ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SARASWATI PARADISE

Registered No litigation declared Others project

SARASWATI PARADISE

By METRO DWELLERS PRIVATE LIMITED

RG-MH-47213 · RERA P51800051636 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
14 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 70%
165 of 235Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

SARASWATI PARADISE is a Others project by METRO DWELLERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051636 on 27 Jun 2023. Possession is promised by 31 Dec 2027. 70 of the 235 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameSARASWATI PARADISE
  • TypeOthers
  • Location
    • AT THE CORNER OF RRT ROAD
    • P K ROAD & ZAVER ROAD
    • MULUND WEST
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051636
  • ReraGenie IDRG-MH-47213

Builder

  • NameMETRO DWELLERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsANANDKUMAR HIRALAL DARGAR, ANITA ANANDKUMAR DARGAR, HIRALAL LAXMINARAYAN DARGAR, VINODKUMAR HIRALAL DARGAR, LEENA VINODKUMAR DARGAR
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed146 files

Current status

30%70 of 235 units booked
37.7%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SARASWATI PARADISE A WING AND COMMNA412311720137
SARASWATI PARADISE B WINGNA321398098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.

SARASWATI PARADISE A WING AND COMM81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
SARASWATI PARADISE B WING81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed305

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots305
Closed/Covered305
BuildingClosed/CoveredTotal
SARASWATI PARADISE A WING AND COMM203203
SARASWATI PARADISE B WING102102

