Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SARA CITY TOWER C2 is a Residential / Group Housing project by JAGRUTSARA STRUCTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100079907 on 29 Mar 2025. Possession is promised by 31 Dec 2030. 88 of the 361 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameSARA CITY TOWER C2
- TypeResidential / Group Housing
- Location
- CHAKAN ROAD
- CHAKAN
- Kharabwadi (CT)
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100079907
- ReraGenie IDRG-MH-31572
Builder
- NameJAGRUTSARA STRUCTURES LLP
- Entity typePartnership
- LLPINAAQ-8155
- GSTIN27AAQFJ5397M1ZC
- LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerRupesh Sitaram Agrawal
- Other registrations24 more →
- Completed10 of 25
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Mar 2025
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C2 BUILDING | NA | 14 | 13 | 361 | 0 | 361 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.
C2 BUILDING: 5% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed361
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C2 BUILDING | NA | Rs 39.10 cr | Rs 7.82 cr |
| - | NA | Rs 78.22 lakh | Rs 5.91 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABS Architects and Associates |
| Architect | A B S Architects & Associates |
| Engineer | Er Amit Pawar |
| Engineer | RAHUL PAWAR |
| Chartered Accountant | SD Agrawal And Associates |
| Partner | Role in project |
|---|---|
| JAGRUTSARA STRUCTURES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: C2 bldg typical floor_compressed.pdf | 5 Jun 2026 |
| Building plan approvalFile: C2 bldg 8th floor refuge_compressed.pdf | 5 Jun 2026 |
| Building plan approvalFile: C2 bldg 13th floor refuge_compressed.pdf | 5 Jun 2026 |
| Building plan approvalFile: C2 bldg section elevetion_compressed.pdf | 5 Jun 2026 |
| Building plan approvalFile: C2 bldg Terrace floor_compressed.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 Sara City Tower C2.pdf | 5 Jun 2026 |
| Withdrawal Update Form 2File: FORM -2 Sara City Tower C2.pdf | 5 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 declaration with form 3.pdf | 5 Jun 2026 |
| Building plan approvalFile: FSI AND PARKING HIGHLIGHTED.pdf | 17 Apr 2026 |
| Building plan approvalFile: C2 bldg 8th floor refuge_compressed.pdf | 22 Jan 2026 |
| Building plan approvalFile: C2 bldg 13th floor refuge_compressed.pdf | 22 Jan 2026 |
| Building plan approvalFile: C2 bldg Stilt floor.pdf | 22 Jan 2026 |
| Building plan approvalFile: C2 bldg section elevetion_compressed.pdf | 22 Jan 2026 |
| Building plan approvalFile: C2 bldg Terrace floor_compressed.pdf | 22 Jan 2026 |
| Building plan approvalFile: C2 bldg typical floor_compressed.pdf | 22 Jan 2026 |
| Form 1File: FORM -1 Sara City Tower C2 DEC2025.pdf | 21 Jan 2026 |
| Form 2File: FORM -2 TOWER C2 DEC2025.pdf | 21 Jan 2026 |
| Form 3File: RERA Form-3Sara City Tower C2Dec2025.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold - DEC2025 Tower C2 (1).pdf | 21 Jan 2026 |
| Form 1File: FORM - 1 Sara City Tower C2 SEP2025.pdf | 23 Nov 2025 |
| Form 2File: 24 Form 2 - Engineer's SEP.pdf | 23 Nov 2025 |
| Form 3File: Form 3 Declaration Sara City C2 SEP 2025.pdf | 23 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sara City Tower C2 SEP 25.pdf | 23 Nov 2025 |
| Form 1File: ARCH FORM 1.pdf | 19 Aug 2025 |
| Form 2File: FORM 2 ENGG.pdf | 19 Aug 2025 |
| Form 3File: Form 3 Declaration -14-04-2025_0001.pdf | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold -31-03-2025_0001.pdf | 19 Aug 2025 |
| Form 1File: FORM 1 JUNE 2025.pdf | 19 Aug 2025 |
| Form 2File: FORM 2 JUNE 2025.pdf | 19 Aug 2025 |
| Form 3File: Form 3 Declartion - 18-07-2025_0001.pdf | 19 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloser of Sold - 30-06-2025_0001.pdf | 19 Aug 2025 |
| Other - FinanceFile: TO Whom It May Concern_0001.pdf | 24 Mar 2025 |
| Other - TechnicalFile: TO Whom It May Concern_0001.pdf | 24 Mar 2025 |
| Other - TechnicalFile: TO Whom IT May Concern C2_0001.pdf | 24 Mar 2025 |
| Building plan approvalFile: 06_compressed.pdf | 10 Mar 2025 |
| Building plan approvalFile: 07_compressed.pdf | 10 Mar 2025 |
| Building plan approvalFile: 08_compressed.pdf | 10 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 08_compressed.pdf | 10 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 07_compressed.pdf | 10 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 06_compressed.pdf | 10 Mar 2025 |
| Other - LegalFile: खराबवाडी_137_2_138_2_139_140_141_2_142_143_144_145_2_150_2_152_2_153_2_154_2_155_2_156_2_1 | 5 Mar 2025 |
| Other - FinanceFile: खराबवाडी_137_2_138_2_139_140_141_2_142_143_144_145_2_150_2_152_2_153_2_154_2_155_2_156_2_1 | 5 Mar 2025 |
