Home / Browse projects / Pune, Maharashtra / Sanskruti Oriana

Registered No litigation declared Others project

Sanskruti Oriana

By AGAC Developers LLP

RG-MH-31515 · RERA P52100079850 · Last updated on MahaRERA portal: 8 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months from the original
9 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 50%
29 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Sanskruti Oriana is a Others project by AGAC Developers LLP in Pune, Maharashtra, registered with MahaRERA as P52100079850 on 28 Mar 2025. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 43 of the 72 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.

At a glance

Project

  • NameSanskruti Oriana
  • TypeOthers
  • Location
    • Wagholi
    • Wagholi Pune
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100079850
  • ReraGenie IDRG-MH-31515

Builder

  • NameAGAC Developers LLP
  • Entity typePartnership
  • PartnersSUNIL AGARWAL, ANAND AGARWAL, SATYAKAMAL LANMARK LLP THROUGH DINESH GUPTA DINESH GUPTA, DILIP RAMESHWARDAS AGARWAL

Key dates

this monthRegisteredMar 2025First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Mar 2025
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings3 building records
  • Documents filed54 files

Current status

60%43 of 72 units booked
53.2%Work done, per cost certificate

Figures as on 8 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA6416016
D WingNA9728028
E WingNA9728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 50%.

C WING30%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D Wing39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E Wing39%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed114

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots114
Closed/Covered114
BuildingClosed/CoveredTotal
C WING2424
D Wing4545
E Wing4545

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,825 sq m
Land owned byNot the promoter
Named landowners5
Declared on10 Jun 2025
LandownerVillageDistrict
Hemchand Mangalsen GuptaWAGHOLIPune
Amit Rajendra GuptaWAGHOLIPune
Sumit Rajendra GuptaWAGHOLIPune
Ashokkumar Mangalsen GuptaWAGHOLIPune
Pawankumar Mangalsen GuptaWAGHOLIPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI12052.0
Proposed, not sanctioned6,108 sq m
Buildings approved5
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.1, BIG INDIA, BIG INDIA CHOWK,PRADHIKARAN 16/27, NIGDI,PUNE - 411044, TOLL FREE NO. - 18004194332
Estimated costRs 15.80 cr
Cost incurredRs 8.40 cr
Work done53.16%
BuildingWingEstimatedIncurred
D WingNARs 5.77 crRs 3.07 cr
E WingNARs 5.15 crRs 2.74 cr
C WINGNARs 3.30 crRs 1.75 cr
-NARs 1.58 crRs 83.99 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architects and Associates
EngineerSunil Kalore
EngineerSURAJ ADAHALE
Chartered AccountantNavdeep Jindal & Associates
Chartered AccountantCA Dolly Gandhi
PartnerRole in project
AGAC Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100079850/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Mar 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A.pdf8 Sep 2026
Form 5 (FY 2025-2026)File: Form 5 AGAC Sign.pdf8 Sep 2026
Withdrawal Update Form 1File: Form-1.pdf7 Jul 2026
Withdrawal Update Form 2File: Form-2 Jun_26.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 - AGAC Developers Jun_26 Sign.pdf7 Jul 2026
Withdrawal Update Form 1File: Form -1.pdf6 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar_26.pdf6 Apr 2026
Withdrawal Update Form 3File: Form 3 - AGAC Developers MAr_26 Sign.pdf6 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Sign.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf17 Oct 2025
Withdrawal Update Form 2File: Form-2.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 signed_compressed.pdf17 Oct 2025
Withdrawal Update Form 1File: Form-1.pdf11 Jul 2025
Withdrawal Update Form 2File: Form-2.pdf11 Jul 2025
Withdrawal Update Form 3File: Form-3 Signed_.pdf11 Jul 2025
Form 1File: 10 Architect certificate.pdf10 Jun 2025
Form 2File: 11 FORM-2.pdf10 Jun 2025
Form 3File: form 3 signed agac.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventory.pdf10 Jun 2025
Withdrawal Update Form 1File: 10 Architect certificate.pdf10 Jun 2025
Withdrawal Update Form 2File: 11 FORM-2.pdf10 Jun 2025
Withdrawal Update Form 3File: form 3 signed agac.pdf10 Jun 2025
Proforma of Agreement for saleFile: AGAC Rera Draft FINAL 1 19 03 25.pdf25 Mar 2025
Layout approvalFile: 1 Layout_compressed.pdf8 Mar 2025
Building plan approvalFile: 2-3-4 compressed.pdf8 Mar 2025
PAN CardFile: 1 AGAC PAN.pdf8 Mar 2025
Copy of the legal title reportFile: 2 Search Title Report_compressed.pdf8 Mar 2025
Details of encumbrances concerned to FinanceFile: 3 No Encumbrances Letter_Finance_.pdf8 Mar 2025
Details of encumbrances concerned to FinanceFile: 4 No Encumbrances Letter_Legal_.pdf8 Mar 2025
Copy of Layout Approval (in case of layout)File: 1 Layout_compressed.pdf8 Mar 2025
Proforma of Allotment letterFile: AGAC model form of allotment letter.pdf8 Mar 2025
Declaration in FORM BFile: 9 Promoter Declaration_FORM B P_compressed.pdf8 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect certificate.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 16 form 3 signed agac.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 FORM-2.pdf8 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf8 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2-3-4 compressed.pdf8 Mar 2025
Other - LegalFile: Landowner Declaration.pdf8 Mar 2025
Other - LegalFile: AGAC Partnership Deed com.pdf8 Mar 2025
Disclosure of sold/ booked inventoryFile: 14 Disclosure Of Sold Booked Inventory.pdf8 Mar 2025
Declaration about Commencement CertificateFile: 8 Declaration of CC_Circular 32.pdf8 Mar 2025
CERSAI detailsFile: 15 CERSAI_.pdf8 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 25 format A.pdf8 Mar 2025
Deviation Report with respect to Allotment letterFile: 28 no deviation from allotment letter.pdf8 Mar 2025
Details of encumbrances concerned to LegalFile: 3 No Encumbrances Letter_Finance_.pdf8 Mar 2025
Details of encumbrances concerned to LegalFile: 4 No Encumbrances Letter_Legal_.pdf8 Mar 2025
Other - FinanceFile: Landowner Declaration.pdf8 Mar 2025
Other - TechnicalFile: 33 ANNEXURE - A declaration for one plot one project.pdf8 Mar 2025
Deviation Report with respect to model copy of AgreementFile: 29 no deviation from agreement.pdf8 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 17 disclosure of interest in other real esate org.pdf8 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 26 format B.pdf8 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: 13 Disclosure for Secured or unsecured finance availed for the project.pdf8 Mar 2025

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sanskruti Oriana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi Pune13,700+ in Pune

Builder: AGAC Developers LLP

AGAC Developers LLP has 1 registration on MahaRERA, including Sanskruti Oriana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sanskruti Oriana is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sanskruti Oriana?

The registered promoter entity is AGAC Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sanskruti Oriana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sanskruti Oriana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sanskruti Oriana?

The professionals named in the filing: Architect: Cubix Architects and Associates; Engineer: Sunil Kalore; Engineer: SURAJ ADAHALE; Chartered Accountant: Navdeep Jindal & Associates; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sanskruti Oriana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sanskruti Oriana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sanskruti Oriana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.