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,271 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SWATI SUVIDHA CO OP HSG SOC LTDMulundMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI14468.62
Proposed, not sanctioned9,854 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 5 6 7 Jalaram Ashish Society Devidayal Road Mulund West Opp Raj Hospital Maharashtra 400080
Estimated costRs 135.24 cr
Cost incurredRs 50.97 cr
Work done37.69%
BuildingWingEstimatedIncurred
SARASWATI PARADISE A WING AND COMMNARs 68.72 crRs 30.58 cr
SARASWATI PARADISE B WINGNARs 45.82 crRs 20.39 cr
-NARs 20.70 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPECO ARCHITECT
ArchitectXAR WORKSHOP LLP
EngineerDeepak Yadav
EngineerJohn Abraham
Chartered AccountantAmit bothra
Chartered AccountantGopal Harsh Harsh
Chartered AccountantARVIND HEMRAJ NAGDA
PartnerRole in project
METRO DWELLERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-Q1 FY 2026-27_Saraswati Paradise.pdf21 Aug 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2-Q1 FY 2026-27_Saraswati Paradise.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf21 Aug 2026
Withdrawal Update Form 1File: Form 1-Q1 FY 2026-27_Saraswati Paradise.pdf20 Aug 2026
Withdrawal Update Form 2File: Form 2-Q1 FY 2026-27_Saraswati Paradise.pdf20 Aug 2026
Withdrawal Update Form 3File: Form 3-Q1 FY 2026-27_Saraswati Paradise (1).pdf20 Aug 2026
Withdrawal Update Form 1File: form-1 Q4.pdf17 Aug 2026
Withdrawal Update Form 2File: form 2 Q4.pdf17 Aug 2026
Withdrawal Update Form 3File: Form 3-Q4 FY 2025-26 (1).pdf17 Aug 2026
Withdrawal Update Form 1File: 7_Form 1 Q3 of FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 2File: 7_Form 2 Q3 of FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3 Q3 of FY 2025-26.pdf31 Mar 2026
Withdrawal Update Form 1File: 6_Form 1 Q2 of FY 2025-26.pdf30 Mar 2026
Withdrawal Update Form 1File: 6_Form 1 Q2 of FY 2025-26.pdf30 Mar 2026
Withdrawal Update Form 2File: 6_Form 2 Q2 of FY 2025-26 .pdf30 Mar 2026
Withdrawal Update Form 2File: 6_Form 2 Q2 of FY 2025-26 .pdf30 Mar 2026
Withdrawal Update Form 3File: 6_Form 3 Q2 of FY 2025-26.pdf30 Mar 2026
Withdrawal Update Form 3File: 6_Form 3 Q2 of FY 2025-26.pdf30 Mar 2026
Withdrawal Update Form 1File: 5_Form 1 Q1 of FY 2025-26.pdf26 Mar 2026
Withdrawal Update Form 2File: 5_Form 2 Q1 of FY 2025-26.pdf26 Mar 2026
Withdrawal Update Form 3File: 5_Form 3 Q1 of FY 2025-26.pdf26 Mar 2026
Form 1File: 3_Form 1 Q3 of FY 2024-25.pdf4 Mar 2026
Form 2File: 3_Form 2 Q3 of FY 2024-25.pdf4 Mar 2026
Form 3File: 7_Form 3 Q3 of FY 2024-25.pdf4 Mar 2026
Disclosure of Sold and Booked InventoryFile: 3_Disclosure of Sold Q3 of FY 2024-25.pdf4 Mar 2026
Form 1File: 4_Form 1 Q4 of FY 2024-25.pdf4 Mar 2026
Form 2File: 4_Form 2 Q4 of FY 2024-25.pdf4 Mar 2026
Form 3File: 8_Form 3 Q4 of FY 2024-25.pdf4 Mar 2026
Disclosure of Sold and Booked InventoryFile: 4_Disclosure of Sold Q4 of FY 2024-25.pdf4 Mar 2026
Form 1File: 1_Form 1 Q1 of FY 2024-25.pdf27 Feb 2026
Form 2File: 1_Form 2 Q1 of FY 2024-25.pdf27 Feb 2026
Form 3File: 5_Form 3 Q1 of FY 2024-25.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1_Disclosure of Sold Q1 of FY 2024-25.pdf27 Feb 2026
Form 1File: 2_Form 1 Q2 of FY 2024-25.pdf27 Feb 2026
Form 2File: 2_Form 2 Q2 of FY 2024-25.pdf27 Feb 2026
Form 3File: 2_Form 3 Q2 of FY 2023-24.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 2_Disclosure of Sold Q2 of FY 2024-25.pdf27 Feb 2026
Form 1File: MDPL_FORM_1_30062023.pdf30 Jul 2025
Form 2File: MDPL_FPRM_2_30062023.pdf30 Jul 2025
Form 3File: MDPL_FORM_3_30062023.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: INV_DIC300623.pdf30 Jul 2025
Form 1File: MDPL_FORM_1_30092023.pdf30 Jul 2025
Form 2File: MDPL_FORM_2_30092023.pdf30 Jul 2025
Form 3File: MDPL_FORM_3_30092023.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: INV_DIC300623.pdf30 Jul 2025
Form 1File: MDPL_FORM_1_11122023.pdf30 Jul 2025
Form 2File: MDPL_FORM_2_11122023.pdf30 Jul 2025
Form 3File: MDPL_FORM_3_11122023.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: INV_DIC111223.pdf30 Jul 2025
Form 1File: MDPL_FORM_1_31032024.pdf30 Jul 2025
Form 2File: MDPL_FORM_2_31032024.pdf30 Jul 2025
Form 3File: MDPL_FORM_3_31032024.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: INV_DIC310324.pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1SP_MDPL_JUNE_2024.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_SP_MDPL_SEP_2024.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_SP_MDPL_MAR_2024.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3_SP_MDPL_MAR_2023_compressed.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_SP_MDPL_DEC_2023.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_SP_MDPL_MARCH_2024.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY_SP_MDPL_MAR_24.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 Dec 23_Form-1.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: 31 Dec 23_Inventory_11zon.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31 Dec 23_Form-3.pdf8 May 2024
Details of encumbrances concerned to FinanceFile: encrumbranse for loan(capri).pdf17 Apr 2024
Details of encumbrances concerned to LegalFile: encrumbranse for loan(capri).pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_MDPL_30062023.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_MDPL_30092023.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2_MDPL_11122023.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Image_520.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Image_521.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Image_522.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30062023 SIGN.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1 Architect Certificate 30092023 SIGN.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHA RERA FORM 1 Architect Certificate 11122023 SIGN.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: 30 JUN INVENTORY3.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: 30 SEP INVENTORY.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: 11 DEC INVENTORY.pdf2 Mar 2024

How this compares with Mumbai Suburban

30%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARASWATI PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MULUND WEST6,700+ in Mumbai Suburban

2 kmSARASWATI PARADISECompleted 115Lapsed / revoked 96Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 348 registered projects within 2 km.

Builder: METRO DWELLERS PRIVATE LIMITED

METRO DWELLERS PRIVATE LIMITED has 2 registrations on MahaRERA, including GIRIRAJ APARTMENTS and SARASWATI PARADISE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SARASWATI PARADISE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARASWATI PARADISE?

The registered promoter entity is METRO DWELLERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARASWATI PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARASWATI PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARASWATI PARADISE?

The professionals named in the filing: Architect: SPECO ARCHITECT; Architect: XAR WORKSHOP LLP; Engineer: Deepak Yadav; Engineer: John Abraham; Chartered Accountant: Amit bothra; Chartered Accountant: Gopal Harsh Harsh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARASWATI PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARASWATI PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARASWATI PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one