sanghvi ATLANTA

By atlanta properties

RG-MH-20831 · RERA P51800006480 · Last updated on MahaRERA portal: 1 Sep 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • 32 complaints at MahaRERA
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
32Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

sanghvi ATLANTA is a Residential / Group Housing project by atlanta properties in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006480 on 14 Aug 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 18 months from the original filing. 32 complaints are on record with the regulator.

At a glance

Project

  • Namesanghvi ATLANTA
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006480
  • ReraGenie IDRG-MH-20831

Builder

  • Nameatlanta properties
  • Entity typePartnership
  • PartnersPushpraj Vimalchand Rathod, Pratik Pramod Salvi, Pakshal Prithviraj Sanghvi

Key dates

28 months past promisethis monthRegisteredAug 2017First promiseDec 2022Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
sanghvi ATLANTANA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

sanghvi ATLANTA: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 1 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered39

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,140 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3412.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchveer sawarkar path,thane west 400601

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantosh Shelke
EngineerRajan Tipnis
PartnerRole in project
atlanta properties-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017337Dec 2022 → Jun 2024

Reason as filed by the promoterWe are facing the worst labour and financial issue in this time because of that we are to go ahead with construction of the building. Due to scarcity of demand in housing industry, we hereby revised the plan with compact flats instead of huge flats to get best sale in the project and for the survival of the Project. Also note that, for getting further permission from department, we were made to revise “LOI” and “IOA” as per current DCPR 2034 and also major changes in rehabilitating slum dwellers from 270 sq.ft. to 300 sq.ft. area as per new DCPR 2034 regulation. As per increase in FSI under DC

EXT51800013091Dec 2022 → Jun 2023

Reason as filed by the promoterDue to unavoidable circumstances where whole world is fighting not just for Covid - 19 pandemic but also difficult to survive financially. We are facing the worst labour and financial issue in this time because of that we are to go ahead with construction of the building. Due to scarcity of demand in housing industry, we hereby revised the plan with compact flats instead of huge flats to get best sale in the project and for the survival of the Project. Also note that, getting the permission from department as majority of government department are working on a low key basis. As per increase in

Complaints filed with MahaRERA32

Case no.ComplainantRespondentFiled
CC006000000292710MAHESH MAHADEV TAWADEAtlanta Properties26/09/2022
CC006000000333952Domnic Rosario JamesPramod Salvi13/04/2024
CC006000000396893SAGINA ZAKIR SAYYADM/S Atlanta Properties16/01/2024
CC006000000397546Arati Santosh GhadigaonkarAtlanta Properties21/09/2023
CC006000000397728Mahesh Madhukar KadamAtlanta Properties08/12/2023
CC006000000397729Nilesh Suryakant KavadeAtlanta Properties08/12/2023
CC006000000397730Prashant D ShelarAtlanta Properties08/12/2023
CC006000000397731Ashokkumar PrajapatiAtlanta Properties08/12/2023
CC006000000397732Shivsharan Rammanohar GuptaAtlanta Properties08/12/2023
CC006000000408475Sameedha Sachin NawageM/S Atlanta Properties04/01/2024
CC006000000428862Sujata Sadashiv BachalM/s. Atlanta Properties20/03/2024
CC006000000429183Ajay Sitaram BirwatkarAtlanta Properties10/02/2024
CC006000000429187Vinayak RaneAtlanta Properties10/02/2024
CC006000000429188Prashant Yashwant BandalAtlanta Properties12/02/2024
CC006000000429189Dibya Kanti MaitiAtlanta Properties10/02/2024
CC006000000429192Sanjay SolankiAtlanta Properties10/02/2024
CC006000000429229Anup Kumar PalAtlanta Properties13/02/2024
CC006000000429232Kamlesh DesaiAtlanta Properties17/02/2024
CC006000000429239Sameer Anant JuwatkarAtlanta Properties17/02/2024
CC006000000429293Senthil Kumar MayilvahanamAtlanta Properties20/02/2024
CC006000000429598Madhaba NayakAtlanta Properties30/05/2024
CC006000000429601Mahendra Laxman RaneAtlanta Properties11/03/2024
CC006000000429604Yogesh DevadigaAtlanta Properties21/03/2024
CC006000000479774MAHESH JAIRAM GHAGPratik Salvi03/04/2024
CC006000000479980Rahul Devendra SinghM/S. Atlanta Properties07/04/2024
CC006000000479986Vipul Gautam SatputePratik Salvi10/04/2024
CC006000000480078Sudhir Balkrishna GholapPramod Salvi15/04/2024
CC006000000480082sarika amogh yadavMR PRATIK SALVI15/04/2024
CC006000000480103SAHADEV SHANTARAM PARABATLANTA PROPERTIES23/04/2024
CC006000000480285Rashmi Prabhakar RasamAtlanta Properties30/04/2024
CC006000000580932Aarti Shailesh SatleAtlanta Properties26/06/2024
CC12401270Komal Ramchandra Yadavatlanta properties29/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AP Rera Form 5-FY 2019-20.pdf1 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - 18-19.pdf31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A (1).pdf28 Aug 2023
Certificates of CA (Form 3)File: Form 3.pdf28 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf28 Aug 2023
Declaration about Commencement CertificateFile: Form D.pdf16 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf16 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf16 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf16 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold:Unsold Units.pdf16 Mar 2023
Certificates of CA (Form 3)File: Form 3.pdf16 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 CA certified - AP.pdf16 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 .pdf16 Mar 2023
Certificates of CA (Form 5)File: FORM 5.pdf29 Sep 2018
Certificates of CA (Form 3)File: doc ca.pdf3 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf2 Aug 2017
Certificates of CA (Form 3)File: ca.pdf2 Aug 2017
Layout approvalFile: Slum Rehabilitation Authority.pdf31 Jul 2017
Building plan approvalFile: Slum Rehabilitation Authority.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certifictae(1).pdf31 Jul 2017
Details of encumbrancesFile: Declaration Towards Encumbrances.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Slum Rehabilitation Authority.pdf31 Jul 2017
Building Plan Approval (IOD)File: Slum Rehabilitation Authority.pdf31 Jul 2017
Declaration in FORM BFile: Affidavit.pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter 1.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep sanghvi ATLANTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmsanghvi ATLANTACompleted 46Lapsed / revoked 24Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: atlanta properties

atlanta properties has 1 registration on MahaRERA, including sanghvi ATLANTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that sanghvi ATLANTA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if sanghvi ATLANTA is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of sanghvi ATLANTA?

The registered promoter entity is atlanta properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in sanghvi ATLANTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against sanghvi ATLANTA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for sanghvi ATLANTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at sanghvi ATLANTA?

The professionals named in the filing: Architect: Santosh Shelke; Engineer: Rajan Tipnis. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in sanghvi ATLANTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About sanghvi ATLANTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save sanghvi ATLANTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.