Home / Browse projects / Pune, Maharashtra / SARA KASTURI BUILDING D AND E
SARA KASTURI BUILDING D AND E
RG-MH-17809 · RERA P52100076943 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARA KASTURI BUILDING D AND E is a Residential / Group Housing project by JAGRUTSARA STRUCTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100076943 on 9 Jul 2024. Possession is promised by 31 Dec 2030.
At a glance
Project
- NameSARA KASTURI BUILDING D AND E
- TypeResidential / Group Housing
- Location
- CHAKAN
- Chakan (CT)
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100076943
- ReraGenie IDRG-MH-17809
Builder
- NameJAGRUTSARA STRUCTURES LLP
- Entity typePartnership
- LLPINAAQ-8155
- GSTIN27AAQFJ5397M1ZC
- LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- PartnerRupesh Sitaram Agrawal
- Other registrations24 more →
- Completed10 of 25
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Jul 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings2 building records
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SARA KASTURI BUILDING D | NA | 15 | 14 | 0 | 0 | 0 |
| SARA KASTURI BUILDING E | NA | 15 | 14 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.
SARA KASTURI BUILDING D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SARA KASTURI BUILDING E0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed432
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SARA KASTURI BUILDING D | 1 | 264 | 265 |
| SARA KASTURI BUILDING E | 1 | 166 | 167 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRADNYANAND SATARKAR |
| Engineer | PRADNYANAD SATARKAR |
| Engineer | ER SOUNAK ROY |
| Chartered Accountant | S D AGRAWAL AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| JAGRUTSARA STRUCTURES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM-1 Sara Kasturi D E.pdf | 24 Jun 2026 |
| Form 2File: FORM-2 Kasturi D E.pdf | 24 Jun 2026 |
| Form 3File: Self-Declaration Form -3 Kasturi D E.pdf | 24 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold- Sara Kasturi D E_compressed.pdf | 24 Jun 2026 |
| Form 2A (FY 2024-2025)File: FORM -2A Sara Kasturi D and E.pdf | 14 May 2026 |
| Form 3File: RERA CA Certificate of Sara Kasturi D E Dec 2025.pdf | 29 Apr 2026 |
| Form 1File: FORM -1 Sara Kasturi D E Dec 2025.pdf | 29 Apr 2026 |
| Form 2File: Form 2 Sara Kasturi -D E.pdf | 29 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold Sara Kasturi -D E dec 2025.pdf | 29 Apr 2026 |
| Form 1File: FORM - 1 Kasturi D & E SEP 2025.pdf | 23 Nov 2025 |
| Form 2File: Form 2 - Engineer's Certificate Sep 2025.pdf | 23 Nov 2025 |
| Form 3File: Form 3 Declaration Kasturi D and E Sep 2025.pdf | 23 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sara Kasturi D & E Bldg SEP 25.pdf | 23 Nov 2025 |
| Form 1File: FORM 1 SK Bldg D&E Sep24.pdf | 22 Jul 2025 |
| Form 2File: FORM 3 Sep 24.pdf | 22 Jul 2025 |
| Form 3File: FORM 3 Sep 24.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SARA KASTURI D & E Sep 2024.pdf | 22 Jul 2025 |
| Form 1File: FORM 1 SK Bldg D&E Dec24.pdf | 22 Jul 2025 |
| Form 2File: FORM-2 December.pdf | 22 Jul 2025 |
| Form 3File: FORM 3 Dec 24.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SARA KASTURI D & E Dec 2024.pdf | 22 Jul 2025 |
| Form 1File: FORM-1 March 2025.pdf | 22 Jul 2025 |
| Form 2File: FORM-2 March 25.pdf | 22 Jul 2025 |
| Form 3File: FORM- 3 March 25.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SARA KASTURI D & E March 2025.pdf | 22 Jul 2025 |
| Form 1File: FORM-1 June 2025.pdf | 22 Jul 2025 |
| Form 2File: FORM-2 June 25.pdf | 22 Jul 2025 |
| Form 3File: FORM- 3 June 25.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SARA KASTURI D & E June 2025.pdf | 22 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf | 2 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Cert.pdf | 2 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Legal Title Report old.pdf | 1 Jul 2024 |
| Building plan approvalFile: Building D 8 and 13th Floor_compressed.pdf | 19 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building D 8 and 13th Floor_compressed.pdf | 19 Jun 2024 |
| Layout approvalFile: Layout 1st page.pdf | 7 Jun 2024 |
| Building plan approvalFile: Building D_compressed.pdf | 7 Jun 2024 |
| Building plan approvalFile: Buiilding D Elevation 9_compressed.pdf | 7 Jun 2024 |
| Building plan approvalFile: Building D10.pdf | 7 Jun 2024 |
| Building plan approvalFile: Building E_compressed.pdf | 7 Jun 2024 |
| Building plan approvalFile: Building E Elevation_compressed.pdf | 7 Jun 2024 |
| PAN CardFile: 16 PAN Card.pdf | 7 Jun 2024 |
| Copy of the legal title reportFile: LEGAL TITLE Updated REPORT KASTURI BUILDING D E.pdf | 7 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: 6 NO ENC - FIN_page-0001.pdf | 7 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: 7 NO ENC - LEGAL.pdf | 7 Jun 2024 |
| Details of encumbrances concerned to LegalFile: 6 NO ENC - FIN_page-0001.pdf | 7 Jun 2024 |
| Details of encumbrances concerned to LegalFile: 7 NO ENC - LEGAL.pdf | 7 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Layout 1st page.pdf | 7 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building D_compressed.pdf | 7 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Buiilding D Elevation 9_compressed.pdf | 7 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building D10.pdf | 7 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building E_compressed.pdf | 7 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building E Elevation_compressed.pdf | 7 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Scan2024 05 30 SARA.pdf | 7 Jun 2024 |
| Declaration about Commencement CertificateFile: 2 Format D.pdf | 7 Jun 2024 |
| Declaration in FORM BFile: 17 Form B.pdf | 7 Jun 2024 |
| CERSAI detailsFile: CERSAI DISCLOSER WITH REPORT.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Kasturi D and E.pdf | 7 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Sara Infra Disclosure (Mr Nilesh).pdf | 7 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Sara Infra Disclosure (Mr Rupesh).pdf | 7 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 11 Sara Infra Disclosure (Mr Sitaram).pdf | 7 Jun 2024 |
| Proforma of Agreement for saleFile: 18 ATS Draft RERA.pdf | 7 Jun 2024 |
| Proforma of Allotment letterFile: 8 Model Form of Allotment Letter_compressed.pdf | 7 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 13 Format A.pdf | 7 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: 4 Deviation Report (Allot Letter).pdf | 7 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: 3 Deviation Report (Agree to Sale).pdf | 7 Jun 2024 |
| Other - TechnicalFile: Annexure A_page-0001.pdf | 7 Jun 2024 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SARA CITY TOWER C3PR1263032502478 | CHAKAN, Pune | 398 | Feb 2026 | Ongoing | Dec 2032 | Not due yet |
| SARA NILAAY C & DPR1261012501602 | TQ KHED, Pune | 292 | Nov 2025 | Ongoing | Mar 2031 | Not due yet |
| SARA OASISPR1260002501529 | DUDHULGAON, Pune | 12 | Nov 2025 | Ongoing | Dec 2030 | Not due yet |
| SARA NILAAYP52100056337 | NANEKARWADI CHAKAN, Pune | 430 | May 2024 | Ongoing | Dec 2030 | Not due yet |
| SARA CITY TOWER C2P52100079907 | CHAKAN, Pune | 361 | Mar 2025 | Ongoing | Dec 2030 | Not due yet |
| SARA CITY PLOT E 1P52100056494 | CHAKAN, Pune | 100 | Jun 2024 | Ongoing | Dec 2029 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 24 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SARA KASTURI BUILDING D AND E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHAKAN13,700+ in Pune
Filed coordinates, straight-line distance. 79 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: JAGRUTSARA STRUCTURES LLP
Jagrutsara Structures LLP has 25 registrations on MahaRERA, including SARA GOKULDHAM - A BUILDING and SARA PARIVARTAN - SECTOR E. Its filings disclose 12 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SARA KASTURI BUILDING D AND E is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARA KASTURI BUILDING D AND E?
The registered promoter entity is JAGRUTSARA STRUCTURES LLP, a partnership as per the filing. Its LLPIN AAQ-8155 and GSTIN 27AAQFJ5397M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARA KASTURI BUILDING D AND E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARA KASTURI BUILDING D AND E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARA KASTURI BUILDING D AND E?
The professionals named in the filing: Architect: PRADNYANAND SATARKAR; Engineer: PRADNYANAD SATARKAR; Engineer: ER SOUNAK ROY; Chartered Accountant: S D AGRAWAL AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARA KASTURI BUILDING D AND E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback