SANSKRUTI ROSE
By SANSKRUTI BUILDER AND DEVELOPER
RG-MH-51958 · RERA P99000049176 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SANSKRUTI ROSE is a Others project by SANSKRUTI BUILDER AND DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000049176 on 3 Feb 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 76 of the 148 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSANSKRUTI ROSE
- TypeOthers
- Location
- Achole
- Nallasopara East
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401209
- Pincode401209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000049176
- ReraGenie IDRG-MH-51958
Builder
- NameSANSKRUTI BUILDER AND DEVELOPER
- Entity typePartnership
- GSTIN27AEPFS8662D1ZH
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersPRADEEPKUMAR ATMAPRASAD CHATURVEDI, PRAMOD ATMAPRASAD CHATURVEDI
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2023
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed65 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SANSKRUTI ROSE | NA | 8 | 8 | 147 | 1 | 148 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.
SANSKRUTI ROSE: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| NAD-BRAHMA ASVARI CO-OP HSG SOC LTD | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SANSKRUTI ROSE | NA | Rs 22.94 cr | Rs 22.60 cr |
| - | NA | Rs 2.20 cr | Rs 1.76 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABHAY RAUT |
| Engineer | K C SHAH CONSULTANTS |
| Engineer | AAKASH TIWARI |
| Chartered Accountant | S B JAIN AND ASSOCIATES |
| Chartered Accountant | JPM AND ASSOCIATES |
| Chartered Accountant | Manish Shinde & Associates |
| Chartered Accountant | VISHAL P GUPTA |
| Partner | Role in project |
|---|---|
| SANSKRUTI BUILDER AND DEVELOPER | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSlow responce leaded to extend the Rera project deadline
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: ENG.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 JUNE 2026.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: ARCH.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: ENG.pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: FORM-2.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Q3.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: form 1-30-6-25.pdf | 1 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 1 Jan 2026 |
| Withdrawal Update Form 2File: form 2 30-6-25.pdf | 1 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 1 Jan 2026 |
| Withdrawal Update Form 3File: Signed FORM 3.pdf | 1 Jan 2026 |
| Withdrawal Update Form 3File: FINAL ROSE SEPT FORM 3.pdf | 1 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 (24-25).pdf | 1 Jan 2026 |
| Form 2A (FY 2023-2024)File: form 2A Rose23-24.pdf | 27 Dec 2025 |
| Form 2A (FY 2024-2025)File: Rose Form 2A 24-25.pdf | 27 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form 5 (23-24).pdf | 22 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch dec24.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng dec24.pdf | 10 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: sold unsold dec24.pdf | 10 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate 23022024 ROSE.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SANS ROSE ABHAY RAUT ARCH.pdf | 8 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ROSE AUDIT.pdf | 24 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: sanskruti rose - quality assurance certificate.pdf | 14 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3.pdf | 14 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold - unsold details - for rera update.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ROSE FORM 2 JULY23.pdf | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: july-23 (2).pdf | 6 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT ROSE.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ROSE ENG CER.pdf | 5 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank a-c declaration.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_FINAL_compressed.pdf | 30 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PRAMOD_compressed.pdf | 18 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PRADEEP_compressed.pdf | 18 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200257689079_For_Asset_Based_Search_16_01_2023_19_56_44_613.pdf | 16 Jan 2023 |
| Building plan approvalFile: WING A.pdf | 19 Oct 2022 |
| Building plan approvalFile: WING B.pdf | 19 Oct 2022 |
| Building plan approvalFile: WING C.pdf | 19 Oct 2022 |
| Building plan approvalFile: WING D.pdf | 19 Oct 2022 |
| Building plan approvalFile: WING E.pdf | 19 Oct 2022 |
| Layout approvalFile: LAYOUT PLAN.pdf | 19 Oct 2022 |
| PAN CardFile: 1 PAN Card.pdf | 19 Oct 2022 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf | 19 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: no encumbrance finance.pdf | 19 Oct 2022 |
| Details of encumbrances concerned to LegalFile: no encumbrance legal.pdf | 19 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 19 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: WING A.pdf | 19 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: WING B.pdf | 19 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: WING C.pdf | 19 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: WING D.pdf | 19 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: WING E.pdf | 19 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Nadbrahma cc_compressed.pdf | 19 Oct 2022 |
| Declaration about Commencement CertificateFile: letter.pdf | 19 Oct 2022 |
| Declaration in FORM BFile: AFFIDAVIIT CUM DECLARATION builder_compressed.pdf | 19 Oct 2022 |
| Proforma of Agreement for saleFile: SALE DRAFT.pdf | 19 Oct 2022 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 19 Oct 2022 |
| Proforma of Allotment letterFile: allotement draft.pdf | 19 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECLARATION.pdf | 19 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: no deviation allotement.pdf | 19 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: no deviation agreement.pdf | 19 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SANSKRUTI ROSE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nallasopara East3,200+ in Palghar
Filed coordinates, straight-line distance. 170 registered projects within 2 km.
MLDC YASHWANT ORCHID PHASE I
SAI RYDAM REALTORS PVT LTD
AV CRYSTAL PRESTIGE
RELIABLE HOUSING INDIA PRIVATE LIMITED
ARMAAN LOTUS
MANGAL ARJUN VARATHA
Redevelopement of Sagar Prakash Hsg Co-op Soc
TRIMURTI CONSTRUCTION
SANSKRUTI SAPPHIRE
SANSKRUTI BUILDER AND DEVELOPER
DEEP LANDMARK
ATHARVA ENTERPRISES
See every Palghar project, with the district possession charts
Builder: SANSKRUTI BUILDER AND DEVELOPER
SANSKRUTI BUILDER AND DEVELOPER has 4 registrations on MahaRERA, including SANSKRUTI SAPPHIRE and SANSKRUTI ROSE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SANSKRUTI ROSE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SANSKRUTI ROSE?
The registered promoter entity is SANSKRUTI BUILDER AND DEVELOPER, a partnership as per the filing. Its GSTIN 27AEPFS8662D1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SANSKRUTI ROSE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SANSKRUTI ROSE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SANSKRUTI ROSE?
The professionals named in the filing: Architect: ABHAY RAUT; Engineer: K C SHAH CONSULTANTS; Engineer: AAKASH TIWARI; Chartered Accountant: S B JAIN AND ASSOCIATES; Chartered Accountant: JPM AND ASSOCIATES; Chartered Accountant: Manish Shinde & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANSKRUTI ROSE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback