Home / Browse projects / Mumbai Suburban, Maharashtra / SANSKRUTI BUILDING NO 2 C WING

Registered Litigation declared Residential / Group Housing project

SANSKRUTI BUILDING NO 2 C WING

By NIRMAN REALTORS AND DEVELOPERS LTD

RG-MH-50979 · RERA P51800007436 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 3 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
2 of 11Construction stages donefurthest along: Internal walls, 71%
25 of 38Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

SANSKRUTI BUILDING NO 2 C WING is a Residential / Group Housing project by NIRMAN REALTORS AND DEVELOPERS LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007436 on 17 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 13 of the 38 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSANSKRUTI BUILDING NO 2 C WING
  • TypeResidential / Group Housing
  • Location
    • Natwar Road
    • Sanskruti Nirman CHSLTD
    • Andheri
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007436
  • ReraGenie IDRG-MH-50979

Builder

  • NameNIRMAN REALTORS AND DEVELOPERS LTD
  • Entity typeCompany
  • Managing DirectorKUNDA SURYAKANT PARAB
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed91 files

Current status

34%13 of 38 units booked
54.2%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANSKRUTI BUILDING NO 2 C WINGNA111037138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 71%.

SANSKRUTI BUILDING NO 2 C WING: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.71%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered4
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,073 sq m
Land owned byThe promoter, with other names on the file
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI2242.47
Proposed, not sanctioned2,242 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULJI AADARSH BLDG VILLE PARLE EAST
Estimated costRs 7.68 cr
Cost incurredRs 4.16 cr
Work done54.2%
BuildingWingEstimatedIncurred
SANSKRUTI BUILDING NO 2 C WINGNARs 6.64 crRs 3.90 cr
-NARs 1.03 crRs 25.80 lakh

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKen Assist
EngineerEr. Rajesh Sundar Arunachalam
EngineerM/s. SU Consultants as Structural Consultant
EngineerEr.Nishant Amberkar
EngineerSwaraj P Surana
EngineerKiran A Kurhade
Chartered AccountantC.A. Mandar B. Bhave HMA & Associates
Chartered AccountantKATARE BARWE & ASSOCIATES
Chartered AccountantRahul Thakkar
Chartered AccountantUmesh Kamath
PartnerRole in project
NIRMAN REALTORS AND DEVELOPERS LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26122519040Dec 2025 → Dec 2026

Reason as filed by the promoterThe project could not be completed within the approved timeline due to unavoidable delays caused by labour shortages, intermittent disruption in availability of construction materials, and delays in statutory approvals from concerned authorities. These factors were beyond the control of the Promoter and impacted the progress of construction.

Litigation declared2

CaseCourtStatus
203594/2013CITY CIVIL COURTDISPOSED
WP 752/2015HIGH COURTDISMISSED

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000199143Ramesh Vishnu KhedaskarM/s Nirman Realtors and Developers Ltd04/12/2021
CC006000000199163Rashmi Kedasar,Harshali Khedaskar and Nikhil KhedaskarM/s Nirman Realtors and Developers Ltd04/12/2021
CC12502568Manoj JaiswalNIRMAN REALTORS AND DEVELOPERS LTD26/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Plan 1-3_compressed.pdf18 Jun 2026
Building plan approvalFile: Plan 2-3_compressed.pdf18 Jun 2026
Building plan approvalFile: Plan 3-3_compressed.pdf18 Jun 2026
Withdrawal Update Form 1File: SN Form 1 - Mar 26.pdf5 May 2026
Withdrawal Update Form 2File: Sanskruti Nirman Form 2 March 26.pdf5 May 2026
Withdrawal Update Form 3File: Sanskruti Nirman Form 3 Mar 26.pdf5 May 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Sanskruti Nirman Form 1 Jun 25.pdf24 Dec 2025
Withdrawal Update Form 1File: Sanskruti Nirman Form 1 Sep 25.pdf24 Dec 2025
Withdrawal Update Form 1File: Sanskruti Nirman Form 1 Sep 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Sanskruti Nirman Form 2 Jun 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Sanskruti Nirman Form 2 Sep 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Sanskruti Nirman Form 2 Sep 25.pdf24 Dec 2025
Withdrawal Update Form 3File: Sanskruti Nirman Form 3 June 25.pdf24 Dec 2025
Withdrawal Update Form 3File: Sanskruti Nirman Form 3 Sep 25.pdf24 Dec 2025
Withdrawal Update Form 3File: Sanskruti Nirman Form 3 Sep 25.pdf24 Dec 2025
Building plan approvalFile: Sanskruti Nirman C wing Date 2025 Plan No 1_compressed.pdf19 Sep 2025
Building plan approvalFile: Sanskruti Nirman C wing Date 2025 Plan 2_compressed.pdf19 Sep 2025
Building plan approvalFile: Sanskruti Nirman C Wing Date 2025 Plan No 3_compressed.pdf19 Sep 2025
Building plan approvalFile: Sanskruti Nirman C Wing IOA Date Aug 2025.pdf19 Sep 2025
Declaration and undertaking (Annexure A)File: Sanskruti Nirman C wing FCC Date Aug 2025.pdf19 Sep 2025
Form 1File: Sanskruti Nirman Rera Form1 Q4 Mar 25.pdf2 Jul 2025
Form 2File: Form 2 Sanskruti Nirman Mar 25.pdf2 Jul 2025
Form 3File: Sanskruti Nirman Form 3 Q4 Mar 25.pdf2 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sanakruti Nirman Disclosure of Sold and Book Inverory Q4 Mar 25.pdf2 Jul 2025
Form 2A (FY 2024-2025)File: Sanskruti Nirman C wing Form 2A.pdf2 Jun 2025
Certificates of CA (Form 3)File: Form 3 dated Q2 2024.pdf5 May 2025
Certificates of CA (Form 3)File: Form 3 dated Q3 2024.pdf5 May 2025
Certificates of CA (Form 3)File: Form 3 dated Q4 2025.pdf5 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti Nirman Architect's Certificate Rera Form 1 Q1.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti Nirman Architect's Certificate Rera Form 1 Q2.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti Nirman Architect's Certificate Rera Form 1 Q3.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanskruti Nirman Architect's Certificate Rera Form 1 Q4.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti Nirman Engineer Certificate Form 2 Q1.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti Nirman Engineer Certificate Form 2 Q2.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti Nirman Engineer Certificate Form 2 Q3.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti Nirman Engineer Certificate From 2 Q4.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA FORM 1 (1).pdf6 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti_form 2_ 31-03-2024.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_ 2021-2022_Sanskruti Nirman.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_ 2023-2024_Sanskruti Nirman.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_ 2023-2024_Sanskruti Nirman.pdf6 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 3.pdf22 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 6.pdf22 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER 9.pdf22 Jan 2024
PAN CardFile: NRDL Pan Card.pdf15 Sep 2023
PAN CardFile: NRDL Pan Card.pdf15 Sep 2023
PAN CardFile: NRDL Pan Card.pdf15 Sep 2023
Building Plan Approval (IOD)File: Sanskruti Nirman - Amended IOA Composite Building - 1 date 14-10-2021.pdf15 Sep 2023
Proforma of Agreement for saleFile: Sale Agreement C 701 Sanket Ghavate.pdf15 Sep 2023
Layout approvalFile: Sanskruti Nirman C wing IOA Layout Plan - 28-07-2021_compressed (1).pdf9 Sep 2023
Copy of Layout Approval (in case of layout)File: Sanskruti Nirman C wing IOA Layout Plan - 28-07-2021_compressed (1).pdf9 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: DocScanner 20-Mar-2023 12-43 pm.pdf9 Sep 2023
Declaration about Commencement CertificateFile: CC Sanskruti C Wing.pdf9 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 SNC 2021-22.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 5 SNC 2019-20.pdf21 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 SNC 2018-19.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 SNC 2018-19.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 SNC 2019-20.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 SNC 2020-21.pdf21 Feb 2023
Declaration in FORM BFile: NRDL.pdf24 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT_RERA_CERTIFICATE.pdf22 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanskruti - C - wing - Form 2-compressed.pdf7 Mar 2022
Building plan approvalFile: Sanskruti Nirman C wing Layout Plan-compressed.pdf24 Feb 2022
Building Plan Approval (IOD)File: Sanskruti Nirman C wing Layout Plan-compressed.pdf24 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sanskruti C wing_compressed.pdf13 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form_1_-_Sanskruti.PDF17 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form_2_-Sanskruti.PDF17 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sanskruti Nirman 15 Dec 2018.pdf25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sanskruti Nirman 18 Dec 2018.pdf25 Jan 2019
Certificates of CA (Form 5)File: Sanskriti Nirman C Wing.pdf14 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera_form_1__sanskruti_nirman_.PDF1 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form_2__sanskruti_nirman_.PDF1 Oct 2018
Certificates of CA (Form 3)File: Sanskruti Nirman.pdf23 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Declaration.PDF25 May 2018
Certificates of CA (Form 3)File: Form -3 final.pdf20 Apr 2018
Building plan approvalFile: IOA.pdf30 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SNEH NIRMANVILLAGE CHAMBHAR KIN TALUKA MAHAD49CompletedNov 2015Jul 2015
MADHU SUMITRA NIRMANAT GOREGAON TALUKA MANDGAON16CompletedJun 2011Jun 2011
SAI NIRMANNIRMAN NAGARI VILLAGE NERAL107CompletedMar 2011Mar 2011
NIRMAN AAKASHVILLAGE NERAL TALUKA KARJAT9CompletedJul 2007Jul 2007

How this compares with Mumbai Suburban

34%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANSKRUTI BUILDING NO 2 C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sanskruti Nirman CHSLTD6,700+ in Mumbai Suburban

2 kmSANSKRUTI BUILDING NO 2 Completed 100Lapsed / revoked 56Abeyance 1Other 123Dot size: filed unitsN

Filed coordinates, straight-line distance. 280 registered projects within 2 km.

Builder: NIRMAN REALTORS AND DEVELOPERS LTD

NIRMAN REALTORS AND DEVELOPERS LTD has 8 registrations on MahaRERA, including VIVIANA - BLOCK 1 and VIVIANA - BLOCK 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SANSKRUTI BUILDING NO 2 C WING is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANSKRUTI BUILDING NO 2 C WING?

The registered promoter entity is NIRMAN REALTORS AND DEVELOPERS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANSKRUTI BUILDING NO 2 C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SANSKRUTI BUILDING NO 2 C WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SANSKRUTI BUILDING NO 2 C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANSKRUTI BUILDING NO 2 C WING?

The professionals named in the filing: Architect: Ken Assist; Engineer: Er. Rajesh Sundar Arunachalam; Engineer: M/s. SU Consultants as Structural Consultant; Engineer: Er.Nishant Amberkar; Engineer: Swaraj P Surana; Engineer: Kiran A Kurhade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANSKRUTI BUILDING NO 2 C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANSKRUTI BUILDING NO 2 C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANSKRUTI BUILDING NO 2 C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.