Home / Browse projects / Thane, Maharashtra / SARASWATI DEVI KRUPA
SARASWATI DEVI KRUPA
RG-MH-06555 · RERA P51700053444 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 3 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARASWATI DEVI KRUPA is a Residential / Group Housing project by YOGIRAJ HERITAGE in Thane, Maharashtra, registered with MahaRERA as P51700053444 on 1 Nov 2023. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 27 of the 40 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.
At a glance
Project
- NameSARASWATI DEVI KRUPA
- TypeResidential / Group Housing
- Location
- RAM MANDIR ROAD
- RAM MANDIR ROAD NO 5
- DOMBIVLI
- Kalyan
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700053444
- ReraGenie IDRG-MH-06555
Builder
- NameYOGIRAJ HERITAGE
- Entity typePartnership
- PartnersRASIKLAL VELJI SHAH, HARSSHAD HARISHCHANDRA PATIL, TRUPTI HARSSHAD PATIL
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Nov 2023
- Promised completion31 Jul 2026
- Revised completionNone
- Buildings2 building records
- Documents filed71 files
Current status
Figures as on 26 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SARASWATI KRUPA-BUILDING No 1 | NA | 8 | 7 | 20 | 0 | 20 |
| DEVI KRUPA-BUILDING No 2 | NA | 8 | 7 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
SARASWATI KRUPA-BUILDING No 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DEVI KRUPA-BUILDING No 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SARASWATI KRUPA-BUILDING No 1 | 19 | 19 |
| DEVI KRUPA-BUILDING No 2 | 24 | 24 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| YOGIRAJ HERITAGE | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SARASWATI KRUPA-BUILDING No 1 | NA | Rs 6.73 cr | Rs 6.73 cr |
| DEVI KRUPA-BUILDING No 2 | NA | Rs 6.73 cr | Rs 6.73 cr |
| - | NA | Rs 1.50 cr | Rs 1.50 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A ONE ARCHITECTS |
| Engineer | RAJESH THAKARE AND ASSCOIATES |
| Chartered Accountant | A V KHATU & CO |
| Chartered Accountant | R S Kelkar& Co |
| Chartered Accountant | R S kelkar and co |
| Partner | Role in project |
|---|---|
| YOGIRAJ HERITAGE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Arch Certificate_Yogiraj heritage_QPR1_2024-25.pdf | 26 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Engineering certificate.pdf | 26 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Shivleela.pdf | 26 Jun 2026 |
| Form 1File: Architect Certificate - yogiraj heritage.pdf | 4 Mar 2026 |
| Form 2File: Engineers Certificate yogiraj Heritage.pdf | 4 Mar 2026 |
| Form 3File: Form -3 yogiraj heritage.pdf | 4 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: yogiraj Heritage Rera Q3 sold unsold disclosure.pdf | 4 Mar 2026 |
| Form 1File: Form -1 Architect Certificate Heritage.pdf | 24 Dec 2025 |
| Form 2File: Form -1 Architect Certificate Heritage.pdf | 24 Dec 2025 |
| Form 3File: Form-3 Yogiraj Heritage.pdf | 24 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf | 24 Dec 2025 |
| Form 5 (FY 2024-2025)File: Yogiraj Heritage Form-5.pdf | 17 Dec 2025 |
| Form 1File: Form 1 Architect Cetificate.pdf | 8 Aug 2025 |
| Form 2File: Form 2 Engineer Certificate.pdf | 8 Aug 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf | 8 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Yogiraj Heritage Architect's Certificate.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Yogiraj Heritage C A Certificate_compressed.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Yogiraj Heritage Engineer's Certificate.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: Heritage Sold Unsold Disclosure .pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 28 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 28 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Heritage Sold unsold flat.pdf | 28 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Yogiraj Heriatge.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QPR2 Yogiraj heritage CA certificate_11zon.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: heritage Engineer Certificate.pdf | 7 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: yogiraj heritage sold unsold data.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate_Yogiraj heritage_QPR1_2024-25.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate_Yogiraj heritage_QPR1_2024-25.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Yogiraj Heritage_QPR1_2024-25.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QPR1_24-25_Saraswati Devikrupa.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QPR4 Saraswati Devi Krupa.pdf | 22 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 QPR4 Saraswati Devi Krupa.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure QPR4.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 QPR4 Saraswati Devi Krupa.pdf | 22 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate_Saraswati Devi Krupa_QPR3.pdf | 30 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate_Saraswati Devi Krupa_QPR3.pdf | 30 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Disclosure.pdf | 30 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Saraswati Devi Krupa_QPR3_11zon.pdf | 30 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation Mail SS.pdf | 30 Oct 2023 |
| Declaration in FORM BFile: Ashok Shah.pdf | 30 Oct 2023 |
| Declaration in FORM BFile: Ashok-Prabhakar Khatti.pdf | 30 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate_11zon.pdf | 22 Aug 2023 |
| Layout approvalFile: Plan Layout 1.pdf | 21 Aug 2023 |
| Building plan approvalFile: Plan Layout 2.pdf | 21 Aug 2023 |
| PAN CardFile: Yogiraj PAN Card.pdf | 21 Aug 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 21 Aug 2023 |
| Copy of the legal title reportFile: Search REPORT Mayur N Surte.pdf | 21 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Finance Encumbrance Declaration 002.pdf | 21 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Legal enclumbrance declaration 001.pdf | 21 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Finance Encumbrance Declaration 002.pdf | 21 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Legal enclumbrance declaration 001.pdf | 21 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Plan Layout 1.pdf | 21 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Layout 2.pdf | 21 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Prabhakar khatti Commencement Certificate.pdf | 21 Aug 2023 |
| Declaration about Commencement CertificateFile: Deckaration_Commencement Certificate.pdf | 21 Aug 2023 |
| Declaration about Commencement CertificateFile: Afiidavit Form B Prabhakar Khati_11zon.pdf | 21 Aug 2023 |
| Declaration in FORM BFile: Balachandra Wani.pdf | 21 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 21 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf | 21 Aug 2023 |
| CERSAI detailsFile: Cersai Report.pdf | 21 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ashok Shah_Annexure A.pdf | 21 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Rasiklal Shah.pdf | 21 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Harshad Patil_Annexure A.pdf | 21 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Trupri Patil_Annexure A.pdf | 21 Aug 2023 |
| Proforma of Agreement for saleFile: Model Form Agreement_11zon.pdf | 21 Aug 2023 |
| Proforma of Allotment letterFile: Ann1_Model Form Of Allotment Letter_11zon.pdf | 21 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank detail -Rera 001.pdf | 21 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf | 21 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf | 21 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SARASWATI DEVI KRUPA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near RAM MANDIR ROAD NO 57,600+ in Thane
Filed coordinates, straight-line distance. 264 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: YOGIRAJ HERITAGE
YOGIRAJ HERITAGE has 1 registration on MahaRERA, including SARASWATI DEVI KRUPA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SARASWATI DEVI KRUPA is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARASWATI DEVI KRUPA?
The registered promoter entity is YOGIRAJ HERITAGE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARASWATI DEVI KRUPA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARASWATI DEVI KRUPA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARASWATI DEVI KRUPA?
The professionals named in the filing: Architect: A ONE ARCHITECTS; Engineer: RAJESH THAKARE AND ASSCOIATES; Chartered Accountant: A V KHATU & CO; Chartered Accountant: R S Kelkar& Co; Chartered Accountant: R S kelkar and co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARASWATI DEVI KRUPA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback