ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SARA CITY TOWER C2

Registered No litigation declared Residential / Group Housing project

SARA CITY TOWER C2

By JAGRUTSARA STRUCTURES LLP

RG-MH-31572 · RERA P52100079907 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 50%
273 of 361Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

SARA CITY TOWER C2 is a Residential / Group Housing project by JAGRUTSARA STRUCTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100079907 on 29 Mar 2025. Possession is promised by 31 Dec 2030. 88 of the 361 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSARA CITY TOWER C2
  • TypeResidential / Group Housing
  • Location
    • CHAKAN ROAD
    • CHAKAN
    • Kharabwadi (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079907
  • ReraGenie IDRG-MH-31572

Builder

  • NameJAGRUTSARA STRUCTURES LLP
  • Entity typePartnership
  • LLPINAAQ-8155
  • GSTIN27AAQFJ5397M1ZC
  • LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerRupesh Sitaram Agrawal
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredMar 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Mar 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

24%88 of 361 units booked
19.8%Work done, per cost certificate

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C2 BUILDINGNA14133610361

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.

C2 BUILDING: 5% average across the applicable activities

ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed361

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots361
Closed/Covered361

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,139 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA PUNE
Permissible FSI14674.81
Proposed, not sanctioned14,675 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOHINOOR CENTRE,SHOP NO22,23,35TO41 BLDG-B GAT NO 1281, PUNE-NASIK HIGHWAY,TALEGAON CHOWK CHAKAN MAHARASHTRA 410501
Estimated costRs 39.88 cr
Cost incurredRs 7.88 cr
Work done19.76%
BuildingWingEstimatedIncurred
C2 BUILDINGNARs 39.10 crRs 7.82 cr
-NARs 78.22 lakhRs 5.91 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABS Architects and Associates
ArchitectA B S Architects & Associates
EngineerEr Amit Pawar
EngineerRAHUL PAWAR
Chartered AccountantSD Agrawal And Associates
PartnerRole in project
JAGRUTSARA STRUCTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: C2 bldg typical floor_compressed.pdf5 Jun 2026
Building plan approvalFile: C2 bldg 8th floor refuge_compressed.pdf5 Jun 2026
Building plan approvalFile: C2 bldg 13th floor refuge_compressed.pdf5 Jun 2026
Building plan approvalFile: C2 bldg section elevetion_compressed.pdf5 Jun 2026
Building plan approvalFile: C2 bldg Terrace floor_compressed.pdf5 Jun 2026
Withdrawal Update Form 1File: FORM-1 Sara City Tower C2.pdf5 Jun 2026
Withdrawal Update Form 2File: FORM -2 Sara City Tower C2.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 declaration with form 3.pdf5 Jun 2026
Building plan approvalFile: FSI AND PARKING HIGHLIGHTED.pdf17 Apr 2026
Building plan approvalFile: C2 bldg 8th floor refuge_compressed.pdf22 Jan 2026
Building plan approvalFile: C2 bldg 13th floor refuge_compressed.pdf22 Jan 2026
Building plan approvalFile: C2 bldg Stilt floor.pdf22 Jan 2026
Building plan approvalFile: C2 bldg section elevetion_compressed.pdf22 Jan 2026
Building plan approvalFile: C2 bldg Terrace floor_compressed.pdf22 Jan 2026
Building plan approvalFile: C2 bldg typical floor_compressed.pdf22 Jan 2026
Form 1File: FORM -1 Sara City Tower C2 DEC2025.pdf21 Jan 2026
Form 2File: FORM -2 TOWER C2 DEC2025.pdf21 Jan 2026
Form 3File: RERA Form-3Sara City Tower C2Dec2025.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold - DEC2025 Tower C2 (1).pdf21 Jan 2026
Form 1File: FORM - 1 Sara City Tower C2 SEP2025.pdf23 Nov 2025
Form 2File: 24 Form 2 - Engineer's SEP.pdf23 Nov 2025
Form 3File: Form 3 Declaration Sara City C2 SEP 2025.pdf23 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Sara City Tower C2 SEP 25.pdf23 Nov 2025
Form 1File: ARCH FORM 1.pdf19 Aug 2025
Form 2File: FORM 2 ENGG.pdf19 Aug 2025
Form 3File: Form 3 Declaration -14-04-2025_0001.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold -31-03-2025_0001.pdf19 Aug 2025
Form 1File: FORM 1 JUNE 2025.pdf19 Aug 2025
Form 2File: FORM 2 JUNE 2025.pdf19 Aug 2025
Form 3File: Form 3 Declartion - 18-07-2025_0001.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Discloser of Sold - 30-06-2025_0001.pdf19 Aug 2025
Other - FinanceFile: TO Whom It May Concern_0001.pdf24 Mar 2025
Other - TechnicalFile: TO Whom It May Concern_0001.pdf24 Mar 2025
Other - TechnicalFile: TO Whom IT May Concern C2_0001.pdf24 Mar 2025
Building plan approvalFile: 06_compressed.pdf10 Mar 2025
Building plan approvalFile: 07_compressed.pdf10 Mar 2025
Building plan approvalFile: 08_compressed.pdf10 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 08_compressed.pdf10 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 07_compressed.pdf10 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 06_compressed.pdf10 Mar 2025
Other - LegalFile: खराबवाडी_137_2_138_2_139_140_141_2_142_143_144_145_2_150_2_152_2_153_2_154_2_155_2_156_2_15 Mar 2025
Other - FinanceFile: खराबवाडी_137_2_138_2_139_140_141_2_142_143_144_145_2_150_2_152_2_153_2_154_2_155_2_156_2_15 Mar 2025
Other - TechnicalFile: CC Verification Kharabwadi.pdf5 Mar 2025
Other - TechnicalFile: खराबवाडी_137_2_138_2_139_140_141_2_142_143_144_145_2_150_2_152_2_153_2_154_2_155_2_156_2_15 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Loan Disclosure by CA.pdf5 Mar 2025
Copy of the legal title reportFile: Search Report .pdf7 Feb 2025
Layout approvalFile: 01_compressed (1).pdf6 Feb 2025
Building plan approvalFile: 02_compressed.pdf6 Feb 2025
Building plan approvalFile: 03_compressed.pdf6 Feb 2025
Building plan approvalFile: 04_compressed.pdf6 Feb 2025
Building plan approvalFile: 05_compressed.pdf6 Feb 2025
PAN CardFile: 1 PAN Card.pdf6 Feb 2025
Details of encumbrances concerned to FinanceFile: NO ENC - FIN LEGAL.pdf6 Feb 2025
Copy of Layout Approval (in case of layout)File: 01_compressed (1).pdf6 Feb 2025
Proforma of Allotment letterFile: Updated Annexure 1 - Model Form of Allotment Letter_compressed.pdf6 Feb 2025
Declaration in FORM BFile: FORM B BUILDING C2_0001.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Architect.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 RERA CA Certificate of Sara City Tower C2.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Engineers.pdf6 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commecemet Certificate C phase_0001_compressed.pdf6 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf6 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf6 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf6 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf6 Feb 2025
Other - LegalFile: Gut No Merging Declaration.pdf6 Feb 2025
Other - LegalFile: LLP Document.pdf6 Feb 2025
Declaration about Commencement CertificateFile: FORMAT - D.pdf6 Feb 2025
CERSAI detailsFile: CERSAI Declaration.pdf6 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf6 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation Report (Allot Letter).pdf6 Feb 2025
Details of encumbrances concerned to LegalFile: NO ENC - FIN LEGAL.pdf6 Feb 2025
Other - FinanceFile: Gut No Merging Declaration.pdf6 Feb 2025
Other - FinanceFile: LLP Document.pdf6 Feb 2025
Other - TechnicalFile: LLP Document.pdf6 Feb 2025
Other - TechnicalFile: Annexure - A.pdf6 Feb 2025
Other - TechnicalFile: Gut No Merging Declaration.pdf6 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report (Agree to Sale).pdf6 Feb 2025
Proforma of Agreement for saleFile: ATS With Annexure 1.pdf6 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sara Infra Disclosure (MrRupesh).pdf6 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sara Infra Disclosure (Mr Nilesh).pdf6 Feb 2025

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SARA CITY TOWER C3PR1263032502478CHAKAN, Pune398Feb 2026OngoingDec 2032Not due yet
SARA NILAAY C & DPR1261012501602TQ KHED, Pune292Nov 2025OngoingMar 2031Not due yet
SARA OASISPR1260002501529DUDHULGAON, Pune12Nov 2025OngoingDec 2030Not due yet
SARA NILAAYP52100056337NANEKARWADI CHAKAN, Pune430May 2024OngoingDec 2030Not due yet
SARA KASTURI BUILDING D AND EP52100076943CHAKAN, Pune-Jul 2024OngoingDec 2030Not due yet
SARA CITY PLOT E 1P52100056494CHAKAN, Pune100Jun 2024OngoingDec 2029Not due yet

How this compares with Pune

24%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARA CITY TOWER C2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAKAN13,700+ in Pune

2 kmSARA CITY TOWER C2Completed 16Lapsed / revoked 11Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: JAGRUTSARA STRUCTURES LLP

Jagrutsara Structures LLP has 25 registrations on MahaRERA, including SARA GOKULDHAM - A BUILDING and SARA PARIVARTAN - SECTOR E. Its filings disclose 12 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SARA CITY TOWER C2 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARA CITY TOWER C2?

The registered promoter entity is JAGRUTSARA STRUCTURES LLP, a partnership as per the filing. Its LLPIN AAQ-8155 and GSTIN 27AAQFJ5397M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARA CITY TOWER C2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARA CITY TOWER C2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARA CITY TOWER C2?

The professionals named in the filing: Architect: ABS Architects and Associates; Architect: A B S Architects & Associates; Engineer: Er Amit Pawar; Engineer: RAHUL PAWAR; Chartered Accountant: SD Agrawal And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARA CITY TOWER C2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARA CITY TOWER C2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARA CITY TOWER C2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.