Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Jan 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Slabs of Super Structure, 15%
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

Samta Parel is a Others project by Newlook Constructions Pvt. Ltd in 400012, registered with MahaRERA as P51900006654 on 16 Aug 2017. The registration is recorded completed; possession was promised by 1 Jan 2023.

At a glance

Project

  • NameSamta Parel
  • TypeOthers
  • Location
    • 400012
  • Pincode400012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900006654
  • ReraGenie IDRG-MH-25945

Builder

  • NameNewlook Constructions Pvt. Ltd
  • Entity typeCompany
  • DirectorBhavya Yogesh Visaria
  • Managing DirectorYogesh Premji Visaria
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedJan 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Aug 2017
  • Promised completion1 Jan 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Composite BldgNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 15%.

Composite Bldg: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)1%
Podiums (if any)0%
Plinth1%
Stilt Floor1%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,678 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI751.22
Proposed, not sanctioned751 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNIT NO 5 Wadala Udyog Bhavan Naigaon Cross Road Wadala Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNitin D Gunjal
EngineerDeepakkumar
Chartered AccountantNR GALA & Associates
PartnerRole in project
Newlook Constructions Pvt. Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Mar 2021

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC .pdf10 Mar 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Arch certificate .pdf10 Mar 2021
Building plan approvalFile: IOD .pdf2 Mar 2021
Layout approvalFile: OCC Plan 1.pdf2 Mar 2021
Copy of Layout Approval (in case of layout)File: OCC Plan 1.pdf2 Mar 2021
Building Plan Approval (IOD)File: IOD .pdf2 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: CC .pdf2 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 archt certificate .pdf2 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Certificate .pdf2 Mar 2021
Certificates of CA (Form 3)File: Form 3 CA certificate .pdf2 Mar 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 archt certificate .pdf2 Mar 2021
OtherFile: OCC Plan 2.pdf2 Mar 2021
OtherFile: OCC Plan 3.pdf2 Mar 2021
OtherFile: OCC plan 4.pdf2 Mar 2021
OtherFile: OCC Plan 5.pdf2 Mar 2021
Certificates of CA (Form 5)File: Samta-RERA.pdf31 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: SAMTA COMP BLDG CC 01.pdf3 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: SAMTA COMP BLDG CC 02.pdf3 Apr 2018
Declaration in FORM BFile: SAMTA 01 FORM B.pdf28 Aug 2017
Declaration in FORM BFile: SAMTA 002 FORM B.pdf28 Aug 2017
Declaration in FORM BFile: SAMTA 03 FORM B.pdf28 Aug 2017
Layout approvalFile: SAMTA LAYOUT LETTER.pdf8 Aug 2017
Building plan approvalFile: IOD BSA 09.pdf8 Aug 2017
Copy of the legal title reportFile: SAMTA TITLE REPORT 04.pdf8 Aug 2017
Details of encumbrancesFile: NO LITIGATION SAMTA A WING.pdf8 Aug 2017
Copy of Layout Approval (in case of layout)File: SAMTA LAYOUT LETTER.pdf8 Aug 2017
Building Plan Approval (IOD)File: IOD BSA 09.pdf8 Aug 2017
Declaration in FORM BFile: FORM B 02.pdf8 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE BSA 03.pdf8 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE 03.pdf8 Aug 2017
Certificates of CA (Form 3)File: CA SAMTA 06.pdf8 Aug 2017
Proforma of Allotment letterFile: NO FLAT SOLD IN SAMTA A WING.pdf8 Aug 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Bhavya HeightsKatrak Road96CompletedDec 2012Apr 2012
Bhavya SupremeA.D Marg66CompletedMay 2012May 2012

Keep Samta Parel on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmSamta ParelCompleted 27Lapsed / revoked 12Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Newlook Constructions Pvt. Ltd

Newlook Constructions Pvt. Ltd has 4 registrations on MahaRERA, including Samta Parel and Satguru Antop Hill. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Samta Parel is delayed beyond 1 Jan 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samta Parel?

The registered promoter entity is Newlook Constructions Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samta Parel?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samta Parel?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samta Parel?

The professionals named in the filing: Architect: Nitin D Gunjal; Engineer: Deepakkumar; Chartered Accountant: NR GALA & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samta Parel?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samta Parel. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samta Parel to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.