 2File: form2.pdf18 Aug 2026
Withdrawal Update Form 2File: form2.pdf18 Aug 2026
Withdrawal Update Form 3File: form331032026.pdf18 Aug 2026
Withdrawal Update Form 3File: form3final.pdf18 Aug 2026
Withdrawal Update Form 3File: form315042026.pdf18 Aug 2026
Withdrawal Update Form 1File: FORM 1 SEPTEMBER 2025.pdf3 Jun 2026
Withdrawal Update Form 1File: FORM 1 DECEMBER 2025.pdf3 Jun 2026
Withdrawal Update Form 2File: Form2.pdf3 Jun 2026
Withdrawal Update Form 2File: Form2 final upload.pdf3 Jun 2026
Withdrawal Update Form 3File: form 3 final.pdf3 Jun 2026
Withdrawal Update Form 3File: Form 3December Final.pdf3 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A Shri Saroj Sadan CHSL March 2025.pdf6 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE JUNE 2025.pdf29 Sep 2025
Form 2File: Form2 (2).pdf29 Sep 2025
Form 3File: Form 3 Saroj Sadan CHSL June 2025.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Inventory Final.pdf29 Sep 2025
Form 1File: Form 1.pdf26 May 2025
Form 2File: Form -2.pdf26 May 2025
Form 3File: Form -3.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory.pdf26 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE CERTIFICATE.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Signed.pdf1 Feb 2025
Certificates of CA (Form 3)File: Signed_compressed.pdf1 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 as on 31-12-2024 shri saroj sadan Revised cost Signed.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Page 1_Page 2_merged.pdf1 Feb 2025
CERSAI detailsFile: Undertaking Final.pdf1 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf1 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATIONS.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 Final.pdf1 Feb 2025
Declaration in FORM BFile: Form B.pdf24 Dec 2024
Certificates of CA (Form 3)File: Final Form 3.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 march 24.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 24.pdf20 Dec 2024
Certificates of CA (Form 3)File: saroj Sadan march-2024_compressed.pdf30 Nov 2024
Certificates of CA (Form 3)File: Saroj Sadan-June-2024_compressed.pdf30 Nov 2024
Certificates of CA (Form 3)File: Saroj sadan Sep-2024_compressed.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SHRI SAROJ SADAN 30-06-2024.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SHRI SAROJ SADAN 30-09-2024.pdf30 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SHRI SAROJ SADAN CHSL 31-03-2024.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: Saroj Disclouser-Sep-2024.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: 3112 2023.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: 31 03 2024.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: 30 06 2024.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A 12082019.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2a 05112019.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2a 07022020.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2a 15082020.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2a 15082020.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2a 15082020.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A 08112020.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A 24012021.pdf5 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2A 01052021.pdf5 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 Signed_compressed.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM -2a 08072021.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form - 2a 12102021_compressed.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form - 2a 09012022.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form- 2a 15042022_compressed.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form - 2a 10072022.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form - 2a 10072022.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form - 2a 09102022.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form - 2a 11012023_compressed.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form - 2a 11012023-4-6.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form - 5 signed 2021-2022.pdf4 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form - 5 signed 2022-23.pdf4 Dec 2023
Certificates of CA (Form 3)File: CA CERTIFICATE FORM 3 -SHRI SAROJ SADAN CHSL.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: annual report - 2021-22.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual report - 2022-2023.pdf1 Dec 2023
Disclosure of sold/ booked inventoryFile: disclosure of flats - 30112023.pdf30 Nov 2023
Declaration in FORM BFile: Affidavit cum Declaration Rose Blossom CHSL.pdf9 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 sarojsadan chsl.pdf9 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate for Quality Assurance.pdf9 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate for Quality Assurance.pdf9 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate for Quality Assurance.pdf9 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate for Quality Assurance.pdf9 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate for Quality Assurance.pdf9 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
RAM KUTIRNATWAR NAGAR ROAD NO 3JOGESHWARI EAST1CompletedOct 2008Late, Dec 2008

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 88 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep saroj sadan CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurar6,700+ in Mumbai Suburban

2 kmsaroj sadan CHSLCompleted 137Lapsed / revoked 92Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 383 registered projects within 2 km.

Builder: Pritesh Damji Savla

Pritesh Damji Savla has 2 registrations on MahaRERA, including saroj sadan CHSL and Bhagwati Ashish. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that saroj sadan CHSL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if saroj sadan CHSL is delayed beyond 15 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of saroj sadan CHSL?

The registered promoter entity is Pritesh Damji Savla, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in saroj sadan CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against saroj sadan CHSL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for saroj sadan CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at saroj sadan CHSL?

The professionals named in the filing: Architect: RASIK P HINGOO ASSOCIATES; Architect: RASIK HINGOO; Engineer: SHAH STRUCTURALS PVT LTD.; Engineer: MOHAN MANEKAR; Engineer: RAKESH SINGH; Chartered Accountant: JAYAVANT R KANASE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in saroj sadan CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About saroj sadan CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save saroj sadan CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.