Home / Browse projects / Pune, Maharashtra / SARA CITY PLOT E 1

Registered No litigation declared Others project

SARA CITY PLOT E 1

By JAGRUTSARA STRUCTURES LLP

RG-MH-05722 · RERA P52100056494 · Last updated on MahaRERA portal: 19 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 24 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
43 of 100Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

SARA CITY PLOT E 1 is a Others project by JAGRUTSARA STRUCTURES LLP in Pune, Maharashtra, registered with MahaRERA as P52100056494 on 5 Jun 2024. Possession is promised by 31 Dec 2029. 57 of the 100 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameSARA CITY PLOT E 1
  • TypeOthers
  • Location
    • CHAKAN ROAD
    • CHAKAN
    • Kharabwadi (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100056494
  • ReraGenie IDRG-MH-05722

Builder

  • NameJAGRUTSARA STRUCTURES LLP
  • Entity typePartnership
  • LLPINAAQ-8155
  • GSTIN27AAQFJ5397M1ZC
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnerRupesh Sitaram Agrawal
  • Other registrations24 more →
  • Completed10 of 25
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredJun 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed72 files

Current status

57%57 of 100 units booked
73.2%Work done, per cost certificate

Figures as on 19 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA5528533
B WINGNA5528634
C WINGNA5528533

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

A WING65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
B WING65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
C WING65%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes20%

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Closed/Covered3
Open Space75
BuildingClosed/CoveredOpen SpaceTotal
A WING12526
B WING12526
C WING12526

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,220 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHRITY, PUNE
Permissible FSI5060.08
Proposed, not sanctioned1,825 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 396 GATE NO 4 GULTEKDI PUNE 37
Estimated costRs 8.08 cr
Cost incurredRs 5.92 cr
Work done73.25%
BuildingWingEstimatedIncurred
A WINGNARs 7.82 crRs 5.87 cr
-NARs 25.63 lakhRs 5.13 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE ZING STUDIO
ArchitectA B S Architects & Associates
EngineerSECTRUM CONSULTANTS
EngineerRAHUL PAWAR
EngineerER ANIRUDDHA GONJARE
Chartered AccountantS D AGRAWAL & ASSOCIATES
Chartered AccountantSD Agrawal and Associates
PartnerRole in project
JAGRUTSARA STRUCTURES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM - 2A Sara City Plot E1.pdf19 Aug 2026
Building plan approvalFile: E1 bldg sanctioned drg1_compressed.pdf13 Aug 2026
Commencement certificateFile: E1 bldg commencement certificate.pdf13 Aug 2026
Building plan approvalFile: E1 bldg sanctioned drg2_compressed.pdf13 Aug 2026
Building plan approvalFile: E1 bldg sanctioned drg3_compressed.pdf13 Aug 2026
Withdrawal Update Form 1File: FORM-2 Sara City Plot E1.pdf13 Aug 2026
Withdrawal Update Form 1File: FORM-2 Sara City Plot E1.pdf13 Aug 2026
Withdrawal Update Form 2File: FORM-2 Sara City Plot E1.pdf13 Aug 2026
Withdrawal Update Form 2File: FORM-2 Sara City Plot E1.pdf13 Aug 2026
Withdrawal Update Form 3File: RERA Form-3 of Sara City Plot E1 JUNE 2026.pdf13 Aug 2026
Withdrawal Update Form 3File: RERA Form-3 of Sara City Plot E1 JUNE 2026.pdf13 Aug 2026
Form 1File: FORM-1 Sara City E1.pdf30 Jun 2026
Form 2File: FORM-2 Sara City E1.pdf30 Jun 2026
Form 3File: Declaration - Sara City E1.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold - Sara City Plot E1.pdf30 Jun 2026
Form 2A (FY 2024-2025)File: FORM-2A Sara City Plot E1.pdf13 May 2026
Form 1File: FORM -1 Sara City Plot E1 DEC2025.pdf17 Jan 2026
Form 2File: FORM -2 Plot E1 DEC2025.pdf17 Jan 2026
Form 3File: RERA Form-3 of Sara City Plot E1_Dec2025.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold - DEC 2025 Plot E1.pdf17 Jan 2026
Form 1File: Form 1 -Sara City plot E1 June 2025.pdf8 Jan 2026
Form 2File: Form 2 E1 bldg Jun2025.pdf8 Jan 2026
Form 3File: RERA Form-3 Sara City Plot E1 June 25.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: Discloser of Sold- Sara City E1 JUN2025(1).pdf8 Jan 2026
Form 1File: 1 FORM-1 SEP 25.pdf8 Jan 2026
Form 2File: 2 FORM-2 SEP 25.pdf8 Jan 2026
Form 3File: 3 Form-3 SEP 25.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: 4 Sold- SEP 25.pdf8 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 SARA CITY PLOT E1.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 SARA CITY PLOT E1.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sara City Plot E1.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 December.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 December.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY December.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1_0001_compressed.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_0001.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_0001.pdf16 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_0001.pdf16 Dec 2024
Proforma of Agreement for saleFile: Sara Plot E-1 ATS.pdf11 Jun 2024
Building plan approvalFile: scan1335_compressed.pdf30 Apr 2024
Layout approvalFile: scan1333_compressed.pdf30 Apr 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf30 Apr 2024
PAN CardFile: 1 PAN Card.pdf30 Apr 2024
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf30 Apr 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf30 Apr 2024
Details of encumbrances concerned to FinanceFile: Legal Enc.pdf30 Apr 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf30 Apr 2024
Details of encumbrances concerned to LegalFile: Legal Enc.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: scan1333_compressed.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf30 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: scan1335_compressed.pdf30 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf30 Apr 2024
Declaration about Commencement CertificateFile: Sara Plot E1 Format D.pdf30 Apr 2024
Declaration in FORM BFile: 1 Declaration in FORM B.pdf30 Apr 2024
CERSAI detailsFile: 1 CERSAI details.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA Certificate of Sara City Plot E1 -30052024.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sitaram Agrawal_0001.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Nilesh Agrawal_0001_0001.pdf30 Apr 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf30 Apr 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf30 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow30 Apr 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf30 Apr 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf30 Apr 2024
Other - LegalFile: 1 Other - Legal.pdf30 Apr 2024
Other - LegalFile: 2 Other - Legal.pdf30 Apr 2024
Other - LegalFile: 3 Other - Legal.pdf30 Apr 2024
Other - FinanceFile: Land Ownership Declaration (E1).pdf30 Apr 2024
Other - TechnicalFile: ilovepdf_merged_compressed.pdf30 Apr 2024
Other - TechnicalFile: CC Verification.pdf30 Apr 2024
Other - TechnicalFile: Sara Plot E1 Annexure A.pdf30 Apr 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SARA CITY TOWER C3PR1263032502478CHAKAN, Pune398Feb 2026OngoingDec 2032Not due yet
SARA NILAAY C & DPR1261012501602TQ KHED, Pune292Nov 2025OngoingMar 2031Not due yet
SARA OASISPR1260002501529DUDHULGAON, Pune12Nov 2025OngoingDec 2030Not due yet
SARA NILAAYP52100056337NANEKARWADI CHAKAN, Pune430May 2024OngoingDec 2030Not due yet
SARA KASTURI BUILDING D AND EP52100076943CHAKAN, Pune-Jul 2024OngoingDec 2030Not due yet
SARA CITY TOWER C2P52100079907CHAKAN, Pune361Mar 2025OngoingDec 2030Not due yet

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARA CITY PLOT E 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAKAN13,700+ in Pune

2 kmSARA CITY PLOT E 1Completed 16Lapsed / revoked 11Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: JAGRUTSARA STRUCTURES LLP

Jagrutsara Structures LLP has 25 registrations on MahaRERA, including SARA GOKULDHAM - A BUILDING and SARA PARIVARTAN - SECTOR E. Its filings disclose 12 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SARA CITY PLOT E 1 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARA CITY PLOT E 1?

The registered promoter entity is JAGRUTSARA STRUCTURES LLP, a partnership as per the filing. Its LLPIN AAQ-8155 and GSTIN 27AAQFJ5397M1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARA CITY PLOT E 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARA CITY PLOT E 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARA CITY PLOT E 1?

The professionals named in the filing: Architect: THE ZING STUDIO; Architect: A B S Architects & Associates; Engineer: SECTRUM CONSULTANTS; Engineer: RAHUL PAWAR; Engineer: ER ANIRUDDHA GONJARE; Chartered Accountant: S D AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARA CITY PLOT E 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARA CITY PLOT E 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARA CITY PLOT E 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.