| Other - TechnicalFile: CC Verification Kharabwadi.pdf | 5 Mar 2025 |
| Other - TechnicalFile: खराबवाडी_137_2_138_2_139_140_141_2_142_143_144_145_2_150_2_152_2_153_2_154_2_155_2_156_2_1 | 5 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Loan Disclosure by CA.pdf | 5 Mar 2025 |
| Copy of the legal title reportFile: Search Report .pdf | 7 Feb 2025 |
| Layout approvalFile: 01_compressed (1).pdf | 6 Feb 2025 |
| Building plan approvalFile: 02_compressed.pdf | 6 Feb 2025 |
| Building plan approvalFile: 03_compressed.pdf | 6 Feb 2025 |
| Building plan approvalFile: 04_compressed.pdf | 6 Feb 2025 |
| Building plan approvalFile: 05_compressed.pdf | 6 Feb 2025 |
| PAN CardFile: 1 PAN Card.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: NO ENC - FIN LEGAL.pdf | 6 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: 01_compressed (1).pdf | 6 Feb 2025 |
| Proforma of Allotment letterFile: Updated Annexure 1 - Model Form of Allotment Letter_compressed.pdf | 6 Feb 2025 |
| Declaration in FORM BFile: FORM B BUILDING C2_0001.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Architect.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 RERA CA Certificate of Sara City Tower C2.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Engineers.pdf | 6 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commecemet Certificate C phase_0001_compressed.pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf | 6 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf | 6 Feb 2025 |
| Other - LegalFile: Gut No Merging Declaration.pdf | 6 Feb 2025 |
| Other - LegalFile: LLP Document.pdf | 6 Feb 2025 |
| Declaration about Commencement CertificateFile: FORMAT - D.pdf | 6 Feb 2025 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 6 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 6 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report (Allot Letter).pdf | 6 Feb 2025 |
| Details of encumbrances concerned to LegalFile: NO ENC - FIN LEGAL.pdf | 6 Feb 2025 |
| Other - FinanceFile: Gut No Merging Declaration.pdf | 6 Feb 2025 |
| Other - FinanceFile: LLP Document.pdf | 6 Feb 2025 |
| Other - TechnicalFile: LLP Document.pdf | 6 Feb 2025 |
| Other - TechnicalFile: Annexure - A.pdf | 6 Feb 2025 |
| Other - TechnicalFile: Gut No Merging Declaration.pdf | 6 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report (Agree to Sale).pdf | 6 Feb 2025 |
| Proforma of Agreement for saleFile: ATS With Annexure 1.pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sara Infra Disclosure (MrRupesh).pdf | 6 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sara Infra Disclosure (Mr Nilesh).pdf | 6 Feb 2025 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SARA CITY TOWER C3PR1263032502478 | CHAKAN, Pune | 398 | Feb 2026 | Ongoing | Dec 2032 | Not due yet |
| SARA NILAAY C & DPR1261012501602 | TQ KHED, Pune | 292 | Nov 2025 | Ongoing | Mar 2031 | Not due yet |
| SARA OASISPR1260002501529 | DUDHULGAON, Pune | 12 | Nov 2025 | Ongoing | Dec 2030 | Not due yet |
| SARA NILAAYP52100056337 | NANEKARWADI CHAKAN, Pune | 430 | May 2024 | Ongoing | Dec 2030 | Not due yet |
| SARA KASTURI BUILDING D AND EP52100076943 | CHAKAN, Pune | - | Jul 2024 | Ongoing | Dec 2030 | Not due yet |
| SARA CITY PLOT E 1P52100056494 | CHAKAN, Pune | 100 | Jun 2024 | Ongoing | Dec 2029 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 24 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SARA CITY TOWER C2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHAKAN13,700+ in Pune
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
SARA NILAAY C & D
JAGRUTSARA STRUCTURES LLP
Builder: JAGRUTSARA STRUCTURES LLP
Jagrutsara Structures LLP has 25 registrations on MahaRERA, including SARA GOKULDHAM - A BUILDING and SARA PARIVARTAN - SECTOR E. Its filings disclose 12 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SARA CITY TOWER C2 is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SARA CITY TOWER C2?
The registered promoter entity is JAGRUTSARA STRUCTURES LLP, a partnership as per the filing. Its LLPIN AAQ-8155 and GSTIN 27AAQFJ5397M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SARA CITY TOWER C2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SARA CITY TOWER C2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SARA CITY TOWER C2?
The professionals named in the filing: Architect: ABS Architects and Associates; Architect: A B S Architects & Associates; Engineer: Er Amit Pawar; Engineer: RAHUL PAWAR; Chartered Accountant: SD Agrawal And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SARA CITY TOWER C2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback